Fixed, e744s, Sat Apr 13 11:42:16 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, ONLINE, Social, CH2, Screenshots - spectra zeroed after previous screenshot taking 20x
|
spectra zeroed after previous screenshot taking |
Fixed, e775s, Sat Feb 29 14:32:39 2020, mugast : Valerian, GRIT, Hardware, N/A, Scheme of the Mugast position in the nptool referential
|
The detectors with a cross show the problematic detectors |
Ongoing, e793s, Wed Mar 3 17:12:57 2021, Franco, S1, Hardware, N/A, Schema of the new S1
|
The signals of the new S1 will be splitted among 6 Mugast boards, according to the scheme attached.
The HV for the S1 have been updated accordingly, with labels like MG11/CsIMGXX. |
Fixed, e744s, Sat Apr 13 15:25:56 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, Catalin, ONLINE, General, CH2, Scalers v8 for run122.1
|
"1_" added to screenshot filenames to indicate automatic file opening |
Fixed, e744s, Mon Apr 15 07:04:28 2019, Freddy, Magda, Jaromir, Mihai, RUN, General, CH2, Scalers run 125_2 21x
|
|
Fixed, e768s, Mon Jul 22 08:28:00 2019, mugast, OTHER, General, LiF, Scalers at start of run124
|
|
Fixed, e744s, Tue Apr 16 21:06:17 2019, Faïrouz, Julian, Jaromir & Sylvain, RUN, General, CH2, Scalers Run 136
|
|
Fixed, e744s, Mon Apr 15 13:22:56 2019, Nikola Faïrouz Damien Ksenia, RUN, General, CH2, Scalers Run 128 21x
|
Run 128, same conditions then run 126 |
Fixed, e744s, Sat Apr 13 12:39:02 2019, Iulian ->Jaromir update, ONLINE, Hardware, N/A, Scalers - U2M23 must be the finger
|
Looks like U2M_23 is in fact the beam dump (plastic finger).
This day scalers were looked at;
|
Fixed, , Thu Apr 4 17:55:47 2019, Marlène, GRIT, General, , Scalers
|
The scalers are
Scaler 1:
|
Fixed, e744s, Sat Apr 13 12:32:03 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, ONLINE, General, CH2, Scalers
|
|
Fixed, e744s, Sat Apr 13 14:19:41 2019, Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaH, ONLINE, General, CH2, Scalers
|
|
Fixed, e768s, Sat Jul 27 04:50:45 2019, Freddy, OFFLINE, General, N/A, Scaler summary since r120
|
run 120 - 152
/home/mugast/analysis/scalereader/out/Chain.C |
Fixed, e768s, Sat Jul 27 15:37:38 2019, Fairouz, Beyhan, Daniele, RUN, General, LiF, Scaler run 154 @ 15h38- beam intensity come back to 1.4e7 pps
|
|
Fixed, e768s, Sat Jul 27 15:31:47 2019, Fairouz, Beyhan, Daniele, RUN, General, LiF, Scaler run 154 @ 15h32 - beam intensity decreased to 7e6pps 
|
|
Fixed, e768s, Thu Jul 25 17:19:52 2019, Freddy, OFFLINE, General, N/A, Scaler evolution + scaler file reader
|
Attached is a plot of several scaler (frequency as a function of time) for all data from run 120 to 140.
A software was written to process the scaler.dat files and is located in:
|
Fixed, e768s, Wed Jul 31 03:25:57 2019, Freddy, Chloé, BEAM, General, N/A, Scaler Evolution run 160
|
Scaler evolution during run 160 until 3h30 on Wednesday 31st.
- rather stable condition around 1.5 * 10^7 pps
|
Fixed, e768s, Mon Jul 29 22:00:00 2019, Freddy, Sylvain, BEAM, General, LiF, Scaler Evolution run 158
|
Evolution of scaler during run0158 _ from 19h to 24h00
--> Beam extremely unstable from zero to 10**7 pps (for not more than 5 min).
|
Fixed, e744s, Mon Apr 15 12:22:40 2019, Faïrouz, Chloé, Sylvain, Damien & Iulia, ONLINE, Social, CH2, Scaler -- Run 126 at 12:20
|
|
Fixed, e744s, Sat Apr 13 22:40:00 2019, Diego, VAMOS, General, , Saturation in the WIRES of Drift chamber due to Pile-Up
|
There is Saturation in the Energy of the WIRES due to the Pile-up, it is not urgent to correct it because these parameters are not needed for the reconstruction.
Tomorrow morning, when stopping the run, we should change the offsets in NUMEXO in order to better allocate the amplitude of the signals. |
|