MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 37 of 132  Not logged in MUGAST
Fixed, e793s, Fri Mar 12 16:58:43 2021, OttoRun, RUN, General, CD2, Run61 
*************************
Run : 61
*************************

Start at 2021-03-12 16:57:56.722818

Test run. ACQ DT


starting again after centering the beam on the target

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-13 07:09:09.949615
Stop comment: run 61 stopped to fix AGATA acquisition problem
Fixed, e744s, Thu Apr 11 01:00:46 2019, OttoRun, RUN, General, CH2, Run60 
*************************
Run : 60
*************************

Start at 2019-04-11 00:59:35.983897

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 100 um (Position 3)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam
Vamos IC10 placed in IC12 electronics
Fixed, e786s, Wed Jun 26 10:29:30 2019, OttoRun, RUN, General, Cryo-3He, Run60 
========================================
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel

Stop at 2019-06-26 17:59:14.820418
Stop comment: change of Brho
    Fixed, e786s, Wed Jun 26 14:40:58 2019, OttoRun, RUN, General, Cryo-3He, Run60 6x

OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel
    Fixed, e786s, Wed Jun 26 15:48:50 2019, OttoRun, RUN, General, Cryo-3He, Run60 run60_6.png

OttoRun wrote:

OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel


No beeam from 15.00. According to PCP, there will be no beam for a while
    Fixed, e786s, Wed Jun 26 15:50:36 2019, OttoRun, RUN, General, Cryo-3He, Run60 run60_6.png

OttoRun wrote:

OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel


No Beam since 15:00. According to PCP there will be no beam for a while.
Fixed, e768s, Tue Jul 16 20:43:05 2019, OttoRun, RUN, General, LiF, Run60 E_TOF_run0060.pngE_Theta_run0060.png
*************************
Run : 60
*************************

Start at 2019-07-16 20:42:55.802674

15N beam tuning

50 kHz on profiler fluctuating


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +7 mm

Stop at 2019-07-17 01:55:00.437286
Stop comment: Test run (many modifications during this run)
    Fixed, e768s, Wed Jul 17 08:44:41 2019, OttoRun, RUN, General, LiF, Run60 



OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-07-16 20:42:55.802674

15N beam tuning

50 kHz on profiler fluctuating


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +7 mm

Stop at 2019-07-17 01:55:00.437286
Stop comment: Test run (many modifications during this run)
Fixed, e793s, Fri Mar 12 15:19:35 2021, OttoRun, RUN, General, CD2, Run60 
*************************
Run : 60
*************************

Start at 2021-03-12 15:19:14.732769

Test run. ACQ DT

ATC6 pos 0 is back
14C is removed
starting again after beam line reparation of power supply

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-12 16:53:37.438208
Stop comment: stop run after tuning of the beam
Fixed, e768s, Mon Jul 15 19:56:52 2019, OttoRun, RUN, General, 3-alpha, Run6 
*************************
Run : 6
*************************

Start at 2019-07-15 17:39:19.237140

3 alpha calibration run
+ MM2 masks
+ suppressed pedestals (new pedestal for all trap detectors)

Square detectors:
+ MG10: not biased
+ MG9 removed
Fixed, e744s, Thu Apr 11 00:28:44 2019, OttoRun, RUN, General, CH2, Run59 run59_Brho_Cats2_15N6_targetch2.png
*************************
Run : 59
*************************

Start at 2019-04-11 00:27:28.387554

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: CH2 100 um (Position 2)
  • Beam: 14N
  • Intensity: ~ 2e+4
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Target inserted (100 um ) and Cats2 in
Placing Finger on The beam


Stop at 2019-04-11 00:49:00.966603
Stop comment:
Fixed, e786s, Wed Jun 26 05:33:50 2019, OttoRun, RUN, General, Cryo-3He, Run59 
*************************
Run : 59
*************************

Start at 2019-06-26 05:32:53.325868

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

5 to 5h30 - Restarted GTS Tree by Emmanuel
6h00 - Validation broken again

Stop at 2019-06-26 09:44:56.521500
Stop comment: Stopping to Realign GTS Tree
Fixed, e768s, Tue Jul 16 20:37:10 2019, OttoRun, RUN, General, LiF, Run59 
*************************
Run : 59
*************************

