MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 76 of 132  Not logged in MUGAST
Fixed, e744s, Fri Apr 12 21:43:16 2019, OttoRun, RUN, General, CH2, Run114 
*************************
  [SIZE=3][B]Run  : 114[/B][/SIZE]
*************************
Fixed, e744s, Fri Apr 12 22:00:42 2019, Diego, TARGET, General, , very different target thickness Very_different_target_thickness.png
 
Fixed, e744s, Fri Apr 12 22:16:33 2019, OttoRun, RUN, General, CH2, Run115 20190412_221713.jpg
*************************
  [SIZE=3][B]Run  : 115[/B][/SIZE]
*************************
Fixed, e744s, Fri Apr 12 22:28:15 2019, OttoRun, RUN, General, CH2, Run116 
*************************
  [SIZE=3][B]Run  : 116[/B][/SIZE]
*************************
Fixed, e744s, Fri Apr 12 22:33:22 2019, OttoRun, RUN, General, CH2, Run117 
*************************
  [SIZE=3][B]Run  : 117[/B][/SIZE]
*************************
Fixed, e744s, Fri Apr 12 22:40:26 2019, OttoRun, RUN, General, CH2, Run118 
*************************
  [SIZE=3][B]Run  : 118[/B][/SIZE]
*************************
Fixed, e744s, Fri Apr 12 23:17:13 2019, OttoRun, RUN, General, CH2, Run119 
*************************
  [SIZE=3][B]Run  : 119[/B][/SIZE]
*************************
Fixed, e744s, Sat Apr 13 00:32:09 2019, Faïrouz, Iulian, Antoine & co, BEAM, General, N/A, Tests to understand the broad width (120 mm!!!) of the beam size at the FP of VAMOS 

Test 1: 14O beam on CH2 target (number 2= 105 um) and CATS2 inside: 
The beam size in the FP of VAMOS was found of about: 150 mm !!!
Fixed, e744s, Sat Apr 13 04:18:00 2019, OttoRun, RUN, General, CH2, Run120 
*************************
  [SIZE=3][B]Run  : 120[/B][/SIZE]
*************************
Fixed, e744s, Sat Apr 13 04:35:43 2019, Mariluz Nikola Nicolas, BEAM, General, CH2, Beam was back for 10 min, and lost after efficiency problem in CSS2 
VAMOS and MUGAST spectra were checked after the beam was back. Everything looks OK (e.g. similar to previous screenshots)

Waiting for beam again....
Fixed, e744s, Sat Apr 13 05:10:01 2019, Mariluz Nikola Nicolas, BEAM, General, CH2, Beam is back @ 2e4 pps (CATS) 
Beam is back, yeah!
Fixed, e744s, Sat Apr 13 06:31:51 2019, OttoRun, RUN, General, CH2, Run122 
*************************
  [SIZE=3][B]Run  : 122[/B][/SIZE]
*************************
Fixed, e744s, Sat Apr 13 06:33:35 2019, Mariluz Nikola Nicolas, RUN, General, CH2, Screenshots run120 v1 20x
FAG is 0 because screenshot was taken when run was stopped
Fixed, e744s, Sat Apr 13 10:23:01 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, ONLINE, General, CH2, Screenshots run 122 v3 20x
 
    Fixed, e744s, Sat Apr 13 10:32:59 2019, Iulian , ONLINE, General, CH2, Screenshots run 122 v3 
Is missing the scalers
Fixed, e744s, Sat Apr 13 11:44:21 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, General, CH2, tempory beam interruption 
ventilation problem SPIRAL& - beam stopped for presumably appro. 10 min (PCP info)

beam is back at 11:52 h
Fixed, e744s, Sat Apr 13 12:32:03 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, ONLINE, General, CH2, Scalers run122_scalers_v5.png
 
Fixed, e744s, Sat Apr 13 13:42:22 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, RUN, General, CH2, New run 122...1 generated after 4G on disk 
 
Fixed, e744s, Sat Apr 13 14:19:41 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, ONLINE, General, CH2, Scalers run122_scalers_v7.png
 
Fixed, e744s, Sat Apr 13 14:28:00 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, BEAM, General, CH2, PCP information - beam interruption 
beam interrupted to an octupole (?) failure - prevision to be back after 10-15 min (PCB info)

14:35 h beam is back

ELOG Home Page