MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 4 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Categorydown Target-Source Subject Text Attachments
Ongoinge775s Sat Feb 29 14:27:48 2020 mugast ; ValerianOFFLINESoftwareCD2Issues in the EX reconstruction[quote="mugast ; valerian irene"]We are currently
working on the EX reconstruction which is
off for detector 1, 3 and 7... One of our
 6x 
Ongoinge775s Sat Feb 29 15:53:12 2020 mugast ; ValerianOFFLINESoftwareCD2-AuIssues in the EX reconstruction[quote="mugast ; Valerian"][quote="mugast
; valerian irene"]We are currently working
on the EX reconstruction which is off for
  
Ongoinge775s Sat Feb 29 17:18:02 2020 mugast ; Valerian, Marlène , PierreOFFLINESoftwareCD2-AuIssues in the EX reconstruction[quote="mugast ; Valerian"][quote="mugast
; Valerian"][quote="mugast ; valerian irene"]We
are currently working on the EX reconstruction
 ExvsTheta_each_detectorsOK.pdfEx_GOOD.pdfEgvsEx_GOOD.pdf 
Fixede793s Fri Mar 5 16:16:28 2021 mugastDAQSoftware Pedestals for E793SPedestal alignment was performed for Energy
qnd Time for all cards with cooling at 0°.
 12x 
Pendinge793s Sat Mar 13 05:11:08 2021 Faïrouz, Juan LoisAGATASoftwareCD2Problem with AGATA acquisition started at 4h40
There is a problem with AGATA Acquisition.
All the bars in the global status & control
 run61-scalers_5h19.png 
Fixede793s Sat Mar 13 07:29:56 2021 Faïrouz, Juan LoisAGATASoftwareCD2AGATA acquisition problem fixed by Emmanuel    
FixedTEST Fri Dec 14 09:08:46 2018 Adrien MattaOTHERSocialN/ATest PostMUGAST ELOG is now ONLINE   
Fixede744s Wed Apr 10 06:45:53 2019 FrançoisBEAMSocial No beam yet They are about to align the beam from the
cyclotron CIME to the area G1.
  
Fixede744s Wed Apr 10 07:15:22 2019 FrançoisBEAMSocial no beam
They aligned the beam up to G1 Pr31 but the
stripper foil was not inserted, so they have
  
Fixede744s Wed Apr 10 09:05:33 2019 FrançoisBEAMSocial No beam in G1 yet.The beam is at the entrance of G1.   
Fixede744s Wed Apr 10 10:15:38 2019 FrançoisBEAMSocial Beam stoppedA problem with the cooling water.
2 UT at least to restart the accelerator
  
Fixede744s Wed Apr 10 11:46:04 2019 iulianBEAMSocialN/AE744 StatusRefrigeration problem, beam stopped.
Optimistic estimation: they need 1 UT to
setup CIME => 14N could be back around 20h.
  
Fixede744s Thu Apr 11 07:30:15 2019 mugastBEAMSocialN/ABeam stopThe beam will be back around 8:30.   
Fixede744s Sat Apr 13 08:02:42 2019 Marion, Kseniia, Dieter, Didier, GuiseppeONLINESocialCH2Screenshots run 122 v1   21x 
Fixede744s Sat Apr 13 11:42:16 2019 Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaHONLINESocialCH2Screenshots - spectra zeroed after previous screenshot takingspectra zeroed after previous screenshot taking  20x 
Fixede744s Sat Apr 13 12:04:56 2019 Adrien MattaOTHERSocialN/ABlow some steam this afternoon (staturday13th)If some of you want to blow some steam this
afternoon Crossfit Caen ( located in Mondeville,
you. Can find them on google map) is organising
  
Fixede744s Sat Apr 13 13:13:18 2019 Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaHONLINESocialCH2Screenshots run 122 v5   20x 
Fixede744s Sat Apr 13 15:31:32 2019 Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, CatalinONLINESocialCH2Screenshots run 122.1 v6"1_" added to screenshot filenames to indicate
automatic file opening
 20x 
Fixede744s Sun Apr 14 03:30:28 2019 Iulian IuliaOFFLINESocialCH2first calculation ECM ThetaCM for gamma-P emission   first_gammaP_rec.pdfAlias_iul.C 
Fixede744s Sun Apr 14 08:41:52 2019 Nikola Dieter Nicolas Beyhan KseniiaONLINESocialCH2Log & Scalers -- Run 122 at 08:40Spectra zeroed after screenshot taking  20x 

ELOG Home Page