Fixede768s Sat Jul 27 21:12:47 2019 teodora & beyhanOTHERHardware cout rate with no beam & water level checkAround 9 pm, we observed an average count
rate of 30kHz on the "or agata" scaler rates
panel of GECO. The other count rates were
 6x 
Fixede768s Sat Jul 27 21:40:16 2019 mugastRUNGeneralLiFRun 154_5   19x 
Fixede768s Sat Jul 27 22:22:21 2019 teodora & beyhanVAMOSHardware FP_DC_Wi1 tripped -->FixedFP_DC_Wi1 tripped. We set back power supply
on the wire
=> fixed
  
Fixede768s Sun Jul 28 01:11:41 2019 Jenn and AndresONLINEGeneralLiFScreenshots run 154 @ 01h00   19x 
Fixede768s Sun Jul 28 01:49:25 2019 Jenn and AndresONLINEGeneralLiFBeam profile and scaler run 154 overnightOR VAMOS ~ 500
BEAM Profiler ~ 1.4e7
 Scalers_run154_6.pngBeam_profiler.jpg 
Fixede768s Sun Jul 28 03:26:54 2019 Jenn and AndresRUNGeneralLiFSTOP RUN 154At 3:00 am beam went off. We called PCP and
they told us that they had some problems
they need to fix and that it might take long.
  
FixedTEST Sun Jul 28 04:02:25 2019 OttoH.V.OTHERHardwareN/AHVM_ERROR[SIZE=5][COLOR=red][B]*** hvm watcher error
***[/B] [/COLOR][/SIZE] 
 [SIZE=4][COLOR=green]FP_DC1_cat  [/COLOR]
  
Fixede768s Sun Jul 28 04:22:15 2019 Jenn, Andres and DanieleBEAMGeneralN/ABeam problems and DC trip- Updated from PCP about the problem with
the beam: cyclotron went down and estimation
of ~5h to have the beam back.
 IMG_20190728_043633.jpg 
FixedTEST Sun Jul 28 04:39:02 2019 OttoH.V.OTHERHardwareN/AHVM_SUMMARY[SIZE=5][COLOR=green][B]*** hvm watcher summary
***[/B] [/COLOR][/SIZE] 
 [SIZE=2][COLOR=green]            [/COLOR]
  
FixedTEST Sun Jul 28 04:39:02 2019 OttoH.V.OTHERHardwareN/AHVM_SUMMARY[SIZE=5][COLOR=green][B]*** hvm watcher summary
***[/B] [/COLOR][/SIZE] 
 [SIZE=2][COLOR=green]+10v/mg     [/COLOR]
  
Fixede768s Sun Jul 28 08:20:38 2019 Sylvain & FrancoRUNGeneral Update on possible restartThe problem that caused the interruption was
due to a failure in the cooling system.
The last update we've had is that we might
  
FixedTEST Sun Jul 28 13:42:10 2019 OttoH.V.OTHERHardwareN/AHVM_SUMMARY[SIZE=5][COLOR=green][B]*** hvm watcher summary
***[/B] [/COLOR][/SIZE] 
 [SIZE=2][COLOR=green]            [/COLOR]
  
FixedTEST Sun Jul 28 13:42:10 2019 OttoH.V.OTHERHardwareN/AHVM_SUMMARY[SIZE=5][COLOR=green][B]*** hvm watcher summary
***[/B] [/COLOR][/SIZE] 
 [SIZE=2][COLOR=green]+10v/mg     [/COLOR]
  
Fixede768s Sun Jul 28 14:57:26 2019 Franco & SylvainBEAMGeneralN/ABeam problems and DC tripThe HV and the vacuum in VAMOS are now recovered
and back to the normal values. The water
tray is 20% filled and under control. Mugast
  
Fixede768s Sun Jul 28 16:23:48 2019 NicolasRUNGeneral Update on possible restartSame situation as before lunch, the beam is
still in C0 and not yet in CSS1. We may have
beam in late evening....
  
Ongoinge768s Sun Jul 28 19:58:57 2019 NicolasRUNGeneral Update on possible restartBeam is now at the exit of CSS2 though We
may have beam around midnight....[/quote]
  
Fixede768s Sun Jul 28 21:59:43 2019 NicolasRUNGeneral Update on possible restartBeam is in G1 with 3e6 pps. PCP will optimize
for about 1-1,5h before we take the beam.
  
FixedTEST Sun Jul 28 22:46:22 2019 OttoH.V.OTHERHardwareN/AHVM_SUMMARY[SIZE=5][COLOR=green][B]*** hvm watcher summary
***[/B] [/COLOR][/SIZE] 
 [SIZE=2][COLOR=green]+10v/mg     [/COLOR]
  
FixedTEST Sun Jul 28 22:46:23 2019 OttoH.V.OTHERHardwareN/AHVM_SUMMARY[SIZE=5][COLOR=green][B]*** hvm watcher summary
***[/B] [/COLOR][/SIZE] 
 [SIZE=2][COLOR=green]            [/COLOR]
  
Fixede768s Mon Jul 29 00:46:17 2019 OttoRunRUNGeneralLiFRun155*************************
  [SIZE=3][B]Run  : 155[/B][/SIZE]
*************************
  