MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 76 of 132  Not logged in MUGAST
Fixed, e744s, Fri Apr 12 21:43:16 2019, OttoRun, RUN, General, CH2, Run114 
*************************
Run : 114
*************************

Start at 2019-04-12 21:42:12.558669

Run Conditions:
  • Operator: Louis,Antoine
  • Trigger: MUGAST + Vamos %100
  • No target
  • Beam: 14O
  • Intensity: variable
  • Brho = 0.6912 Tm
  • CATS2 in

Comment:

VAMOS is Open

Stop at 2019-04-12 22:04:01.062421
Stop comment: test run
Fixed, e744s, Fri Apr 12 22:00:42 2019, Diego, TARGET, General, , very different target thickness Very_different_target_thickness.png
Fixed, e744s, Fri Apr 12 22:16:33 2019, OttoRun, RUN, General, CH2, Run115 20190412_221713.jpg
*************************
Run : 115
*************************

Start at 2019-04-12 22:15:31.632167

Run Conditions:
  • Operator: Louis,Antoine
  • Trigger: MUGAST + Vamos %100
  • Target #3
  • Beam: 14O
  • Intensity: variable
  • Brho = 0.5473 Tm
  • CATS2 in

Comment:

VAMOS is Open

Stop at 2019-04-12 22:25:11.807535
Stop comment: Stopin to change Brho
Fixed, e744s, Fri Apr 12 22:28:15 2019, OttoRun, RUN, General, CH2, Run116 
*************************
Run : 116
*************************

Start at 2019-04-12 22:27:56.420427

Run Conditions:
  • Operator: Louis,Antoine
  • Trigger: MUGAST + Vamos %100
  • Target #3
  • Beam: 14O
  • Intensity: variable
  • Brho = 0.5199 Tm
  • CATS2 in

Comment:

VAMOS is Open

Stop at 2019-04-12 22:32:41.994133
Stop comment:
Fixed, e744s, Fri Apr 12 22:33:22 2019, OttoRun, RUN, General, CH2, Run117 
*************************
Run : 117
*************************

Start at 2019-04-12 22:32:45.436663

Run Conditions:
  • Operator: Antoine
  • Trigger: MUGAST + Vamos %100
  • Target #3
  • Beam: 14O
  • Intensity: variable
  • Brho = 0.5199 Tm
  • CATS2 in
  • Finger Plancement

Comment:
Moving The finger
VAMOS is Open

Stop at 2019-04-12 22:39:59.872754
Stop comment: finger position at +12 mm
Fixed, e744s, Fri Apr 12 22:40:26 2019, OttoRun, RUN, General, CH2, Run118 
*************************
Run : 118
*************************

Start at 2019-04-12 22:40:07.011114

Run Conditions:
  • Operator: Antoine
  • Trigger: MUGAST + Vamos %100
  • Target #3
  • Beam: 14O
  • Intensity: variable
  • Brho = 0.5199 Tm
  • CATS2 in
  • Finger at +12 mm

Comment:
Moving The finger
VAMOS is Open

Stop at 2019-04-12 23:02:06.020781
Stop comment: Stoping to change CATS (1->%30000) and VAMOS Div (100->1000)
Fixed, e744s, Fri Apr 12 23:17:13 2019, OttoRun, RUN, General, CH2, Run119 
*************************
Run : 119
*************************

Start at 2019-04-12 23:15:13.390175

Run Conditions:
  • Operator: Antoine
  • Trigger: MUGAST + Vamos %1000 + CATS %30000
  • Target #3
  • Beam: 14O
  • Intensity: ~6e4
  • Brho = 0.5199 Tm
  • CATS2 in
  • Finger at +12 mm
  • WITH AGATA


Comment:
VAMOS is Open
AGATA Coupling

Stop at 2019-04-13 00:42:48.531750
Stop comment: beam down because of heating
Fixed, e744s, Sat Apr 13 00:32:09 2019, Faïrouz, Iulian, Antoine & co, BEAM, General, N/A, Tests to understand the broad width (120 mm!!!) of the beam size at the FP of VAMOS 

Test 1: 14O beam on CH2 target (number 2= 105 um) and CATS2 inside:
The beam size in the FP of VAMOS was found of about: 150 mm !!!

