MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 42 of 132  Not logged in MUGAST
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede786s Thu Jun 27 03:33:26 2019 OttoRunRUNGeneralCryo-3HeRun63
*************************
Run : 63
*************************

Start at 2019-06-27 03:33:09.910218

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
Current ~ 30 kHz.
The cryo target pressure and temperature have slightly increased during the stop for the recover of AGATA, even before the refilling of the LHe tank.
It is probably due to a problem in the refilling of liquid nitrogen.

Stop at 2019-06-27 11:46:17.108352
Stop comment: stop
Fixede786s Thu Jun 27 12:28:58 2019 OttoRunRUNGeneralCryo-3HeRun67
*************************
Run : 67
*************************

Start at 2019-06-27 12:28:26.879061

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

Stop at 2019-06-27 12:46:41.949098
Stop comment:
Fixede786s Thu Jun 27 16:35:45 2019 OttoRunRUNGeneralCryo-3HeRun68
*************************
Run : 68
*************************

Start at 2019-06-27 16:35:24.351472

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Fixede786s Thu Jun 27 16:41:55 2019 OttoRunRUNGeneralCryo-3HeRun65
*************************
Run : 65
*************************

Start at 2019-06-27 11:35:21.078920

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

Stop at 2019-06-27 17:39:22.529443
Stop comment:
Fixede786s Thu Jun 27 17:43:15 2019 OttoRunRUNGeneralCryo-3HeRun69
*************************
Run : 69
*************************

Start at 2019-06-27 17:42:38.280555

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG


Test with only MUGAST back trigger

Stop at 2019-06-27 17:54:02.829540
Stop comment:
Fixede786s Thu Jun 27 17:59:20 2019 OttoRunRUNGeneralCryo-3HeRun70
*************************
Run : 70
*************************

Start at 2019-06-27 17:58:29.855367

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

back to normal

Stop at 2019-06-27 18:37:51.816766
Stop comment: type your message here
Fixede786s Thu Jun 27 18:48:51 2019 OttoRunRUNGeneralCryo-3HeRun71
*************************
Run : 71
*************************

Start at 2019-06-27 18:47:56.171341

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- MG
- square (not biased)
- M2


all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

Stop at 2019-06-27 20:23:56.630240
Stop comment:
Fixede786s Thu Jun 27 20:26:27 2019 OttoRunRUNGeneralCryo-3HeRun73
*************************
Run : 73
*************************

Start at 2019-06-27 20:26:17.916314

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

There is no run 72

Stop at 2019-06-27 23:04:45.884452
Stop comment: AGATA DAQ is rejectting all events
Fixede786s Thu Jun 27 23:28:30 2019 OttoRunRUNGeneralCryo-3HeRun74
*************************
Run : 74
*************************

Start at 2019-06-27 23:25:00.455575

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

Stop at 2019-06-28 09:31:40.775271
Stop comment:
Fixede786s Fri Jun 28 10:00:25 2019 OttoRunRUNGeneralCryo-3HeRun75
*************************
Run : 75
*************************

Start at 2019-06-28 09:59:59.505010

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

CATS threshold raised

Stop at 2019-06-28 14:33:09.843668
Stop comment:
Fixede786s Fri Jun 28 15:25:12 2019 OttoRunRUNGeneralCryo-3HeRun76
*************************
Run : 76
*************************

Start at 2019-06-28 15:24:51.867946

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

beam back. Q pole issues still

Stop at 2019-06-28 16:55:27.258794
Stop comment:
Fixede786s Fri Jun 28 18:34:35 2019 OttoRunRUNGeneralCryo-3HeRun77
========================================
*************************
Run : 77
*************************

Start at 2019-06-28 18:34:22.873862

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

beam back. Q pole issues still

Stop at 2019-06-29 06:14:31.307098
Stop comment:
Fixede786s Sat Jun 29 01:53:24 2019 OttoRunRUNGeneralCryo-3HeRun77

