MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 33 of 132  Not logged in MUGAST
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Date Author Type Category Target-Source Subject
FixedTEST Sat Apr 13 21:25:17 2019 OttoH.V.OTHERHardwareN/AHVM_ERROR
*** hvm watcher error ***
FP_CATS0 Slot: 2 (A1821HMP) Channel:6 Vmon: 558.25 V Imon: 0.385 uA Status: OVER CURRENT

FP_CATS1 Slot: 2 (A1821HMP) Channel:7 Vmon: 558.75 V Imon: 0.374 uA Status: OVER CURRENT

FixedTEST Sat Apr 13 21:26:07 2019 OttoH.V.OTHERHardwareN/AHVM_ERROR
*** hvm watcher error ***
FP_CATS2 Slot: 2 (A1821HMP) Channel:8 Vmon: 569.5 V Imon: 0 uA Status: OVER CURRENT

FixedTEST Sat Apr 13 21:26:16 2019 OttoH.V.OTHERHardwareN/AHVM_ERROR
*** hvm watcher error ***
FP_CATS0 Slot: 2 (A1821HMP) Channel:6 Vmon: 37.25 V Imon: 0 uA Status: INTERNAL TRIP

FP_CATS1 Slot: 2 (A1821HMP) Channel:7 Vmon: 57.75 V Imon: 0 uA Status: INTERNAL TRIP

FixedTEST Sat Apr 13 21:26:49 2019 OttoH.V.OTHERHardwareN/AHVM_ERROR
*** hvm watcher error ***
FP_CATS3 Slot: 2 (A1821HMP) Channel:9 Vmon: 542.75 V Imon: 0.447 uA Status: OVER CURRENT

Fixede744s Sat Apr 13 21:34:02 2019 Adrien Matta -> update IulianRUNGeneralN/AInconsistent info in the run message-fix explained in reply
Be careful to fill in correctly all info in the start run message.

There is inconsistency in run 121 comment (target 2) and list (target 3).

Thèse information will be used for the analysis.

Iulian->
This discrepancy has been addressed
Fixede744s Sat Apr 13 21:47:40 2019 SylvainRUNGeneralCH2Log & Scalers -- Run 122 at 21:45
Attachment 1: run122_1_scalers_v11.png
run122_1_scalers_v11.png
Attachment 2: run122_Vamos9_1.png
run122_Vamos9_1.png
Attachment 3: run122_Vamos9_2.png
run122_Vamos9_2.png
Attachment 4: run122_Vamos9_3.png
run122_Vamos9_3.png
Attachment 5: run122_Vamos9_4.png
run122_Vamos9_4.png
Attachment 6: run122_Vamos9_5.png
run122_Vamos9_5.png
Attachment 7: run122_Vamos9_6.png
run122_Vamos9_6.png
Attachment 8: run122_Vamos9_7.png
run122_Vamos9_7.png
Attachment 9: run122_Vamos9_8.png
run122_Vamos9_8.png
Attachment 10: run122_Vamos9_9.png
run122_Vamos9_9.png
Attachment 11: run122_Vamos9_10.png
run122_Vamos9_10.png
Attachment 12: run122_Vamos9_11.png
run122_Vamos9_11.png
Attachment 13: run122_1_Mugast_9_1.png
run122_1_Mugast_9_1.png
Attachment 14: run122_1_Mugast_9_2.png
run122_1_Mugast_9_2.png
Attachment 15: run122_1_Mugast_9_3.png
run122_1_Mugast_9_3.png
Attachment 16: run122_1_Mugast_9_4.png
run122_1_Mugast_9_4.png
Attachment 17: run122_1_Mugast_9_5.png
run122_1_Mugast_9_5.png
Attachment 18: run122_1_Mugast_9_6.png
run122_1_Mugast_9_6.png
Attachment 19: run122_1_Mugast_9_7.png
run122_1_Mugast_9_7.png
Attachment 20: run122_1_Mugast_9_8.png
run122_1_Mugast_9_8.png
FixedTEST Sat Apr 13 21:48:12 2019 OttoH.V.OTHERHardwareN/AHVM_ERROR
*** hvm watcher error ***
FP_CATS1 Slot: 2 (A1821HMP) Channel:7 Vmon: 523.75 V Imon: 0.991 uA Status: OVER CURRENT

Ongoinge744s Sat Apr 13 21:57:48 2019 Adrien MattaRUNGeneralN/AInconsistent info in the run message

Adrien Matta wrote:
Be careful to fill in correctly all info in the start run message.

There is inconsistency in run 121 comment (target 2) and list (target 3).

Thèse information will be used for the analysis.


