Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e744s |
Wed Apr 10 09:06:16 2019 |
Adrien | OFFLINE | General | N/A | Strange size of Time Calibrator Run | The two run for MUVI 1 are larger than the
run for MUVI2 and 3.
|
|
Fixed | e768s |
Mon Jul 22 05:16:22 2019 |
Faïrouz & Sylvain | RUN | General | LiF | Stop run 121 because problems of AGATA trigger validation | The run 121 has to be stopped because problems
of AGATA trigger validation due to very high
request rate of AGATA >=85K |
|
Fixed | TEST |
Wed Feb 3 16:42:41 2021 |
Franco | GRIT | General | 3-alpha | Status of the set-up (February 3rd 2021) | We re-mounted the annular, put the source
and cooled down to 0 deg. Voltages and spectra
are attached.
|
   |
Fixed | TEST |
Thu Mar 28 15:39:01 2019 |
Valerian | OFFLINE | Software | N/A | Status of the converion with VAMOS program | The conversion with VAMOS program was validated
using run_0020 from com2019
|
|
Fixed | TEST |
Thu Jan 23 14:06:51 2020 |
Franco&Marlène | GRIT | Hardware | 3-alpha | Status of detectors on 23-01-20 | Short alpha source run (not saved on disk)
to test the detectors.
|
6x |
Fixed | TEST |
Wed Jan 16 16:33:28 2019 |
Marlène | GRIT | General | 3-alpha | Status of detectors on 16/01/19 | MG1 has some issue with the HT cable (for
the BT bias). There is a shortcut only under
vacuum. We checked the connector but we have |
 |
Fixed | |
Mon Jul 22 12:33:17 2019 |
Kseniia | AGATA | General | | Stats on 19Ne | Full stats for runs 112..124 with the event-by-event
Doppler correction. So, we see 4140 kev.
Also, the betas of all the 19Ne with Q= 9,10 |
  |
Fixed | e768s |
Mon Jul 22 05:19:36 2019 |
Faïrouz & Sylvain | RUN | General | LiF | Start new run 122 | Start new run 122. AGATA validation was recovered.
BUT the AGATA request rate is increasing |
|
Fixed | e744s |
Thu Apr 18 17:45:45 2019 |
Valerian | OTHER | Hardware | N/A | Start heating and stopping Voltage + Acq | HV+BT are off and heating is started for Arnaud
to open the chamber |
|
Fixed | |
Tue Jan 22 11:15:15 2019 |
Marlène | GRIT | General | N/A | Square detectors | MG9C (thin square detector coupled with thick
square detector unplugged) noisy
On X channels --> no noise problem ( about |
  |
Fixed | e744s |
Mon Apr 15 17:17:57 2019 |
Beyhan +... | OTHER | General | | Spreadsheet with a list of runs up to 130 | |
|
Fixed | e744s |
Sat Apr 13 19:27:16 2019 |
Beyhan, Jaromir | OTHER | General | N/A | Spreadsheet with a list of runs up to 122 | Resides also in home directory
runs_list.ods
|
    |
Fixed | e768s |
Thu Jul 25 03:58:19 2019 |
François et Gilbert | RUN | General | LiF | Spectra Run 135 25/07/19 4:00 | Second snapshot of run 135
Spectra refreshed |
6x |
Fixed | e768s |
Wed Jul 24 22:10:04 2019 |
Chloé, Yorick | ONLINE | General | LiF | Spectra Run 135 24/07/19 22:00 | |
6x |
Pending | e793s |
Mon Mar 15 00:21:18 2021 |
Sarah, Louis, Charlie | BEAM | General | CD2 | Source is running out | The beam intensity spiked to 9x10^9, so Louis
called PCP to ask them to reduce it. He was
told that the source was almost depleted, |
|
Fixed | |
Thu Jul 11 11:40:18 2019 |
Marlène & Franco | OTHER | Hardware | | Some changes in the electronic scheme | - We checked the TACs with a time calibrator,
all of them are working. Maybe to check the
ADCs if some timings are not there during |
|
Fixed | e793s |
Sun Mar 14 14:26:29 2021 |
Faïrouz, Juan Lois | RUN | General | CD2 | Snapshots 14:20 | |
8x |
Fixed | e793s |
Sun Mar 14 11:06:07 2021 |
Faïrouz, Juan Lois | BEAM | General | CD2 | Slits open again. Beam intensity ~4.8e5 pps | |
|
Fixed | e768s |
Thu Aug 1 13:50:30 2019 |
Valerian, Nicolas et Fairouz | OTHER | Hardware | N/A | Single channel time calibration proof of principle | To launch this calib, redo a write hardware
with DAS before.
Then do a ./calibT_SingleChannel in the |
 |
Fixed | e768s |
Thu Aug 1 13:59:30 2019 |
Valerian, Nicolas et Fairouz | OTHER | Hardware | N/A | Single channel time calibration proof of principle | To launch this calib, redo a write hardware
with DAS before.
|
  |