MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 65 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Source Subjectdown Text Attachments
Fixede768s Tue Jul 16 21:30:19 2019 Chloe FougeresOTHERGeneralLiFPACE4 fusion-evaporationSimulated yields with beams 15N and 15O (4.7
MeV/u) on target LiF.
 fusion_evaporation_7Li.pngfusion_evaporation_19F.png 
Fixede744s Mon Apr 8 14:41:07 2019 Daniele MOTHERGeneralN/APACE4 cross check ------ E744s to-do list , proposal and other relevant documentsFusion-evaporation calculation cross-check:

angular range [10-40]deg
  
Fixedcom2019 Fri Apr 5 19:42:28 2019 Jenn Sanchez & Ana Montaner-PizáOTHERGeneralCD2PACE4 calculations
 Attached you can find the PACE4 calculations
for the reactions 16O + 12C and 16O + d at
 16O_12C.png16O_d.png 
Fixede768s Tue Jul 16 22:25:51 2019 mugastOTHERGeneral Oxygen 15 decay schemebeta+ decay to the ground state of 15N
gammas @ 511 keV
 15O_decay_scheme.png 
PendingTEST Tue Jan 21 17:55:12 2020 MarlèneMUST2Hardware Ovv error on the -5V of CAEN boardsThe Ovv error shows on the -5V (first one)
of the 3 board (5,3.3,10V for MUST2§squares)
It means that the voltage is over the asked
 BT_referenve_5V_cables_inv_a_comp_referenve_5V_partMUST2BT_referenve_5V_partMUST2_cables_inv_a_comp_referenve_5VBT_referenve_5V_partMUST2BT_referenve_5V 
Fixede768s Fri Jul 19 08:09:21 2019 Jenn, KseniiaOTHERGeneral Overview nightshift run 112Smooth night, everything was working properly.
Checked agata rootfile to see preliminary
gammas.
  
Fixedcom2019 Sun Apr 7 21:35:51 2019 Valerian, Freddy and AntoineRUNGeneralN/AOvernight run259 crashed during the nightRun 259 which was an overnight run crashed
(During the night between the 6 and the 7th
of April).
  
Fixede744s Mon Apr 15 15:18:55 2019 A. LemassonVAMOSHardware Optimization of IC ShapingDuring Run 129,
1) investigation of the trapezoidal filter
of IC
 IC_Shapingafter_run129.png 
Fixede744s Tue Apr 16 00:01:43 2019 louis, GuiseppeONLINEGeneralCH2Online snapshot from run 132Online snapshot from run 132  20x 
Fixedcom2019 Sat Apr 6 02:48:39 2019 Iulian RuxandraRUNSoftware Online Spectra run 256 @2h30 am 06/04 (for reference)The online spectra (for reference)
No timing on Mg3 & Mg4 side X. Those correspond
with the masked channels on the Muvi1
 11x 
Fixedcom2019 Sat Apr 6 08:18:55 2019 mugastRUNSoftwareCD2Online Scalers run 256 @8h00 am 06/04 for reference    Scalers060419-08am.pngMust2X060419-08am.pngMust2Y-060419_08am.pngMust2MugastXYMatrix060419_08am.pngMUGAST060419_08am.png 
Fixedcom2019 Sat Apr 6 02:52:51 2019 Iulian RuxandraRUNSoftware Online Scalers run 256 @2h30 am 06/04 for reference   Run_256_Scaler1.pngRun_256_Scaler2.pngRun_256_Scaler3.pngRun_256_Scaler4.png 
Fixede786s Wed Jun 12 17:59:01 2019 mugastOTHERSoftware Online Energy CalibrationUpdated Online Energy calibration for MUGAST,
based on run_0231 data
 x_E_cal.pngy_E_cal2.png 
Fixede786s Wed Jun 12 18:11:04 2019 mugastOTHERSoftware Online Energy Calibration    
Fixede793s Fri Mar 12 09:52:01 2021 mugast (Sarah, Louis)OFFLINEGeneralCD2Offline analysis run up to 56 8am1) A high energy gamma has been identified
at 3505 keV by gating on 3-5 MeV range in
excitation energy. This transition is unknown
 AngDisrtib.png3MeV_gamma.pngAWBA.png 
Fixede786s Wed Jun 26 05:58:23 2019 FreddyOFFLINEGeneralN/AOffline analysis run 56 and 58   run56-58_analysis.pngrun56-59_analysis_gammarays.pngrun56_analysis.pngrun58_analysis.png 
Fixede786s Tue Jun 25 02:46:32 2019 Sylvain, LouisOFFLINEGeneralCryo-3HeOffline analysis run 56Offline analysis of run 56 has been perfomed.
On plots, kinematics lines and excitation
energy are shown using gate on 47K in vamos.
 Kine_run56.pngTripleCoinc_run56.png 
Fixede793s Sat Mar 13 10:11:44 2021 AdrienOFFLINEGeneralCD2Offline analysis of run 51-61Run 51 to 61 are converted and analysed. 
I fixed the gamma/no gamma normalisation
after binning change.
 Plot51-61.pngAngle51-61.png 
Fixede793s Wed Mar 10 22:19:22 2021 Adrien, Freddy, Wilton and NigelOFFLINEGeneralCD2Offline analysis of run 51 and 52 using ganil filesWe noted that the gamma ray efficiency calculated
from file converted from AGATA was close
100%. We concluded that the conversion program
 RUN5152_ELabThethaLab.png 
Fixede786s Mon Jun 24 06:14:02 2019 LouisOFFLINEGeneralCryo-3HeOffline analysis 46Ar(3He,d)47K for run 49Energy loss vs. Time of Flight identification
has been performed in mugast. On can notice
some calibration trouble in energy and time.
 Kine.pngdEToFMG.png 

ELOG Home Page