Fixede744s Wed Apr 10 09:06:16 2019 AdrienOFFLINEGeneralN/AStrange size of Time Calibrator RunThe two run for MUVI 1 are larger than the
run for MUVI2 and 3.
  
Fixede768s Mon Jul 22 05:16:22 2019 Faïrouz & SylvainRUNGeneralLiFStop run 121 because problems of AGATA trigger validation The run 121 has to be stopped because problems
of AGATA trigger validation due to very high
request rate of AGATA >=85K 
  
FixedTEST Wed Feb 3 16:42:41 2021 FrancoGRITGeneral3-alphaStatus of the set-up (February 3rd 2021)We re-mounted the annular, put the source
and cooled down to 0 deg. Voltages and spectra
are attached.
 Voltages_03022021.pngMM_raw_03022021.pngMG_X_raw_03022021.pngMG_Y_raw_03022021.png 
FixedTEST Thu Mar 28 15:39:01 2019 ValerianOFFLINESoftwareN/AStatus of the converion with VAMOS programThe conversion with VAMOS program was validated
using run_0020 from com2019
  
FixedTEST Thu Jan 23 14:06:51 2020 Franco&MarlèneGRITHardware3-alphaStatus of detectors on 23-01-20Short alpha source run (not saved on disk)
to test the detectors.
 6x 
FixedTEST Wed Jan 16 16:33:28 2019 MarlèneGRITGeneral3-alphaStatus of detectors on 16/01/19MG1 has some issue with the HT cable (for
the BT bias). There is a shortcut only under
vacuum. We checked the connector but we have
 Detectors_status_160119.xlsxCapture_d’eÌcran_2019-01-16_aÌ€_17.05.57.png 
Fixed  Mon Jul 22 12:33:17 2019 KseniiaAGATAGeneral Stats on 19NeFull stats for runs 112..124 with the event-by-event
Doppler correction. So, we see 4140 kev.
Also, the betas of all the 19Ne with Q= 9,10
 runs112-124-ebe.pngrun112-124-ebe.pngbeta19Ne.png 
Fixede768s Mon Jul 22 05:19:36 2019 Faïrouz & SylvainRUNGeneralLiFStart new run 122Start new run 122. AGATA validation was recovered.

BUT the AGATA request rate is increasing
 Beam-profile-run121-04h51.jpg 
Fixede744s Thu Apr 18 17:45:45 2019 ValerianOTHERHardwareN/AStart heating and stopping Voltage + Acq HV+BT are off and heating is started for Arnaud
to open the chamber
  
Fixed  Tue Jan 22 11:15:15 2019 MarlèneGRITGeneralN/ASquare detectorsMG9C (thin square detector coupled with thick
square detector unplugged) noisy
On X channels --> no noise problem ( about
 MG9C_disabled_channels__no_crazy_ORD.pngMG9C_disabled_channels__no_crazy_ORD_moredetailed.pngMG9C_piedestal_of_disabled_channels_Y.png 
Fixede744s Mon Apr 15 17:17:57 2019 Beyhan +...OTHERGeneral Spreadsheet with a list of runs up to 130   runs_list.ods 
Fixede744s Sat Apr 13 19:27:16 2019 Beyhan, JaromirOTHERGeneralN/ASpreadsheet with a list of runs up to 122 Resides also in home directory
runs_list.ods
 runs_list.odsruns_list.odsruns_list.odsruns_list.odsruns_list.ods 
Fixede768s Thu Jul 25 03:58:19 2019 François et GilbertRUNGeneralLiFSpectra Run 135 25/07/19 4:00Second snapshot of run 135
Spectra refreshed
 6x 
Fixede768s Wed Jul 24 22:10:04 2019 Chloé, YorickONLINEGeneralLiFSpectra Run 135 24/07/19 22:00   6x 
Pendinge793s Mon Mar 15 00:21:18 2021 Sarah, Louis, CharlieBEAMGeneralCD2Source is running outThe beam intensity spiked to 9x10^9, so Louis
called PCP to ask them to reduce it. He was
told that the source was almost depleted,
 run62_Scaler_Mar14_00h40.png 
Fixed  Thu Jul 11 11:40:18 2019 Marlène & FrancoOTHERHardware Some changes in the electronic scheme - We checked the TACs with a time calibrator,
all of them are working. Maybe to check the
ADCs if some timings are not there during
  
Fixede793s Sun Mar 14 14:26:29 2021 Faïrouz, Juan LoisRUNGeneralCD2Snapshots 14:20   8x 
Fixede793s Sun Mar 14 11:06:07 2021 Faïrouz, Juan LoisBEAMGeneralCD2Slits open again. Beam intensity ~4.8e5 pps   run62_Scaler_graph_11h07.png 
Fixede768s Thu Aug 1 13:50:30 2019 Valerian, Nicolas et FairouzOTHERHardwareN/ASingle channel time calibration proof of principleTo launch this calib, redo a write hardware
with DAS before.
Then do a  ./calibT_SingleChannel in the
 ProofOfPrincipleM2.pngProofOfPrincipleTAC.png 
Fixede768s Thu Aug 1 13:59:30 2019 Valerian, Nicolas et FairouzOTHERHardwareN/ASingle channel time calibration proof of principleTo launch this calib, redo a write hardware
with DAS before.