MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 36 of 132  Not logged in MUGAST
Fixed, e768s, Tue Jul 23 11:02:54 2019, Kseniia, Gilbert, BEAM, General, , Beam profile FF0E1C03-CD2A-4BAB-8E82-26422F7EB866.jpegScreenshot_from_2019-07-23_11-04-17.pngScreenshot_from_2019-07-23_11-04-05.png
Fixed, e768s, Tue Jul 23 12:00:25 2019, Christian, BEAM, General, LiF, Profiler and beam current scaling since 11;10 
See also AGATA elog and run-log entry
Fixed, e768s, Tue Jul 23 13:11:36 2019, OttoRun, RUN, General, LiF, Run127 
*************************
Run : 127
*************************

Start at 2019-07-23 13:09:00.419349


Beam intensity: 1.5e7 pps
OR VAMOS ~ 1100 Hz
after check of beam intensity on target (factor of 2 in transmission with target)


Target: 1.25 mg/cm2 (nb 1) 7LiF

Triggers:
MUGAST (backward, MM, 90 deg)
VAMOS %100
BaF2 %100

Rates:

FAG: 87
MUGAST: 70
OR AGATA: 1100
OR VAMOS: 940


MG3 pedestal suppression between 0 and 6800

Shift of beam, retuning from PCP

Stop at 2019-07-23 13:17:22.129736
Stop comment: End of short run 127
Fixed, e768s, Tue Jul 23 13:20:20 2019, mugast, RUN, General, N/A, Beam stop for canicule 
At 13.16 the beam was stopped due to the high temperature.
Bertrand is switching off the magnets of VAMOS.
    Fixed, e768s, Tue Jul 23 14:33:03 2019, Marlène, Yorick, Faïrouz & Nicolas, BEAM, General, , Cheking beam transmission from G1 profiler to VAMOS 714D4921-2A75-44B7-AD8D-87048BDA17A8.jpeg6A77930D-8992-4118-B59C-DBAA37289533.jpeg3CD66D1D-D6E6-44B4-A15A-C947F048D2A0.jpeg
Goal:
Estimate beam transmission from profiler to VAMOS (FP)
We question whether the factor of two found yesterday (VAMOS/Profiler ~ 0.5) could be due:
1. to an incorrect measurement of the beam intensity with the profiler
2. a charge state equilibration in the target (LISE++ calculation indicates 8+/7+ = 85%/15%)

Same conditions as yesterday:
1. Beam intensity is reduced with the pepper pot 1/9 and by closing slits after the 15O target production and the accelerators so that the beam quality (emittance, etc...) is not affected.
2. VAMOS plate is removed to allow the direct beam detection

Results:
We measure in VAMOS with the LiF target and with the target ladder totally removed. In the latter case, direct beam 15O(8+) is sent in VAMOS and no charge state effect enter into the game.
1. Beam intensity at G1 profiler ~ 6.5e4 pps
VAMOS (FP) + no target ~ 3.8e4 pps
2. Beam intensity at G1 profiler ~ 3.8e4 pps
VAMOS (FP) + thick LiF (nb 1) ~ 2.0e4 pps

Discussion:
We find the same results as yesterday, e.g. a factor of two attenuation between the profiler and VAMOS. If part of this loss would happen in the pipe/target/MUST2 mask, this should be observed in AGATA which is not the case. Could it be that the PPAC in VAMOS is not as efficient as announced at the beginning of the campaign (98%)? This must be checked when we get beam back later on.

