Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | TEST |
Mon Mar 9 16:48:25 2020 |
OttoRun | RUN | General | 3-alpha | Run524 |
*************************
Run : 524
*************************
Start at 2020-03-09 16:33:27.725289
MUGAST run after recovery of overheating problem.
Mugast is cooled down with the MUST2 cooling system. MUST2 is therefore not biased.
In attachment the raw spectra and the cal spectra using the calibration done before the e775s experiment. Some pedestals seem to have moved.
The energy resolution per strip on X and Y is around 40 keV (I took MG1 in this case).
Stop at 2020-03-09 18:36:44.467422
Stop comment:
Stop at 2020-03-10 16:27:00.079221
Stop comment:
Stop at 2020-03-11 11:00:13.272842
Stop comment: |
Fixed | TEST |
Tue Feb 18 17:50:34 2020 |
OttoRun | RUN | General | N/A | Run522 |
*************************
Run : 522
*************************
Start at 2020-02-18 17:50:26.904193
Run 518
test TAC label
Stop at 2020-02-18 18:16:50.195534
Stop comment: type your message here
Stop at 2020-02-18 19:06:40.177058
Stop comment: type your message here |
Fixed | TEST |
Mon Feb 17 19:32:25 2020 |
OttoRun | RUN | General | N/A | Run521 |
*************************
Run : 521
*************************
Start at 2020-02-17 19:32:23.518565
Run 518
test TAC label
Stop at 2020-02-17 19:33:31.745902
Stop comment:
Stop at 2020-02-18 15:59:48.350187
Stop comment: type your message here
Stop at 2020-02-18 16:47:41.671706
Stop comment: type your message here
Stop at 2020-02-18 16:48:38.426988
Stop comment: type your message here
Stop at 2020-02-18 16:48:41.866299
Stop comment: type your message here
Stop at 2020-02-18 16:48:44.381600
Stop comment: type your message here
Stop at 2020-02-18 16:48:46.818607
Stop comment: type your message here
Stop at 2020-02-18 16:48:49.113475
Stop comment: type your message here
Stop at 2020-02-18 16:48:51.867688
Stop comment: type your message here
Stop at 2020-02-18 16:49:07.187157
Stop comment: type your message here |
Fixed | TEST |
Mon Feb 17 19:26:41 2020 |
OttoRun | RUN | General | N/A | Run520 |
*************************
Run : 520
*************************
Start at 2020-02-17 19:26:38.864292
Run 518
test TAC label
Stop at 2020-02-17 19:27:30.284789
Stop comment: |
Fixed | e744s |
Wed Apr 10 21:31:31 2019 |
OttoRun | RUN | General | N/A | Run52 |
*************************
Run : 52
*************************
Start at 2019-04-10 21:31:26.692634
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: Hole 7mm
- Beam: 14N
- Intensity: ~ 1e3
- Brho = 0.79067 Tm
Comment:
First Run 14N
Stop at 2019-04-10 22:14:35.626012
Stop comment:
Optimisation beam position
|
Attachment 1: 20190410_215213.jpg
|
|
Attachment 2: 20190410_215735.jpg
|
|
Fixed | e786s |
Mon Jun 24 13:06:50 2019 |
OttoRun | RUN | General | Cryo-3He | Run52 |
*************************
Run : 52
*************************
Start at 2019-06-24 13:05:57.789780
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
******TEST OF TARGET THICKNESS*****
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %30
- MM
- MG
Stop at 2019-06-24 15:37:24.149482
Stop comment: stopped to move AGATA in a more compact position and for CATS |
Fixed | e768s |
Tue Jul 16 16:55:08 2019 |
OttoRun | RUN | General | Empty | Run52 |
*************************
Run : 52
*************************
Start at 2019-07-16 16:54:53.412722
15N beam tuning
Stop at 2019-07-16 17:30:40.960831
Stop comment: |
Fixed | e793s |
Wed Mar 10 20:53:55 2021 |
OttoRun | RUN | General | CD2 | Run52 |
*************************
Run : 52
*************************
Start at 2021-03-10 18:16:20.382279
Beam in the room; restarting daq after changing trigger.
