Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e744s |
Thu Apr 11 01:16:30 2019 |
OttoRun | RUN | General | CH2 | Run63 |
*************************
Run : 63
*************************
Start at 2019-04-11 01:16:17.572487
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 100 um (Position 3)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Same as run 60 after DAQ NARVAL crash. (DC not sending Data, Kill Narval on ganp507 and vamosng)
AGAIN After Crash
|
Fixed | e744s |
Thu Apr 11 01:21:39 2019 |
OttoRun | RUN | General | CH2 | Run64 |
*************************
Run : 64
*************************
Start at 2019-04-11 01:21:02.741720
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 100 um (Position 3)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Data OK for Reference Target Thickness measurement
Same as run 60 after DAQ NARVAL crash. (DC not sending Data, Kill Narval on ganp507 and vamosng)
AGAIN After Crash CRASH in NUMEXO 63 - BI STORAGE error
(01:22:48 - 11/04/2019) FATAL - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : requested size too high available in actor 1024 requested in header 5376 do not use this actor
(01:22:48 - 11/04/2019) FATAL - log from NARVAL.NUMEXO2_61 - NUMEXO2_61 put sub system NARVAL in error with message :Bloc_Catcher.T_Communication : actor buffer size too small
(01:22:48 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : BlC : exception,STORAGE_ERROR,s-intman.adb:136 explicit raise
(01:22:48 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : BPR2 : exception,STORAGE_ERROR,s-intman.adb:136 explicit raise
(01:22:48 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : BPR ,STORAGE_ERROR,s-intman.adb:136 explicit raise
(01:22:48 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : exception ,STORAGE_ERROR,s-intman.adb:136 explicit raise
|
Fixed | e744s |
Thu Apr 11 01:37:57 2019 |
OttoRun | RUN | General | CH2 | Run65 |
*************************
Run : 65
*************************
Start at 2019-04-11 01:37:16.190996
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: C 73 um (Position 4)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Changed target to C 73 um |
Fixed | e744s |
Thu Apr 11 01:48:40 2019 |
OttoRun | RUN | General | Carbon | Run66 |
*************************
Run : 66
*************************
Start at 2019-04-11 01:48:23.997955
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: C 73 um (Position 4)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Changed target to C 73 um
Stop at 2019-04-11 01:58:13.528779
Stop comment: |
Fixed | e744s |
Thu Apr 11 02:09:12 2019 |
OttoRun | RUN | General | CH2 | Run67 |
*************************
Run : 67
*************************
Start at 2019-04-11 02:08:39.018915
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 73 um (Position 5)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.79067 Tm
- CATS 2 IN
Comment:
Changed target to CH2 73 um
Stop at 2019-04-11 02:13:21.475620
Stop comment: |
Fixed | e744s |
Thu Apr 11 02:12:42 2019 |
François | TARGET | General | | Measured target thicknesses |
CATS2
Incident beam 14N7+ Brho 0.79 Tm
Brho (6+) measured after CATS2 = 0.9148 Tm => energy = 7.38627 MeV/u
Measured = 3.97 µm mylar + 20 mm gas
N°2 CH2 104 µm
= 9.67 mg/cm2 (polyethylene density = 0.93 g/cm3) Georges@2018
Measured :
Brho(6+) = 0.7473 Tm => E=4.9355 MeV/u => e=109.7 µm
Brho(5+) = 0.8924 Tm => E=4.8874 MeV/u => e=111.5 µm
Measured e=110.6 µm
N°3 CH2 100 µm Goodfellow (polyethylene)
Measured Brho(6+)=0.7754 Tm => E=5.3126 MeV/u
Measured e= 95 µm
N°4 Carbon 75 µm
=> 6.75 < thick < 9.75 mg/cm2 (Graphite flexible, density 0,9-1,3 g/cm3) Goodfellow
measured Brho(6+)=0.811 Tm (very broad) => E=5.81006 MeV/u
