MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 27 of 132  Not logged in MUGAST
Fixed, e744s, Wed Apr 10 09:06:16 2019, Adrien, OFFLINE, General, N/A, Strange size of Time Calibrator Run 
The two run for MUVI 1 are larger than the run for MUVI2 and 3.

I think this is due to the noise on MG4 that create a lot of Data but it need to be investigated.
Fixed, e768s, Mon Jul 22 05:16:22 2019, Faïrouz & Sylvain, RUN, General, LiF, Stop run 121 because problems of AGATA trigger validation  
The run 121 has to be stopped because problems of AGATA trigger validation due to very high request rate of AGATA >=85K 
Fixed, TEST, Wed Feb 3 16:42:41 2021, Franco, GRIT, General, 3-alpha, Status of the set-up (February 3rd 2021) Voltages_03022021.pngMM_raw_03022021.pngMG_X_raw_03022021.pngMG_Y_raw_03022021.png
We re-mounted the annular, put the source and cooled down to 0 deg. Voltages and spectra are attached.
MG11 has a very high current (15 uA) but stable. MG9 started from 2 uA and its current is slightly increasing. The MUST2 detectors don't show anymore that
oscillation in current that we observed one year ago. MM3 has a higher current (2.9 uA) with respect to the others.
Fixed, TEST, Thu Mar 28 15:39:01 2019, Valerian, OFFLINE, Software, N/A, Status of the converion with VAMOS program 
The conversion with VAMOS program was validated using run_0020 from com2019

Fixed, TEST, Thu Jan 23 14:06:51 2020, Franco&Marlène, GRIT, Hardware, 3-alpha, Status of detectors on 23-01-20 6x
Short alpha source run (not saved on disk) to test the detectors.

Summary : 
Fixed, TEST, Wed Jan 16 16:33:28 2019, Marlène, GRIT, General, 3-alpha, Status of detectors on 16/01/19 Detectors_status_160119.xlsxCapture_d’eÌcran_2019-01-16_aÌ€_17.05.57.png
MG1 has some issue with the HT cable (for the BT bias). There is a shortcut only under vacuum. We checked the connector but we have to do vacuum again to
check it.
Fixed, , Mon Jul 22 12:33:17 2019, Kseniia, AGATA, General, , Stats on 19Ne runs112-124-ebe.pngrun112-124-ebe.pngbeta19Ne.png
Full stats for runs 112..124 with the event-by-event Doppler correction. So, we see 4140 kev.
Also, the betas of all the 19Ne with Q= 9,10 identified in VAMOS
Fixed, e768s, Mon Jul 22 05:19:36 2019, Faïrouz & Sylvain, RUN, General, LiF, Start new run 122 Beam-profile-run121-04h51.jpg
Start new run 122. AGATA validation was recovered.

BUT the AGATA request rate is increasing very quickly!!! The OR-AGATA increased up to ~32000. 
Fixed, e744s, Thu Apr 18 17:45:45 2019, Valerian, OTHER, Hardware, N/A, Start heating and stopping Voltage + Acq  
HV+BT are off and heating is started for Arnaud to open the chamber
Fixed, , Tue Jan 22 11:15:15 2019, Marlène, GRIT, General, N/A, Square detectors MG9C_disabled_channels__no_crazy_ORD.pngMG9C_disabled_channels__no_crazy_ORD_moredetailed.pngMG9C_piedestal_of_disabled_channels_Y.png
MG9C (thin square detector coupled with thick square detector unplugged) noisy
On X channels --> no noise problem ( about 100 ORD in the dark)
On Y channels --> MATE 10 & 11 noisy ! (see picture below with noisy Y piedestals)
Fixed, e744s, Mon Apr 15 17:17:57 2019, Beyhan +..., OTHER, General, , Spreadsheet with a list of runs up to 130 runs_list.ods
 
Fixed, e744s, Sat Apr 13 19:27:16 2019, Beyhan, Jaromir, OTHER, General, N/A, Spreadsheet with a list of runs up to 122  runs_list.odsruns_list.odsruns_list.odsruns_list.odsruns_list.ods
Resides also in home directory
runs_list.ods
Fixed, e768s, Thu Jul 25 03:58:19 2019, François et Gilbert, RUN, General, LiF, Spectra Run 135 25/07/19 4:00 6x
Second snapshot of run 135
Spectra refreshed
Fixed, e768s, Wed Jul 24 22:10:04 2019, Chloé, Yorick, ONLINE, General, LiF, Spectra Run 135 24/07/19 22:00 6x
 
Pending, e793s, Mon Mar 15 00:21:18 2021, Sarah, Louis, Charlie, BEAM, General, CD2, Source is running out run62_Scaler_Mar14_00h40.png
The beam intensity spiked to 9x10^9, so Louis called PCP to ask them to reduce it. He was told that the source was almost depleted, and was presented with
two options:
Fixed, , Thu Jul 11 11:40:18 2019, Marlène & Franco, OTHER, Hardware, , Some changes in the electronic scheme  
- We checked the TACs with a time calibrator, all of them are working. Maybe to check the ADCs if some timings are not there during the exp.

- We set the possibility to have MUST2 divided by 100 (on a separate chain) in case of high rate on GMT channel number 7.
Fixed, e793s, Sun Mar 14 14:26:29 2021, Faïrouz, Juan Lois, RUN, General, CD2, Snapshots 14:20 8x
 
Fixed, e793s, Sun Mar 14 11:06:07 2021, Faïrouz, Juan Lois, BEAM, General, CD2, Slits open again. Beam intensity ~4.8e5 pps run62_Scaler_graph_11h07.png
 
Fixed, e768s, Thu Aug 1 13:50:30 2019, Valerian, Nicolas et Fairouz, OTHER, Hardware, N/A, Single channel time calibration proof of principle ProofOfPrincipleM2.pngProofOfPrincipleTAC.png
To launch this calib, redo a write hardware with DAS before.
Then do a  ./calibT_SingleChannel in the xterm of RCC.
Fixed, e768s, Thu Aug 1 13:59:30 2019, Valerian, Nicolas et Fairouz, OTHER, Hardware, N/A, Single channel time calibration proof of principle ProofOfPrincipleTAC.pngProofOfPrincipleM2.pngToDoInDAS.png
To launch this calib, redo a write hardware with DAS before.

Then do a  ./calibT_SingleChannel in the xterm of RCC.

ELOG Home Page