MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 90 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Categorydown Target-Source Subject
Fixede786s Mon Jul 1 17:09:45 2019 OttoRunRUNGeneralCryo-3HeRun100
*************************
Run : 100
*************************

Start at 2019-07-01 17:09:01.651618

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 820 mbar
We are filling the target to reach 1000 mbar


test cats1

time calibration run

New line added just for clarity!!!

Bye Bye!
Salut!

Ok! Ok!

Stop at 2019-07-01 17:32:44.640169
Stop comment:
Fixede744s Mon Jul 1 17:32:40 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 144
- MUVI: MUVI3
- Side : MUFEE X (Junction)
- Telescope: 1, 2, 3, 4
Fixede786s Mon Jul 1 17:32:46 2019 OttoRunRUNGeneralCryo-3HeRun101
*************************
Run : 101
*************************

Start at 2019-07-01 17:32:41.600588

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 820 mbar
We are filling the target to reach 1000 mbar


test cats1

time calibration run

New line added just for clarity!!!

Bye Bye!
Salut!

Ok! Ok!

Stop at 2019-07-01 17:55:52.679255
Stop comment:
Fixede744s Mon Jul 1 17:56:06 2019 OttoTimeRUNGeneralN/ATimeCalibratorRun
*** Run Time Calibrator FSC ***
- Run: 144
- MUVI: MUVI3
- Side : MUFEE Y (Ohmic)
- Telescope: 1, 2, 3, 4
Fixede786s Mon Jul 1 17:56:10 2019 OttoRunRUNGeneralCryo-3HeRun102
*************************
Run : 102
*************************

Start at 2019-07-01 17:56:07.663936

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 820 mbar
We are filling the target to reach 1000 mbar


test cats1

time calibration run

New line added just for clarity!!!

Bye Bye!
Salut!

Ok! Ok!
Fixede786s Mon Jul 1 17:56:36 2019 OttoRunRUNGeneralCryo-3HeRun95
*************************
Run : 95
*************************

Start at 2019-07-01 15:15:38.418712

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 820 mbar
We are filling the target to reach 1000 mbar


test cats1

time calibration run

New line added just for clarity!!!

Bye Bye!
Salut!

Ok! Ok!
Fixede786s Tue Jul 2 10:30:10 2019 OttoRunRUNGeneralCryo-3HeRun96
*************************
Run : 96
*************************

Start at 2019-07-01 15:39:55.733031

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 820 mbar
We are filling the target to reach 1000 mbar


test cats1

time calibration run

New line added just for clarity!!!

Bye Bye!
Salut!

Ok! Ok!

Stop at 2019-07-02 10:30:11.518345
Stop comment:

Stop at 2019-07-02 10:30:44.954507
Stop comment:
Fixede768s Thu Jul 11 15:12:21 2019 OttoRunRUNGeneral3-alphaRun301
*************************
Run : 301
*************************

Start at 2019-07-11 15:07:27.670320

3 alpha calibration run
+ without MM2 masks
+ non suppressed pedestals

Square detectors:
+ MG10: all X strips masked; mate 14 & 16 masked
+ MG9: all X & Y strips masked

Stop at 2019-07-11 16:52:55.206383
Stop comment: stopping run to put pedestal suppression
Fixede768s Thu Jul 11 16:54:34 2019 OttoRunRUNGeneral3-alphaRun302
*************************
Run : 302
*************************

Start at 2019-07-11 16:54:22.512184

3 alpha calibration run
+ without MM2 masks
+ suppressed pedestals

Square detectors:
+ MG10: all X strips masked; mate 14 & 16 masked
+ MG9: all X & Y strips masked

Stop at 2019-07-12 05:44:35.805449
Stop comment:
Fixede768s Fri Jul 12 12:07:56 2019 mugastOTHERGeneralN/AMasks for MUST2
Masks for MUST2 are now mounted.

NOTE: one mask is not properly screwed (top left) and should be mounted again on Monday morning when we open.

