Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e786s |
Sun Jun 23 20:58:04 2019 |
OttoRun | RUN | General | Cryo-empty | Run41 |
*************************
Run : 41
*************************
Start at 2019-06-23 20:57:51.947211
VAMOS tunning Continued with 2.5 10*4
After Fixing the IC preamp issue
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Test Coupling With AGATA
TRIGGER
VAMOS %100 |
Fixed | e786s |
Sun Jun 23 21:15:20 2019 |
OttoRun | RUN | General | Cryo-empty | Run42 |
*************************
Run : 42
*************************
Start at 2019-06-23 21:15:14.348251
VAMOS tunning Continued with 2.5 10*4
After Fixing the IC preamp issue
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Test Coupling With AGATA
TRIGGER
VAMOS %100 |
Fixed | e786s |
Sun Jun 23 21:21:09 2019 |
OttoRun | RUN | General | Cryo-empty | Run45 |
*************************
Run : 45
*************************
Start at 2019-06-23 21:21:04.748199
VAMOS tunning Continued with 2.5 10*4
After Fixing the IC preamp issue
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Test Coupling With AGATA
TRIGGER
VAMOS %100
Stop at 2019-06-23 21:39:52.572827
Stop comment: |
Fixed | e786s |
Sun Jun 23 21:43:45 2019 |
OttoRun | RUN | General | Cryo-3He | Run46 |
*************************
Run : 46
*************************
Start at 2019-06-23 21:42:22.018646
Target Making (260mb at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA with loosy LTS
TRIGGER :
- VAMOS %100
- MM
- MG
Stop at 2019-06-23 22:33:28.947041
Stop comment: |
Fixed | e786s |
Sun Jun 23 22:54:08 2019 |
OttoRun | RUN | General | Cryo-3He | Run47 |
*************************
Run : 47
*************************
Start at 2019-06-23 22:53:38.158434
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %100
- MM
- MG
Stop at 2019-06-23 22:57:59.635528
Stop comment:
Stop at 2019-06-23 23:33:23.021160
Stop comment: type your message here |
Fixed | e786s |
Mon Jun 24 09:45:59 2019 |
OttoRun | RUN | General | Cryo-3He | Run48 |
*************************
Run : 48
*************************
Start at 2019-06-23 23:31:16.366471
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %100
- MM
- MG |
Fixed | e786s |
Mon Jun 24 09:55:06 2019 |
OttoRun | RUN | General | Cryo-3He | Run50 |
*************************
Run : 50
*************************
Start at 2019-06-24 09:47:38.321557
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %100
- MM
- MG
Stop at 2019-06-24 12:25:33.653748
Stop comment: type your message here |
Fixed | e786s |
Mon Jun 24 13:06:50 2019 |
OttoRun | RUN | General | Cryo-3He | Run52 |
*************************
Run : 52
*************************
Start at 2019-06-24 13:05:57.789780
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
******TEST OF TARGET THICKNESS*****
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %30
- MM
- MG
Stop at 2019-06-24 15:37:24.149482
Stop comment: stopped to move AGATA in a more compact position and for CATS |
Fixed | e786s |
Mon Jun 24 15:53:27 2019 |
OttoRun | RUN | General | Cryo-3He | Run53 |
*************************
Run : 53
*************************
Start at 2019-06-24 15:51:16.513185
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
******TEST OF TARGET THICKNESS*****
AGATA position +51 mm
TRIGGER :
- VAMOS %30
- MM
- MG
Stop at 2019-06-24 16:25:14.176085
Stop comment: |
Fixed | e786s |
Mon Jun 24 16:30:19 2019 |
OttoRun | RUN | General | Cryo-3He | Run55 |
*************************
Run : 55
*************************
Start at 2019-06-24 16:29:04.386013
CATS1 is inserted
target 700mb
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
******TEST OF TARGET THICKNESS*****
AGATA position +51 mm
TRIGGER :
- VAMOS %1000
- CATS1
- CATS2 %1000
Stop at 2019-06-24 17:38:27.010229
Stop comment:
* CATS1Y is not working --> We can't draw the CATS1 profile
* However we see scattering from CATS1 towards CATS2 in the shadowed region.