Measured e=8.4 mg/cm2
N°5 CH2 73 µm Georges@2019
N°6 CH2 104 µm Georges@2019 |
Fixed | e744s |
Thu Apr 11 02:25:06 2019 |
iulian | RUN | General | CH2 | target thicknesses measurement Online |
Online measurement of the target thickness:
Run 58
Cats2 in -> Brho 14N7+=0.9148 Tm
Run 59
Cats2 in
CH2 target place 2 in
-> Brho 14N6+=0.7473 Tm
Thickness found 105.2 um
Run 60
Cats2 in
CH2 target place 3 in
-> Brho 14N6+=0.7754 Tm
-> Brho 14N5+=0.8924 Tm
Thickness found 91 um
Run 61
Cats2 in
C target place 4 in
-> Brho 14N6+=0.8118 Tm
Thickness foun 35.85
Run 62
Cats2 in
CH2 target place 5 in
-> Brho 14N6+=0.8023 Tm
Thickness found 76.2 um |
Fixed | e744s |
Thu Apr 11 02:33:36 2019 |
OttoRun | RUN | General | CH2 | Run68 |
*************************
Run : 68
*************************
Start at 2019-04-11 02:32:44.283818
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 105 um (Position 2)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.64050 Tm
- CATS 2 IN
Comment:
Changed target to CH2 105 um (position 2)
Stop at 2019-04-11 02:52:50.791709
Stop comment: |
Fixed | e744s |
Thu Apr 11 02:36:15 2019 |
Daniele, Andrea | VAMOS | General | N/A | VAMOS cfg |
VAMOS BRO= 0.64050 Phi= 45 Dtrans= 0.66m T-xFoc=7.995m
| Objects | Name | Settings | Actual
| VAMOS_FAIS_IN | VAMOS_BRO_IN | 0.640500 | 0.0
| | VAMOS_W_IN | 4.934969 | 3.258E+36
| | VAMOS_ION_A | 14.000 | 3.336E+36
| | VAMOS_ION_AM_IN | 14.003074 | 0.0
| | VAMOS_ION_Q | 7.00 | 0.0
| | VAMOS_ION_Z | 7.00 | 0.0
| G1_Q41 | G1.G.Q41 | 170.713 | 170.776
| | G1_Q41_G | -1.643 | -1.643
| G1_Q42 | G1.G.Q42 | 251.022 | 251.112
| | G1_Q42_G | 0.732 | 0.732
| G1_DVFW | G1.G.DVFW | 0.0 | 0.0
| G1_FW_HTP | G1.G.FW.HTP | 0.0 | 0.002
| G1_FW_HTN | G1.G.FW.HTN | 0.0 | 0.002
| G1_DVFW_HALL | G1.G.DVFW.HALL | 0.0 | 0.0
| G1_D41 | G1.G.D4.P | 215.598 | 216.160
| | G1.G.D41.RMN | 3249.630 | 3249.630
|
|
Fixed | e744s |
Thu Apr 11 02:53:20 2019 |
Marlène | RUN | General | | TAc VAMOS-CATS |
Just before RUN 68
TAC VAMOS-CATS is now in TAC CATS1-CATS2 in order to check if we see something in the online spectra.
TCATS total delay = 300 + 500 ns=800 ns
TODO : put back the right ADC channel |
Fixed | e744s |
Thu Apr 11 02:54:09 2019 |
mugast | RUN | General | | Changing Brho to 0.51 Tm starting run 70 |
|
Fixed | e744s |
Thu Apr 11 03:04:03 2019 |
OttoRun | RUN | General | CH2 | Run70 |
*************************
Run : 70
*************************
Start at 2019-04-11 02:57:22.675881
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 105 um (Position 2)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.51 Tm
- CATS 2 IN
Comment:
Changed Brho to 0.51 Tm to move the beam out of focal plane
Stop at 2019-04-11 03:05:06.845772
Stop comment: |
Fixed | e744s |
Thu Apr 11 03:09:14 2019 |
OttoRun | RUN | General | CH2 | Run71 |
*************************
Run : 71
*************************
Start at 2019-04-11 03:08:43.011636
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 105 um (Position 2)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.484 Tm
- CATS 2 IN
Comment:
Changed Brho to 0.484 to move the beam oit
Stop on DAQ Crash
(03:11:50 - 11/04/2019) FATAL - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : requested size too high available in actor 1024 requested in header 5376 do not use this actor
(03:11:50 - 11/04/2019) FATAL - log from NARVAL.NUMEXO2_61 - NUMEXO2_61 put sub system NARVAL in error with message :Bloc_Catcher.T_Communication : actor buffer size too small
(03:11:50 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : BlC : exception,STORAGE_ERROR,s-intman.adb:136 explicit raise
(03:11:50 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : BPR2 : exception,STORAGE_ERROR,s-intman.adb:136 explicit raise