target: CD2 0.5mg
Trigger are MUGAST/MM
changed width of the FAG to 400ns
Removed extra 100ns delay from cats validation |
Fixed | TEST |
Mon Feb 17 19:20:44 2020 |
OttoRun | RUN | General | N/A | Run519 |
*************************
Run : 519
*************************
Start at 2020-02-17 19:20:41.630657
Run 518
test TAC label
Stop at 2020-02-17 19:21:30.639797
Stop comment: |
Fixed | TEST |
Mon Feb 17 18:40:25 2020 |
OttoRun | RUN | General | N/A | Run518 |
*************************
Run : 518
*************************
Start at 2020-02-17 18:40:01.589789
Run 518
test TAC label
Stop at 2020-02-17 18:41:28.411885
Stop comment: |
Fixed | e744s |
Wed Apr 10 21:16:20 2019 |
OttoRun | RUN | General | N/A | Run51 |
*************************
Run : 51
*************************
Start at 2019-04-10 21:16:08.923139
Run Conditions:
- Operator: A. Lemasson
- Trigger: VAMOS
- Target/Source: Hole 7mm
- Beam: 14N
- Intensity: ~ 1e3
- Brho = 0.79067 Tm
Comment:
First Run 14N
|
Fixed | e768s |
Tue Jul 16 16:26:06 2019 |
OttoRun | RUN | General | N/A | Run51 |
*************************
Run : 51
*************************
Start at 2019-07-16 16:26:01.496151
15N beam tuning
Stop at 2019-07-16 16:42:21.024297
Stop comment: |
Fixed | e793s |
Wed Mar 10 17:25:22 2021 |
OttoRun | RUN | General | CD2 | Run51 |
*************************
Run : 51
*************************
Start at 2021-03-10 17:24:45.316220
Beam in the room; restarting daq after changing trigger.
target: CD2 0.5mg
Trigger are MUGAST/MM
changed width of the FAG to 400ns
Removed extra 100ns delay from cats validation
Stop at 2021-03-10 18:14:26.996869
Stop comment: stop for VAMOS data analysis. Coherence check
Stop at 2021-03-10 20:46:36.348405
Stop comment: stopped the run to add cats% in the trigger |
Fixed | e744s |
Wed Apr 10 20:13:07 2019 |
OttoRun | RUN | General | N/A | Run50 |
*************************
Run : 50
*************************
Start at 2019-04-10 20:11:52.495577
Run Conditions:
- Operator: A. Lemasson Iulian
- Trigger: VAMOS
- Target/Source: Hole 7mm
- Beam: 14N
- Intensity: 1e3
- Brho = 0.79067 Tm
Comment:
First Run 14N
|
Attachment 1: 20190410_201051.jpg
|
|
Attachment 2: 20190410_200749.jpg
|
|
Fixed | e786s |
Mon Jun 24 09:55:06 2019 |
OttoRun | RUN | General | Cryo-3He | Run50 |
*************************
Run : 50
*************************
Start at 2019-06-24 09:47:38.321557
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %100
- MM
- MG
Stop at 2019-06-24 12:25:33.653748
Stop comment: type your message here |
Fixed | e768s |
Tue Jul 16 16:16:53 2019 |
OttoRun | RUN | General | N/A | Run50 |
*************************
Run : 50
*************************
Start at 2019-07-16 16:15:41.240658
15N beam tuning
Stop at 2019-07-16 16:25:36.294652
Stop comment: |
Fixed | e793s |
Wed Mar 10 17:00:06 2021 |
OttoRun | RUN | General | CD2 | Run50 |
*************************
Run : 50
*************************
Start at 2021-03-10 16:59:44.368649
Beam in the room; restarting daq after changing trigger.
target: CD2 0.5mg
Trigger are MUGAST/MM
changing width of the FAG to 1us
Stop at 2021-03-10 17:12:21.612357
Stop comment: stopping to get in and change the cats delay |
Fixed | e786s |
Sun Jun 23 23:36:18 2019 |
OttoRun (Louis edit) | RUN | General | Cryo-3He | Run49 |
*************************
Run : 49
*************************
Start at 2019-06-23 23:36:11.373234
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %100
- MM
- MG
Beam stopped at 5h27 for neutron excess in a restricted area after CIME. until...
Stop at 2019-06-24 09:25:27.526617
Stop comment: waiting for the beam |
Fixed | e793s |
Wed Mar 10 16:31:50 2021 |
OttoRun | RUN | General | CD2 | Run49 |
*************************
Run : 49
*************************
Start at 2021-03-10 16:31:31.923710
Beam in the room; restarting daq after changing trigger.
target: CD2 0.5mg
Trigger are MUGAST/MM
Stop at 2021-03-10 16:53:12.237279
Stop comment: stopping to change GMT windows |
Fixed | e786s |
Mon Jun 24 09:45:59 2019 |
OttoRun | RUN | General | Cryo-3He | Run48 |
*************************
Run : 48
*************************
Start at 2019-06-23 23:31:16.366471
Target Making (xxxx at start) with 2.5 10*4
Brho0=1.05 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
Coupled with AGATA after attempt to fix AGAVA TS
TRIGGER :
- VAMOS %100
- MM
- MG |