MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 4 of 132  Not logged in MUGAST
Fixed, e768s, Wed Jul 17 01:51:10 2019, mugast, BEAM, General, , Faisceau perdu 
Un Q-pole dans L3 est tombé. L'opérateur a du mal à le redémarrer. Bertrand et un technicien ont essayé de réparer mais sans succès.
L'astreinte a été appelée à 2h50.
Fixed, e768s, Wed Jul 17 09:07:19 2019, mugast, BEAM, General, , beam settings 20190717_061639.jpg
values as it is now
Fixed, e768s, Wed Jul 17 09:50:44 2019, mugast, MUST2, General, N/A, MUST2 CAEN alim burned down 
Yesterday at around 23h the CAEN alim stopped working.
- The 48V power supply is blown up
- The Main controller is still starting
- We can see all card from the powered crate so hopefully no damage on the card themselves

Nicolas left a 6am this morning to pickup a spare at Orsay.
In the mean time we run 15N with VAMOS-AGATA daq.
Fixed, e768s, Thu Jul 18 14:38:04 2019, mugast, GRIT, General, N/A, time calibrator for MG10 X TAC_MUGAST_HF_StripByStrip_MG10_20190718.pngcalibT_StripByStrip_MG10_20190718.png
Here is the plot
Fixed, e768s, Thu Jul 18 23:35:26 2019, mugast, RUN, General, N/A, run 102 
VAMOS ref run:

Brho = 0.5854 Tm

P(CHIO) = 45 mbar
P(drift) = 6 mbar

hole = 7mm

I(15O) = 1.5e3 pps
Fixed, e768s, Thu Jul 18 23:42:44 2019, mugast, RUN, General, , run 103 -> Brho scan 
Fixed, e768s, Fri Jul 19 00:59:20 2019, mugast, RUN, General, , RUN 107 - Reference Target Run 
Reference Target Run after beam tuning
Brho 0.5854 Tm
Fixed, e768s, Fri Jul 19 01:02:54 2019, mugast, OTHER, General, , 15O beam parameters 
Brho manip = Brho after target - 2% = 0.556 Tm

RMN = 2821.476 Gauss

Q32 = 15.2 A
Q31 = 16.8 A
Q41 = 148.070 A
Q42 = 217.452 A

Dipole D4p = 187.632 A
Fixed, e768s, Fri Jul 19 01:05:26 2019, mugast, RUN, General, , RUN 108  
Brho Change to 0.556 Tm

Moving Plate : Final Position +7mm
with 6 kHz

Slowly increasing
Fixed, e768s, Fri Jul 19 09:32:45 2019, mugast, BEAM, General, LiF, Beam is fluctuating run_113_temporary_beam_loss.png
There was a temporary beam loss during the run 113
Fixed, e768s, Fri Jul 19 09:38:05 2019, mugast, GRIT, General, LiF, Impact matrix for MUGAST mugast_missing_strip.png
Fixed, e768s, Fri Jul 19 13:09:14 2019, mugast, BEAM, General, LiF, Counting rates as a function of beam intensity IMG_20190719_130411.jpg
checking counting rates as a function of increasing beam intensity
Fixed, e768s, Fri Jul 19 13:24:01 2019, mugast, OFFLINE, General, LiF, g-ray spectrum (run 112) requiring 19Ne in VAMOS 21.png
Fixed, e768s, Fri Jul 19 15:11:10 2019, mugast, OFFLINE, General, , Procedure for run conversion and analysis 
Here is the procedure to convert a run with VAMOS and AGATA data and add those data to the Kinematic plot.

Every 4GB there will be a file change, to see if there is a file change type:

ls -ltrh /data/mugastX/e768s/acquisition/run/

Convert the last 4GB file and add it to the chain through the following steps:

Open a terminal from one of the Mugast computer:
Type: source $HOME/GoToVamosAna
Type: MyVAna -d2Ar -f /data/mugastX/e768s/acquisition/run/run_$$$$-DD-MM-YY.HHhMMmSSs /data/mugastX/e768s/acquisition/run/RootA/r$$$$_000a.root

OR (in case the run is split in more files)

Type: MyVAna -d2Ar -f /data/mugastX/e768s/acquisition/run/run_$$$$-DD-MM-YY.HHhMMmSSs.N /data/mugastX/e768s/acquisition/run/RootA/r$$$$_00Na.root

(If you get the error "Could not find the BrhoRef for the run <RunNr> ", update the ./Calibs/ListBrho.dat file with relevant Brho for RunNr)

Now you would be already able to run npanalysis to analyze the data VAMOS+Mugast with the following procedure:

Type: exit (to exit the VAMOS environment)
Type: lpcgrit (to load the analysis environment)
Type: npp MUGAST
Edit the exe_e768s.sh to specify which runs to analyze. The command should be the following:

npanalysis -D mugast.detector -C Calibration.txt -E ./Reaction/15N7Lit.reaction -T /data/mugastX/e768s/acquisition/run/RootA/r$$$$_00Na.root AD -O run_$$$$_N.root

Type: ./exe_e768s.sh

To convert a run including the AGATA data, the procedure is the following:
Go to the AGATA analysis computer (last on the right close to the window in the acquisition room), open a terminal and type the following commands:

> a4
> t e768s
> cd Replay
>./do_global_replay.sh -run ## (## is the number of the run you want to convert).

When it is finished, copy the root file to the GANIL world:

> mkdir /dataganil/e768s/acquisition/root_agata/run_00##/
> cp ./run_00##/Out/Analysis/Tree_00*.root /dataganil/e768s/acquisition/root_agata/run_00##/.

Now you can analyze the file using npanalysis.
The command in the exe_e768s.sh file should now look like:

npanalysis -D mugast.detector -C Calibration.txt -E ./Reaction/15N7Lit.reaction -T /data/mugastX/e768s/acquisition/root_agata/run_00##/Tree_000N.root TreeMaster -O run_00##_N_agata.root

The run will be created in the ./NPOutputs folder.
Bon courage!
Fixed, e768s, Fri Jul 19 15:55:38 2019, mugast, RUN, General, , Beam is fluctuating 19x
Run 115 stopped at 16h40.
Fixed, e768s, Fri Jul 19 17:15:46 2019, mugast, RUN, General, LiF, Run 116 run116-Scaler2.png
Fixed, e768s, Fri Jul 19 18:57:12 2019, mugast, ONLINE, General, LiF, screenshots run 116 17x
Fixed, e768s, Fri Jul 19 22:16:43 2019, mugast, ONLINE, General, N/A, How to restart the vamos spectrum visualization (on the mugast daq computer) 
On the mugast DAQ computer:

* Open a terminal
* Type "GoToVamosAna"
* Type "vigru"
* In vigru: File, Open config -> vigru_ganp154.xml
* Then: Setup, Sources, Host/FileName: "ganp154", port:9090

If a spectrum is missing -> Add it with "display one histo"
Fixed, e768s, Sat Jul 20 17:03:23 2019, mugast, RUN, General, LiF, Run 117 stopped 
Run 117 stopped because VAMOS VXI went offline
Fixed, e768s, Sat Jul 20 17:06:12 2019, mugast, RUN, General, LiF, Run 118 Scaler scaler_run118_1.png
Start run 118

ELOG Home Page