(03:11:50 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : BPR ,STORAGE_ERROR,s-intman.adb:136 explicit raise
(03:11:50 - 11/04/2019) ERROR - log from NARVAL.NUMEXO2_61 - Bloc_Catcher.T_Communication : exception ,STORAGE_ERROR,s-intman.adb:136 explicit raise
Stop at 2019-04-11 03:20:00.545286
Stop comment: |
Fixed | e744s |
Thu Apr 11 03:21:14 2019 |
OttoRun | RUN | General | CH2 | Run72 |
*************************
Run : 72
*************************
Start at 2019-04-11 03:16:52.893246
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 105 um (Position 2)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.486 Tm
- CATS 2 IN
Comment:
DAQ Crash |
Fixed | e744s |
Thu Apr 11 03:40:44 2019 |
OttoRun | RUN | General | CH2 | Run73 |
*************************
Run : 73
*************************
Start at 2019-04-11 03:39:15.971913
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: CH2 105 um (Position 2)
- Beam: 14N
- Intensity: ~ 2e+4
- Brho = 0.437 Tm
- CATS 2 IN
Comment:
Stop at 2019-04-11 04:25:03.931527
Stop comment: |
Fixed | e744s |
Thu Apr 11 04:39:48 2019 |
OttoRun | RUN | General | CH2 | Run74 |
*************************
Run : 74
*************************
Start at 2019-04-11 04:37:42.487024
Run Conditions:
- Operator: AIulian Marlene Diego
- Trigger: Mugast & Vamos % 1000 & Cats2 % 40000
- Target/Source: CH2 105 um (Position 2)
- Beam: 14N
- Intensity: ~ 2e+5
- Brho = 0.437 Tm
- CATS 2 IN
First good data run. 2.7e+5 counts Cats2
Comment:
Stop at 2019-04-11 06:23:39.836186
Stop comment: good run |
Fixed | e744s |
Thu Apr 11 05:08:20 2019 |
Marlène Iulian | RUN | General | CD2 | Screenshots from RUN 74 |
RUN 74 with 14N beam and CD2 104um target
First screenshots from MUGAST
Time of flight is OK for MM and MG --> we keep CATS n FAG the way it is
CATS2 position is shifted in X by 3mm but it seems to be well centered on MUST2 and MUGAST
We see proton elastic scattering in MUST2 and in the square (by the way the square is working !)
I had to mask one mate Y on MG4 because it was counting about 50 Hz in the noise. |
Attachment 1: correlation_AGATA.png
|
|
Attachment 2: correlation_TAC.png
|
|
Attachment 3: DeltaE_E_MM.png
|
|
Attachment 4: DeltaE_Tof_MUGAST.png
|
|
Attachment 5: MUGAST_impact.png
|
|
Attachment 6: MUST2_impact.png
|
|
Attachment 7: cats2_pos.png
|
|
Attachment 8: TAC.png
|
|
Fixed | e744s |
Thu Apr 11 06:38:12 2019 |
Diego | VAMOS | Hardware | | TACS modification |
+300 ns of delay in the HF validated signal that gives the STOP of T_FPMW_HF && T_CATS2_HF.
Range of TAC FPMW_CATS2 increased to 1us. |
Fixed | e744s |
Thu Apr 11 06:41:14 2019 |
OttoRun | RUN | General | CH2 | Run75 |
========================================
*************************
Run : 75
*************************
Start at 2019-04-11 06:40:54.479084
Run Conditions:
- Operator: A. Lemasson
- Trigger: Mugast & Vamos % 1000 & Cats2 % 40000
- Target/Source: CH2 105 um (Position 2)
- Beam: 14N
- Intensity: ~ 2e+5
- Brho = 0.437 Tm
- CATS 2 IN
Comment:
Stop at 2019-04-11 07:29:11.245553
Stop comment: |
Fixed | e744s |
Thu Apr 11 06:48:23 2019 |
iulian | RUN | Hardware | CH2 | TO DO list |
mugast wrote: | - 2 TACS are not working:
- T_Si_CATS1 (stop should be CATS n FAG --> to be checked). Also Ok now. Same problem as below
- T_Si_VAMOS (seen now in T_CATS1_CATS2) --> check the signals (if CATS is the START we should use CATS n FAG, if it is the stop it should be delayed by 800 ns , the delay is prepared)
The was a broken Cable from the delay to fan in fan out.
Still remains T_Vamos_Cats1 with no counts. I suspect the necesity to put a 2 us delay on Cats1, or to inverse it and pout Cats1 fag validated as start
|
|
Attachment 1: run275_tacs_mugast.png
|
|