--> This means that the "thing" is most probably before CATS1 |
Attachment 1: Vamos13N_and_MUST3protons.png
|
|
Attachment 2: CATS1and2_raw_run55.png
|
|
Fixed | e786s |
Mon Jun 24 17:42:33 2019 |
OttoRun | RUN | General | Cryo-3He | Run56 |
*************************
Run : 56
*************************
Start at 2019-06-24 17:41:25.679819
CATS1 removed
target 700mb
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Stop at 2019-06-25 02:55:05.207493
Stop comment: 48Ca source sample is empty. Need to be changed : probable change of beam tuning |
Fixed | e786s |
Tue Jun 25 10:51:59 2019 |
OttoRun | RUN | General | 152Eu | Run57 |
*************************
Run : 57
*************************
Start at 2019-06-25 10:50:03.672363
152Eu source @ AGATA
Stop at 2019-06-25 14:36:40.442175
Stop comment: end ; source removed |
Fixed | e786s |
Tue Jun 25 16:58:53 2019 |
OttoRun | RUN | General | Cryo-3He | Run58 |
========================================
*************************
Run : 58
*************************
Start at 2019-06-25 16:56:44.425517
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Beam is back
scaler_run_58.png taken at the beginning of the run.
Stop at 2019-06-26 05:02:52.980409
Stop comment: |
Fixed | e786s |
Tue Jun 25 18:14:38 2019 |
OttoRun | RUN | General | Cryo-3He | Run58 |
OttoRun wrote: | *************************
Run : 58
*************************
Start at 2019-06-25 16:56:44.425517
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Beam is back
scaler_run_58.png taken at the beginning of the run. |
In the CATS position spectra the central part is missing.
It is possible that the gain is two high for the actual high intensity of the beam. |
Attachment 1: cats_run_58.png
|
|
Fixed | e786s |
Wed Jun 26 05:33:50 2019 |
OttoRun | RUN | General | Cryo-3He | Run59 |
*************************
Run : 59
*************************
Start at 2019-06-26 05:32:53.325868
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
5 to 5h30 - Restarted GTS Tree by Emmanuel
6h00 - Validation broken again
Stop at 2019-06-26 09:44:56.521500
Stop comment: Stopping to Realign GTS Tree |
Fixed | e786s |
Wed Jun 26 10:29:30 2019 |
OttoRun | RUN | General | Cryo-3He | Run60 |
========================================
*************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel
Stop at 2019-06-26 17:59:14.820418
Stop comment: change of Brho |
Fixed | e786s |
Wed Jun 26 14:40:58 2019 |
OttoRun | RUN | General | Cryo-3He | Run60 |
OttoRun wrote: | *************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel |
|
Attachment 1: run60.png
|
|
Attachment 2: run60_1.png
|
|
Attachment 3: run60_2.png
|
|
Attachment 4: run60_3.png
|
|
Attachment 5: run60_4.png
|
|
Attachment 6: run60_5.png
|
|
Fixed | e786s |
Wed Jun 26 15:48:50 2019 |
OttoRun | RUN | General | Cryo-3He | Run60 |
OttoRun wrote: |
OttoRun wrote: | *************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel |
|
No beeam from 15.00. According to PCP, there will be no beam for a while |
Attachment 1: run60_6.png
|
|
Fixed | e786s |
Wed Jun 26 15:50:36 2019 |
OttoRun | RUN | General | Cryo-3He | Run60 |
OttoRun wrote: |
OttoRun wrote: | *************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel |
|
No Beam since 15:00. According to PCP there will be no beam for a while. |
Attachment 1: run60_6.png
|
|
Fixed | e786s |
Wed Jun 26 18:12:18 2019 |
OttoRun | RUN | General | Cryo-3He | Run62 |
*************************
Run : 62
*************************
Start at 2019-06-26 18:09:42.882502
target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF
Stop at 2019-06-27 02:19:17.492600
Stop comment: Problems with AGATA, run stopped |