OttoRun wrote:
*************************
Run : 77
*************************

Start at 2019-06-28 18:34:22.873862

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

beam back. Q pole issues still

Beam is back, again, at 1.53, weird behavior of CATS
Attachment 1: 77CATS.png
77CATS.png
Fixede786s Sat Jun 29 05:41:12 2019 OttoRunRUNGeneralCryo-3HeRun77

OttoRun wrote:

OttoRun wrote:
*************************
Run : 77
*************************

Start at 2019-06-28 18:34:22.873862

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

beam back. Q pole issues still

Beam is back, again, at 1.53, weird behavior of CATS
Attachment 1: 78MM.png
78MM.png
Attachment 2: 80mmetof.png
80mmetof.png
Attachment 3: 79mg.png
79mg.png
Attachment 4: 81mmede.png
81mmede.png
Attachment 5: 82mgetof.png
82mgetof.png
Attachment 6: tac.png
tac.png
Attachment 7: corr.png
corr.png
Attachment 8: cats.png
cats.png
Fixede786s Sat Jun 29 05:56:40 2019 OttoRunRUNGeneralCryo-3HeRun77

OttoRun wrote:

OttoRun wrote:

OttoRun wrote:
*************************
Run : 77
*************************

Start at 2019-06-28 18:34:22.873862

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

beam back. Q pole issues still

Beam is back, again, at 1.53, weird behavior of CATS


After beam is back we found 350Hz on vamos focal plane, with 20kHz current. After Brho scanning we found a Brho distribution going from 1Tm to 0.4Tm. Observation of gamma rays indicates no accumulation of radioactivity in the chamber with respect to previous runs. We conclude that we may have ice layers up to 500um in the target but very in-homogeneous since we also observe 1Tm Brho. To verify maybe increase target pressure to modify the structure of the ice. CATS is tripping continuously. No VACUUM changes observed.
Fixede786s Sat Jun 29 06:18:06 2019 OttoRunRUNGeneralCryo-3HeRun78
*************************
Run : 78
*************************

Start at 2019-06-29 06:17:46.891353

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

beam back. Q pole issues still

Stop at 2019-06-29 08:57:15.767428
Stop comment:

HV of Drift Chamber in VAMOS reduced from 670V to 660V in order to avoid saturation, this will keep like that in the following.
Fixede786s Sat Jun 29 09:32:52 2019 OttoRunRUNGeneralCryo-3HeRun79
*************************
Run : 79
*************************

Start at 2019-06-29 09:31:41.957308

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 800 mbar
We are filling the target to reach 1000 mbar

Stop at 2019-06-29 12:04:05.587989
Stop comment:
Fixede786s Sat Jun 29 12:07:56 2019 OttoRunRUNGeneralCryo-3HeRun80
*************************
Run : 80
*************************

Start at 2019-06-29 12:07:36.615014

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 820 mbar
We are filling the target to reach 1000 mbar


test cats1

Stop at 2019-06-29 13:03:26.602226
Stop comment: radioactive beam recovered
Fixede786s Sat Jun 29 13:08:17 2019 OttoRunRUNGeneralCryo-3HeRun81
*************************
Run : 81
*************************

Start at 2019-06-29 13:08:04.442155

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 820 mbar
We are filling the target to reach 1000 mbar


test cats1

Stop at 2019-06-29 19:22:32.016536
Stop comment:
Fixede786s Sat Jun 29 20:31:21 2019 OttoRunRUNGeneralCryo-3HeRun84
*************************
Run : 84
*************************

Start at 2019-06-29 20:30:36.534403

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG
- M2
- VAMOS%1000
- CATS%1000

all X on MUVI disabled from trigger
all threshold of MUVI1 at 1 MeV to avoid as much as possible noise

LN filling problem solved !!!
pressure of the target slowly increasing about 820 mbar
We are filling the target to reach 1000 mbar


test cats1

time calibration run

ELOG Home Page