--> Well.. in entry 4175 it is written target 3...
... ...
Fixede744s Sat Apr 13 22:04:32 2019 Adrien MattaRUNGeneralN/AInconsistent info in the run message

Adrien Matta wrote:
Be careful to fill in correctly all info in the start run message.

There is inconsistency in run 121 comment (target 2) and list (target 3).

Thèse information will be used for the analysis.


--> The misleading comment is preseved from run 103,
... the last #2 target was at run 110
... Iulian is removing the comments on #2 target that appear untill 121
Fixede744s Sat Apr 13 22:10:37 2019 OttoRunRUNGeneralCH2Run121

OttoRun wrote:
*************************
Run : 121
*************************

Start at 2019-04-13 06:16:15.350431

Run Conditions:
  • Operator: Mariluz Nikola Nicolas
  • Trigger: MUGAST + Vamos %1000 + CATS %30000
  • Target #3
  • Beam: 14O
  • Intensity: ~2e4
  • Brho = 0.5199 Tm
  • CATS2 in
  • Finger at +12 mm
  • WITH AGATA


Comment:
Start Target 2: 104 um
VAMOS is Open
AGATA Coupling
Fixede744s Sat Apr 13 22:40:00 2019 DiegoVAMOSGeneral Saturation in the WIRES of Drift chamber due to Pile-Up
There is Saturation in the Energy of the WIRES due to the Pile-up, it is not urgent to correct it because these parameters are not needed for the reconstruction. Tomorrow morning, when stopping the run, we should change the offsets in NUMEXO in order to better allocate the amplitude of the signals.
Attachment 1: DC_Wire_saturation.png
DC_Wire_saturation.png
Fixede744s Sat Apr 13 22:45:27 2019 Beyhan, Sylvain, JaromirAGATASoftwareN/AAgata yellow phase 1 minute
Agata yellow 1 minute

All the trigers emitted by (every) single crystal were refused by ACQ for 1 minute.
Reason unknown now.
Fixede744s Sat Apr 13 23:02:27 2019 Valerian, Freddy and IulianOFFLINEGeneralCH2Very preliminary results for two protons
Join are very preliminary spectra for the two protons events gated on 13N in VAMOS with a multiplicity 2 event in MUST2.
Attachment 1: TwoProtons_run122_0_1.png
TwoProtons_run122_0_1.png
Fixede744s Sat Apr 13 23:19:57 2019 Valerian, Freddy, Iulian and FairouzOFFLINESoftwareCH2Very preliminary results for two protons
Join are very preliminary spectra for the two protons events gated on 13N in VAMOS with a multiplicity 1 event in MUST2. This condition adds a lot of noise.
Attachment 1: TwoProtonsMult1_run122_0_1.png
TwoProtonsMult1_run122_0_1.png
Fixede744s Sat Apr 13 23:25:14 2019 iulianRUNGeneralN/AInconsistent info in the run message
This inconsistency has been addressed

Adrien Matta wrote:

Adrien Matta wrote:
Be careful to fill in correctly all info in the start run message.

There is inconsistency in run 121 comment (target 2) and list (target 3).

Thèse information will be used for the analysis.