Masks cover theta_lab < 38 deg, corresponding to < 30 pps of 15O for 15O+19F elastic channel assuming 2e7 pps of 15O and 1.25 mg/cm2 of LiF.
Fixede768s Fri Jul 12 15:04:35 2019 OttoRunRUNGeneral3-alphaRun303
*************************
Run : 303
*************************

Start at 2019-07-12 15:03:55.487806

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals

Square detectors:
+ MG10: all X &Y strips masked;
+ MG9 removed

Stop at 2019-07-12 15:05:24.820669
Stop comment: type your message here
Fixede768s Fri Jul 12 15:05:42 2019 OttoRunRUNGeneral3-alphaRun303
*************************
Run : 303
*************************

Start at 2019-07-12 15:05:39.990342

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals

Square detectors:
+ MG10: all X &Y strips masked;
+ MG9 removed

Stop at 2019-07-12 15:21:45.059356
Stop comment:

Stop at 2019-07-12 16:21:07.294470
Stop comment: type your message here
Fixede768s Fri Jul 12 16:22:04 2019 OttoRunRUNGeneral3-alphaRun303
*************************
Run : 303
*************************

Start at 2019-07-12 16:22:02.189158

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals

Square detectors:
+ MG10: all X &Y strips masked;
+ MG9 removed

Stop at 2019-07-12 16:33:58.493008
Stop comment: type your message here
Fixede768s Fri Jul 12 16:35:10 2019 OttoRunRUNGeneral3-alphaRun303
*************************
Run : 303
*************************

Start at 2019-07-12 16:35:04.481793

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals

Square detectors:
+ MG10: all X &Y strips masked;
+ MG9 removed

Stop at 2019-07-12 16:38:40.222071
Stop comment: type your message here
Fixede768s Fri Jul 12 16:42:22 2019 OttoRunRUNGeneral3-alphaRun303
JUNK
*************************
Run : 303
*************************

Start at 2019-07-12 16:41:50.518089

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals (new pedestal for all trap detectors)

Square detectors:
+ MG10: not biased
+ MG9 removed

Stop at 2019-07-12 16:43:54.495178
Stop comment: type your message here
Fixede768s Fri Jul 12 16:45:00 2019 OttoRunRUNGeneral3-alphaRun304
JUNK
*************************
Run : 304
*************************

Start at 2019-07-12 16:44:54.903528

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals (new pedestal for all trap detectors)

Square detectors:
+ MG10: not biased
+ MG9 removed

Stop at 2019-07-12 16:46:13.603283
Stop comment:
Fixede768s Fri Jul 12 16:58:52 2019 OttoRunRUNGeneral3-alphaRun305
JUNK
*************************
Run : 305
*************************

Start at 2019-07-12 16:58:50.871657

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals (new pedestal for all trap detectors)

Square detectors:
+ MG10: not biased
+ MG9 removed

Stop at 2019-07-12 17:00:35.578929
Stop comment: type your message here
Fixede768s Fri Jul 12 17:08:58 2019 OttoRunRUNGeneral3-alphaRun305
JUNK no pedestal suppression on MG3
*************************
Run : 305
*************************

Start at 2019-07-12 17:08:47.400117

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals (new pedestal for all trap detectors)

Square detectors:
+ MG10: not biased
+ MG9 remove

Pedestals shifted on MG3 due to noise on one over 2 mates

Stop at 2019-07-12 17:16:35.681417
Stop comment:
Fixede768s Fri Jul 12 17:17:22 2019 OttoRunRUNGeneral3-alphaRun306
*************************
Run : 306
*************************

Start at 2019-07-12 17:17:19.657074

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals (new pedestal for all trap detectors)

Square detectors:
+ MG10: not biased
+ MG9 removed

Stop at 2019-07-14 21:18:42.648096
Stop comment: stopping for heating cooling system after unbiasing MUGAST

Stop at 2019-07-15 15:36:28.594934
Stop comment: type your message here

Stop at 2019-07-15 16:25:22.582232
Stop comment: type your message here

Stop at 2019-07-15 18:02:50.677903
Stop comment: changing ADC channel for T_AGATA_HF
Fixede768s Fri Jul 12 17:51:06 2019 mugast (Sylvain, Chloe, François, Marlène, Nicolas)OTHERGeneral Monitoring of beam profile with BAF2
In order to provide a efficient way for PCP to monitor beam profile a new TAC measurement has set up.

A BAF2 detector has been inserted close to the reaction chamber (in position 7 of AGATA structure frame). Operating voltage of BaF2 is 1800V and the typical signal amplitude is above 100 mV.
The output signal is sent to a TFA (with gain =1). No additional delay was used. The BAF2 trigger signal is made from CFD and used as a start a TAC. TAC range was chosen to 1us.

The trigger signal was also sent to GMT trough input nb 5.




ELOG Home Page