MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 37 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Source Subjectdown
Fixede793s Fri Mar 12 16:58:43 2021 OttoRunRUNGeneralCD2Run61
*************************
Run : 61
*************************

Start at 2021-03-12 16:57:56.722818

Test run. ACQ DT


starting again after centering the beam on the target

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-13 07:09:09.949615
Stop comment: run 61 stopped to fix AGATA acquisition problem
Fixede744s Thu Apr 11 01:00:46 2019 OttoRunRUNGeneralCH2Run60
*************************
Run : 60
*************************

Start at 2019-04-11 00:59:35.983897

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 100 um (Position 3)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam
Vamos IC10 placed in IC12 electronics
Fixede786s Wed Jun 26 10:29:30 2019 OttoRunRUNGeneralCryo-3HeRun60
========================================
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel

Stop at 2019-06-26 17:59:14.820418
Stop comment: change of Brho
Fixede786s Wed Jun 26 14:40:58 2019 OttoRunRUNGeneralCryo-3HeRun60

OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel
Attachment 1: run60.png
run60.png
Attachment 2: run60_1.png
run60_1.png
Attachment 3: run60_2.png
run60_2.png
Attachment 4: run60_3.png
run60_3.png
Attachment 5: run60_4.png
run60_4.png
Attachment 6: run60_5.png
run60_5.png
Fixede786s Wed Jun 26 15:48:50 2019 OttoRunRUNGeneralCryo-3HeRun60

OttoRun wrote:

OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel


No beeam from 15.00. According to PCP, there will be no beam for a while
Attachment 1: run60_6.png
run60_6.png
Fixede786s Wed Jun 26 15:50:36 2019 OttoRunRUNGeneralCryo-3HeRun60

OttoRun wrote:

OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel


No Beam since 15:00. According to PCP there will be no beam for a while.
Attachment 1: run60_6.png
run60_6.png
Fixede768s Tue Jul 16 20:43:05 2019 OttoRunRUNGeneralLiFRun60
*************************
Run : 60
*************************

Start at 2019-07-16 20:42:55.802674

15N beam tuning

50 kHz on profiler fluctuating


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +7 mm

Stop at 2019-07-17 01:55:00.437286
Stop comment: Test run (many modifications during this run)
Attachment 1: E_TOF_run0060.png
E_TOF_run0060.png
Attachment 2: E_Theta_run0060.png
E_Theta_run0060.png
Fixede768s Wed Jul 17 08:44:41 2019 OttoRunRUNGeneralLiFRun60



OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-07-16 20:42:55.802674

15N beam tuning

50 kHz on profiler fluctuating


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +7 mm

Stop at 2019-07-17 01:55:00.437286
Stop comment: Test run (many modifications during this run)
Fixede793s Fri Mar 12 15:19:35 2021 OttoRunRUNGeneralCD2Run60
*************************
Run : 60
*************************

Start at 2021-03-12 15:19:14.732769

Test run. ACQ DT

ATC6 pos 0 is back
14C is removed
starting again after beam line reparation of power supply

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-12 16:53:37.438208
Stop comment: stop run after tuning of the beam
Fixede768s Mon Jul 15 19:56:52 2019 OttoRunRUNGeneral3-alphaRun6
*************************
Run : 6
*************************

Start at 2019-07-15 17:39:19.237140

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals (new pedestal for all trap detectors)

Square detectors:
+ MG10: not biased
+ MG9 removed
Fixede744s Thu Apr 11 00:28:44 2019 OttoRunRUNGeneralCH2Run59
*************************
Run : 59
*************************

Start at 2019-04-11 00:27:28.387554

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 100 um (Position 2)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam


Stop at 2019-04-11 00:49:00.966603
Stop comment:
Attachment 1: run59_Brho_Cats2_15N6_targetch2.png
run59_Brho_Cats2_15N6_targetch2.png
Fixede786s Wed Jun 26 05:33:50 2019 OttoRunRUNGeneralCryo-3HeRun59
*************************
Run : 59
*************************