--> Well.. in entry 4175 it is written target 3...
... ...
Fixede744s Sun Apr 14 00:06:05 2019 Chloé, Fairouz, Sylvain, DamienRUNGeneralCH2Log & Scalers -- Run 122 at 00:06
Attachment 1: run122_1_scalers_v12.png
run122_1_scalers_v12.png
Attachment 2: run122_1_Mugast_10_8.png
run122_1_Mugast_10_8.png
Attachment 3: run122_1_Mugast_10_7.png
run122_1_Mugast_10_7.png
Attachment 4: run122_1_Mugast_10_6.png
run122_1_Mugast_10_6.png
Attachment 5: run122_1_Mugast_10_5.png
run122_1_Mugast_10_5.png
Attachment 6: run122_1_Mugast_10_4.png
run122_1_Mugast_10_4.png
Attachment 7: run122_1_Mugast_10_3.png
run122_1_Mugast_10_3.png
Attachment 8: run122_1_Mugast_10_2.png
run122_1_Mugast_10_2.png
Attachment 9: run122_1_Mugast_10_1.png
run122_1_Mugast_10_1.png
Attachment 10: run122_Vamos10_11.png
run122_Vamos10_11.png
Attachment 11: run122_Vamos10_10.png
run122_Vamos10_10.png
Attachment 12: run122_Vamos10_9.png
run122_Vamos10_9.png
Attachment 13: run122_Vamos10_8.png
run122_Vamos10_8.png
Attachment 14: run122_Vamos10_7.png
run122_Vamos10_7.png
Attachment 15: run122_Vamos10_6.png
run122_Vamos10_6.png
Attachment 16: run122_Vamos10_5.png
run122_Vamos10_5.png
Attachment 17: run122_Vamos10_4.png
run122_Vamos10_4.png
Attachment 18: run122_Vamos10_3.png
run122_Vamos10_3.png
Attachment 19: run122_Vamos10_2.png
run122_Vamos10_2.png
Attachment 20: run122_Vamos10_1.png
run122_Vamos10_1.png
Fixede744s Sun Apr 14 02:04:32 2019 Faïrouz, Chloé, Sylvain & DamienRUNGeneralCH2Beam lost
Beam stopped because of the HF of C01.
L'astreinte va venir. Arrêt estimé une demi-heure ou plus.
On a remarqué sur le spectre impact qu'on a perdu deux strips de plus sur le MUST2 haut-gauche à partir du run 120 6h00 du matin
Attachment 1: run122_Vamos11_1.png
run122_Vamos11_1.png
Attachment 2: run122_Vamos11_2.png
run122_Vamos11_2.png
Attachment 3: run122_Vamos11_3.png
run122_Vamos11_3.png
Attachment 4: run122_Vamos11_4.png
run122_Vamos11_4.png
Attachment 5: run122_Vamos11_5.png
run122_Vamos11_5.png
Attachment 6: run122_Vamos11_6.png
run122_Vamos11_6.png
Attachment 7: run122_Vamos11_7.png
run122_Vamos11_7.png
Attachment 8: run122_Vamos11_8.png
run122_Vamos11_8.png
Attachment 9: run122_Vamos11_9.png
run122_Vamos11_9.png
Attachment 10: run122_Vamos11_10.png
run122_Vamos11_10.png
Attachment 11: run122_Vamos11_11.png
run122_Vamos11_11.png
Attachment 12: run122_1_Mugast_11_1.png
run122_1_Mugast_11_1.png
Attachment 13: run122_1_Mugast_11_2.png
run122_1_Mugast_11_2.png
Attachment 14: run122_1_Mugast_11_3.png
run122_1_Mugast_11_3.png
Attachment 15: run122_1_Mugast_11_4.png
run122_1_Mugast_11_4.png
Attachment 16: run122_1_Mugast_11_5.png
run122_1_Mugast_11_5.png
Attachment 17: run122_1_Mugast_11_6.png
run122_1_Mugast_11_6.png
Attachment 18: run122_1_Mugast_11_7.png
run122_1_Mugast_11_7.png
Attachment 19: run122_1_Mugast_11_8.png
run122_1_Mugast_11_8.png
Fixede744s Sun Apr 14 03:30:28 2019 Iulian IuliaOFFLINESocialCH2first calculation ECM ThetaCM for gamma-P emission
Attachment 1: first_gammaP_rec.pdf
first_gammaP_rec.pdf
Attachment 2: Alias_iul.C
TTree *tTmp;
void SetAlias()
{
  tTmp = (TTree*) gROOT->FindObject("PhysicsTree");
  //  tTmp->SetAlias("mp","1.00866491582");
  // tTmp->SetAlias("m14o","14.008596706");
  // tTmp->SetAlias("Elab14o","71.");//MeV
  // tTmp->SetAlias("Erel14o","1.00866491582*14.008596706/(1.00866491582+14.008596706)/(1.00866491582+14.008596706)*71."); 
  tTmp->SetAlias("EPCM","ELab+4.4485492-2*sqrt(ELab*4.4485492)*cos(ThetaLab/57.4)");
  tTmp->SetAlias("ThetaPCM","57.4*(3.14-acos((EPCM+4.4485492-ELab)/2./sqrt(EPCM*4.4485492)))");


  //tTmp->SetAlias("EPCM","ELab+Erel14o-2*sqrt(ELab*Erel14o)*cos(ThetaLab)");
  //tTmp->SetAlias("ThetaPCM","57.4*(3.14-atan((EPCM+Erel14o-ELab)/2./sqrt(EPCM*Erel14o)))");


}
Fixede744s Sun Apr 14 04:04:33 2019 Faïrouz, Chloé, Sylvain, Damien & IuliaRUNGeneralCH2Beam is back @ 3e4 pps in CATS
Attachment 1: run122_1_scalers_v13.png
run122_1_scalers_v13.png
Fixede744s Sun Apr 14 04:11:22 2019 Faïrouz, Chloé, Sylvain, Damien & IuliaRUNGeneralCH2Beam is @ 6e4 pps in CATS
Beam Beam is @ 6e4 pps in CATS now but it continuous increasing

ELOG Home Page