Test 2: 14O beam on target with hole (Diameter of the hole=7mm) and CATS2 out
The beam size in the FP of VAMOS was found of about: 3 mm (to be checked with the run 112)

Test3: 14O beam on target with hole (Diameter of the hole=7mm) and CATS2 in
The beam size in the FP of VAMOS was found of about: 20 mm (to be checked with the run 113)

Test4: 14O beam on empty target and CATS2 inside
The beam size in the FP of VAMOS was found of about: 30 mm (to be checked with the run 114)

==> The problem of huge broadening of the beam size in test 1 was not due to straggling in CATS2

Test 5: 14O beam on CH2 target (number 3= 90 um, the same target that was used with 14N beam) and CATS2 inside:
The beam size in the FP of VAMOS was found of about: ~ 30 mm (to be checked with the run 115)
Bingo Happy





===> Target CH2 number 2 (105 um) has big inhomogenity problems or heavy impurities???
Fixed, e744s, Sat Apr 13 04:18:00 2019, OttoRun, RUN, General, CH2, Run120 
*************************
Run : 120
*************************

Start at 2019-04-13 04:16:55.016739

Run Conditions:
  • Operator: Mariluz Nikola Nicolas
  • Trigger: MUGAST + Vamos %1000 + CATS %30000
  • Target #3
  • Beam: 14O
  • Intensity: ~2e4
  • Brho = 0.5199 Tm
  • CATS2 in
  • Finger at +12 mm
  • WITH AGATA


Comment:
VAMOS is Open
AGATA Coupling

Stop at 2019-04-13 05:59:11.698155
Stop comment: CATS Internal trip

Stop at 2019-04-13 06:20:42.444844
Stop comment: VAMOS cut off
Fixed, e744s, Sat Apr 13 04:35:43 2019, Mariluz Nikola Nicolas, BEAM, General, CH2, Beam was back for 10 min, and lost after efficiency problem in CSS2 
VAMOS and MUGAST spectra were checked after the beam was back. Everything looks OK (e.g. similar to previous screenshots)

Waiting for beam again....
Fixed, e744s, Sat Apr 13 05:10:01 2019, Mariluz Nikola Nicolas, BEAM, General, CH2, Beam is back @ 2e4 pps (CATS) 
Beam is back, yeah!
Fixed, e744s, Sat Apr 13 06:31:51 2019, OttoRun, RUN, General, CH2, Run122 
*************************
Run : 122
*************************

Start at 2019-04-13 06:31:24.179531

Run Conditions:
  • Operator: Mariluz Nikola Nicolas
  • Trigger: MUGAST + Vamos %1000 + CATS %30000
  • Target #3
  • Beam: 14O
  • Intensity: ~4e4
  • Brho = 0.5199 Tm
  • CATS2 in
  • Finger at +12 mm
  • WITH AGATA


Comment:
VAMOS is Open
AGATA Coupling
Fixed, e744s, Sat Apr 13 06:33:35 2019, Mariluz Nikola Nicolas, RUN, General, CH2, Screenshots run120 v1 20x
FAG is 0 because screenshot was taken when run was stopped
Fixed, e744s, Sat Apr 13 10:23:01 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, ONLINE, General, CH2, Screenshots run 122 v3 20x
    Fixed, e744s, Sat Apr 13 10:32:59 2019, Iulian , ONLINE, General, CH2, Screenshots run 122 v3 
Is missing the scalers
Fixed, e744s, Sat Apr 13 11:44:21 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, General, CH2, tempory beam interruption 
ventilation problem SPIRAL& - beam stopped for presumably appro. 10 min (PCP info)

beam is back at 11:52 h
Fixed, e744s, Sat Apr 13 12:32:03 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, ONLINE, General, CH2, Scalers run122_scalers_v5.png
Fixed, e744s, Sat Apr 13 13:42:22 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, RUN, General, CH2, New run 122...1 generated after 4G on disk 
Fixed, e744s, Sat Apr 13 14:19:41 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, ONLINE, General, CH2, Scalers run122_scalers_v7.png
Fixed, e744s, Sat Apr 13 14:28:00 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, General, CH2, PCP information - beam interruption 
beam interrupted to an octupole (?) failure - prevision to be back after 10-15 min (PCB info)

14:35 h beam is back

ELOG Home Page