Start at 2019-06-26 05:32:53.325868

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

5 to 5h30 - Restarted GTS Tree by Emmanuel
6h00 - Validation broken again

Stop at 2019-06-26 09:44:56.521500
Stop comment: Stopping to Realign GTS Tree
Fixede768s Tue Jul 16 20:37:10 2019 OttoRunRUNGeneralLiFRun59
*************************
Run : 59
*************************

Start at 2019-07-16 20:35:43.781384

15N beam tuning

50 kHz on profiler fluctuating


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +22

Stop at 2019-07-16 20:42:51.944331
Stop comment: wrong mask position
Fixede793s Fri Mar 12 13:40:59 2021 OttoRunRUNGeneralCD2Run59
*************************
Run : 59
*************************

Start at 2021-03-12 13:40:31.431982

Test run. ACQ DT

(ATC6 crystal stopped)
starting again after beam line reparation of power supply

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-12 13:42:17.319503
Stop comment: stopping daq because agata daq did not start
Fixede744s Thu Apr 11 00:03:37 2019 OttoRunRUNGeneralN/ARun58
========================================
*************************
Run : 58
*************************

Start at 2019-04-11 00:03:18.437004

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: No Target
  • Beam: 14N
  • Intensity: ~ 1e3
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Reference Run Without target and IC OK PPAC voltages were too low in MW08
C6 E5-H0 -1.5
C6 E3-VE 0.5
After Setting IC Threshold
Placing Finger on The beam


Stop at 2019-04-11 00:16:46.322754
Stop comment:
run58_Brho_Cats2_14N.png -> Brho no target Cats2
Attachment 1: run58_Brho_Cats2_14N.png
run58_Brho_Cats2_14N.png
Fixede744s Thu Apr 11 00:06:50 2019 A. LemassonRUNGeneralN/ARun58
Without Finger 21 kHz -> Reduced to 800 Hz with finger
Attachment 1: XfTFFinger.png
XfTFFinger.png
Attachment 2: run58_Brho_Cats2_14N.png
run58_Brho_Cats2_14N.png
Fixede786s Tue Jun 25 16:58:53 2019 OttoRunRUNGeneralCryo-3HeRun58
========================================
*************************
Run : 58
*************************

Start at 2019-06-25 16:56:44.425517

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Beam is back
scaler_run_58.png taken at the beginning of the run.

Stop at 2019-06-26 05:02:52.980409
Stop comment:
Fixede786s Tue Jun 25 18:14:38 2019 OttoRunRUNGeneralCryo-3HeRun58

OttoRun wrote:
*************************
Run : 58
*************************

Start at 2019-06-25 16:56:44.425517

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Beam is back
scaler_run_58.png taken at the beginning of the run.


In the CATS position spectra the central part is missing.
It is possible that the gain is two high for the actual high intensity of the beam.
Attachment 1: cats_run_58.png
cats_run_58.png
Fixede786s Tue Jun 25 22:20:36 2019 FrancoRUNGeneralCryo-3HeRun58

OttoRun wrote:

OttoRun wrote:
*************************
Run : 58
*************************

Start at 2019-06-25 16:56:44.425517

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Beam is back
scaler_run_58.png taken at the beginning of the run.


In the CATS position spectra the central part is missing (maybe for the high intensity of the beam?).
We can anyway recover the time information.

After the decrease of the high voltage of VAMOS drift chamber to avoid saturation of the signals
the BRho resolution has worsened of about 25% (see attachment). We will now increase it again (h. 22.30).
Attachment 1: BRho_run58.png
BRho_run58.png
Fixede786s Tue Jun 25 23:55:34 2019 FrancoRUNGeneralCryo-3HeRun58

Franco wrote:

OttoRun wrote:

OttoRun wrote:
*************************
Run : 58
*************************

Start at 2019-06-25 16:56:44.425517

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Beam is back
scaler_run_58.png taken at the beginning of the run.

scaler_run_58.png is taken after 7h.


In the CATS position spectra the central part is missing (maybe for the high intensity of the beam?).
We can anyway recover the time information.

After the decrease of the high voltage of VAMOS drift chamber to avoid saturation of the signals
the BRho resolution has worsened of about 25% (see attachment). We will now increase it again (h. 22.30).
Attachment 1: scaler_run_58_2.png
scaler_run_58_2.png

ELOG Home Page