Note:
While doing the above measurement, we observed a factor of 3 loss between profiler AR.Gaz13 and G1.Gaz31. Numbers follows:
L3.GAZ42 AR.GAZ13 G1.GAZ31
2.1e4 1.5e4 4.1e3
1.4e5 1.0e5 2.5e4
??? 1.8e5 6.5e4
Fixed, e768s, Tue Jul 23 15:03:54 2019, Diego Ramos, OTHER, Hardware, N/A, Diamond threshold 
The threshold of the Diamond was increased from ~50 mV to ~300 mV
Fixed, e768s, Tue Jul 23 16:19:14 2019, Marlène, OTHER, Hardware, , VAMOS division 
VAMOS division was set 10 instead of 100.
CATS 1 & CATS2 scalers are sent to the two last channels of the scaler
Fixed, e768s, Tue Jul 23 19:21:50 2019, Nicolas, OTHER, Social, N/A, Waiting end of canicule (and beam!) IMG_20190723_173257.jpg
Fixed, e768s, Wed Jul 24 12:40:49 2019, OttoRun, RUN, General, LiF, Run128 
*************************
Run : 128
*************************

Start at 2019-07-24 12:40:32.602728

Test of scalers

Stop at 2019-07-24 12:43:18.414715
Stop comment:
Fixed, e768s, Wed Jul 24 13:33:34 2019, OttoRun, RUN, General, LiF, Run129 
*************************
Run : 129
*************************

Start at 2019-07-24 13:29:27.436829

Test of scalers

Started with the setting of VAMOS with 15N beam + target. Plate removed.

Stop at 2019-07-24 14:22:17.151753
Stop comment: type your message here
Fixed, e768s, Wed Jul 24 14:41:09 2019, mugast, RUN, General, N/A, VAMOS divison 30 
VAMOs division is set to 30
Fixed, e768s, Wed Jul 24 14:57:51 2019, OttoRun, RUN, General, LiF, Run130 
*************************
Run : 130
*************************

Start at 2019-07-24 14:45:43.707908

Test of scalers

Started with the setting of VAMOS with 15N beam + target. Plate removed.

Stop at 2019-07-24 14:57:53.598976
Stop comment:
Fixed, e768s, Wed Jul 24 15:12:07 2019, OttoRun, RUN, General, LiF, Run132 
*************************
Run : 132
*************************

Start at 2019-07-24 15:05:21.496150

Test of scalers

Started with the setting of VAMOS with 15N beam + target. Plate removed.

Stop at 2019-07-24 15:53:35.796063
Stop comment:
Fixed, e768s, Wed Jul 24 16:04:04 2019, OttoRun, RUN, General, LiF, Run133 
*************************
Run : 133
*************************

Start at 2019-07-24 16:01:41.339572

Stable 15N beam @ ~ 1-2e8 pps

Brho = Tm

target LiF thick number 1

Trigger:
MUGAST
VAMOS %30
BaF2 %100

Stop at 2019-07-24 16:44:55.787916
Stop comment: type your message here
Fixed, e768s, Wed Jul 24 16:24:18 2019, Nicolas, OTHER, General, , 19Ne / 19F analog connections ne19_f19_AnalogStates.pdf
Fixed, e768s, Wed Jul 24 16:51:16 2019, OttoRun, RUN, General, LiF, Run135 
*************************
Run : 135
*************************

Start at 2019-07-24 16:43:07.051256

Stable 15N beam @ ~ 1-2e8 pps

Brho = 0.64 Tm (ref Brho = central trajectory)

target LiF thick number 1

Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%

Stop at 2019-07-25 07:21:33.253248
Stop comment: End of run 135
Fixed, e768s, Wed Jul 24 17:21:27 2019, Diego, OTHER, General, , VAMOS Acceptance with different positions of the beam in the target VAMOS_acceptance_for_different_positions_at_the_target.png
Fixed, e768s, Wed Jul 24 22:10:04 2019, Chloé, Yorick, ONLINE, General, LiF, Spectra Run 135 24/07/19 22:00 6x
Fixed, e768s, Thu Jul 25 03:58:19 2019, François et Gilbert, RUN, General, LiF, Spectra Run 135 25/07/19 4:00 6x
Second snapshot of run 135
Spectra refreshed
Fixed, e768s, Thu Jul 25 07:00:15 2019, mugast, RUN, General, LiF, Run 135 - stop 6x
Qpole 41 lost (Q41). Beam stopped before recovery.
Operator not able to get it back. Will try without waiting on next operator.

ELOG Home Page