Start at 2019-07-16 20:35:43.781384

15N beam tuning

50 kHz on profiler fluctuating


Target #1 1.25 mg/cm2

Brho = 0.640 Tm


plastic off
diamond on

mask: +22

Stop at 2019-07-16 20:42:51.944331
Stop comment: wrong mask position
Fixed, e793s, Fri Mar 12 13:40:59 2021, OttoRun, RUN, General, CD2, Run59 
*************************
Run : 59
*************************

Start at 2021-03-12 13:40:31.431982

Test run. ACQ DT

(ATC6 crystal stopped)
starting again after beam line reparation of power supply

Beam: 3.5e5 pps
target: CD2 0.5mg
Trigger are MUGAST/MM/CATS%

Stop at 2021-03-12 13:42:17.319503
Stop comment: stopping daq because agata daq did not start
Fixed, e744s, Thu Apr 11 00:03:37 2019, OttoRun, RUN, General, N/A, Run58 run58_Brho_Cats2_14N.png
========================================
*************************
Run : 58
*************************

Start at 2019-04-11 00:03:18.437004

Run Conditions:
  • Operator: A. Lemasson
  • Trigger: VAMOS
  • Target/Source: No Target
  • Beam: 14N
  • Intensity: ~ 1e3
  • Brho = 0.79067 Tm
  • CATS 2 IN


Comment:
Reference Run Without target and IC OK PPAC voltages were too low in MW08
C6 E5-H0 -1.5
C6 E3-VE 0.5
After Setting IC Threshold
Placing Finger on The beam


Stop at 2019-04-11 00:16:46.322754
Stop comment:
run58_Brho_Cats2_14N.png -> Brho no target Cats2
    Fixed, e744s, Thu Apr 11 00:06:50 2019, A. Lemasson, RUN, General, N/A, Run58 XfTFFinger.pngrun58_Brho_Cats2_14N.png
Without Finger 21 kHz -> Reduced to 800 Hz with finger
Fixed, e786s, Tue Jun 25 16:58:53 2019, OttoRun, RUN, General, Cryo-3He, Run58 
========================================
*************************
Run : 58
*************************

Start at 2019-06-25 16:56:44.425517

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Beam is back
scaler_run_58.png taken at the beginning of the run.

Stop at 2019-06-26 05:02:52.980409
Stop comment:
    Fixed, e786s, Tue Jun 25 18:14:38 2019, OttoRun, RUN, General, Cryo-3He, Run58 cats_run_58.png

OttoRun wrote:
*************************
Run : 58
*************************

Start at 2019-06-25 16:56:44.425517

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Beam is back
scaler_run_58.png taken at the beginning of the run.


In the CATS position spectra the central part is missing.
It is possible that the gain is two high for the actual high intensity of the beam.
    Fixed, e786s, Tue Jun 25 22:20:36 2019, Franco, RUN, General, Cryo-3He, Run58 BRho_run58.png

OttoRun wrote:

OttoRun wrote:
*************************
Run : 58
*************************

Start at 2019-06-25 16:56:44.425517

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Beam is back
scaler_run_58.png taken at the beginning of the run.


In the CATS position spectra the central part is missing (maybe for the high intensity of the beam?).
We can anyway recover the time information.

After the decrease of the high voltage of VAMOS drift chamber to avoid saturation of the signals
the BRho resolution has worsened of about 25% (see attachment). We will now increase it again (h. 22.30).
    Fixed, e786s, Tue Jun 25 23:55:34 2019, Franco, RUN, General, Cryo-3He, Run58 scaler_run_58_2.png

Franco wrote:

OttoRun wrote:

OttoRun wrote:
*************************
Run : 58
*************************

Start at 2019-06-25 16:56:44.425517

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Beam is back
scaler_run_58.png taken at the beginning of the run.

scaler_run_58.png is taken after 7h.


In the CATS position spectra the central part is missing (maybe for the high intensity of the beam?).
We can anyway recover the time information.

After the decrease of the high voltage of VAMOS drift chamber to avoid saturation of the signals
the BRho resolution has worsened of about 25% (see attachment). We will now increase it again (h. 22.30).

ELOG Home Page