MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 36 of 132  Not logged in MUGAST
Fixed, e768s, Tue Jul 23 11:02:54 2019, Kseniia, Gilbert, BEAM, General, , Beam profile FF0E1C03-CD2A-4BAB-8E82-26422F7EB866.jpegScreenshot_from_2019-07-23_11-04-17.pngScreenshot_from_2019-07-23_11-04-05.png
 
Fixed, e768s, Tue Jul 23 12:00:25 2019, Christian, BEAM, General, LiF, Profiler and beam current scaling since 11;10 
See also AGATA elog and run-log entry
Fixed, e768s, Tue Jul 23 13:11:36 2019, OttoRun, RUN, General, LiF, Run127 
*************************
  [SIZE=3][B]Run  : 127[/B][/SIZE]
*************************
Fixed, e768s, Tue Jul 23 13:20:20 2019, mugast, RUN, General, N/A, Beam stop for canicule 
At 13.16 the beam was stopped due to the high temperature.
Bertrand is switching off the magnets of VAMOS.
    Fixed, e768s, Tue Jul 23 14:33:03 2019, Marlène, Yorick, Faïrouz & Nicolas, BEAM, General, , Cheking beam transmission from G1 profiler to VAMOS 714D4921-2A75-44B7-AD8D-87048BDA17A8.jpeg6A77930D-8992-4118-B59C-DBAA37289533.jpeg3CD66D1D-D6E6-44B4-A15A-C947F048D2A0.jpeg
Goal:
Estimate beam transmission from profiler to VAMOS (FP)
We question whether the factor of two found yesterday (VAMOS/Profiler ~ 0.5) could be due:
Fixed, e768s, Tue Jul 23 15:03:54 2019, Diego Ramos, OTHER, Hardware, N/A, Diamond threshold 
The threshold of the Diamond was increased from ~50 mV to ~300 mV
Fixed, e768s, Tue Jul 23 16:19:14 2019, Marlène, OTHER, Hardware, , VAMOS division 
VAMOS division was set 10 instead of 100.
CATS 1 & CATS2 scalers are sent to the two last channels of the scaler
Fixed, e768s, Tue Jul 23 19:21:50 2019, Nicolas, OTHER, Social, N/A, Waiting end of canicule (and beam!) IMG_20190723_173257.jpg
 
Fixed, e768s, Wed Jul 24 12:40:49 2019, OttoRun, RUN, General, LiF, Run128 
*************************
  [SIZE=3][B]Run  : 128[/B][/SIZE]
*************************
Fixed, e768s, Wed Jul 24 13:33:34 2019, OttoRun, RUN, General, LiF, Run129 
*************************
  [SIZE=3][B]Run  : 129[/B][/SIZE]
*************************
Fixed, e768s, Wed Jul 24 14:41:09 2019, mugast, RUN, General, N/A, VAMOS divison 30 
VAMOs division is set to 30
Fixed, e768s, Wed Jul 24 14:57:51 2019, OttoRun, RUN, General, LiF, Run130 
*************************
  [SIZE=3][B]Run  : 130[/B][/SIZE]
*************************
Fixed, e768s, Wed Jul 24 15:12:07 2019, OttoRun, RUN, General, LiF, Run132 
*************************
  [SIZE=3][B]Run  : 132[/B][/SIZE]
*************************
Fixed, e768s, Wed Jul 24 16:04:04 2019, OttoRun, RUN, General, LiF, Run133 
*************************
  [SIZE=3][B]Run  : 133[/B][/SIZE]
*************************
Fixed, e768s, Wed Jul 24 16:24:18 2019, Nicolas, OTHER, General, , 19Ne / 19F analog connections ne19_f19_AnalogStates.pdf
 
Fixed, e768s, Wed Jul 24 16:51:16 2019, OttoRun, RUN, General, LiF, Run135 
*************************
  [SIZE=3][B]Run  : 135[/B][/SIZE]
*************************
Fixed, e768s, Wed Jul 24 17:21:27 2019, Diego, OTHER, General, , VAMOS Acceptance with different positions of the beam in the target VAMOS_acceptance_for_different_positions_at_the_target.png
 
Fixed, e768s, Wed Jul 24 22:10:04 2019, Chloé, Yorick, ONLINE, General, LiF, Spectra Run 135 24/07/19 22:00 6x
 
Fixed, e768s, Thu Jul 25 03:58:19 2019, François et Gilbert, RUN, General, LiF, Spectra Run 135 25/07/19 4:00 6x
Second snapshot of run 135
Spectra refreshed
Fixed, e768s, Thu Jul 25 07:00:15 2019, mugast, RUN, General, LiF, Run 135 - stop 6x
Qpole 41 lost (Q41). Beam stopped before recovery.
Operator not able to get it back. Will try without waiting on next operator.

ELOG Home Page