MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 132 of 132  Not logged in MUGAST
Status ExpNbr Date Authordown Type Category Target-Source Subject Text Attachments
Fixede793s Sun Mar 14 15:20:47 2021 AdrienOFFLINEGeneralCD2Updated Angular distribution macroThe angular distribution macro has been updated
and now produce TWOFNR calculation on the
fly.
  
Fixede793s Thu Mar 11 01:24:47 2021 Ablaihan, LouisRUNGeneralCD2run 53 screenshotsScreenshots of the run 53
Beam intensity is ~ 7.4 10^5 pps in CATS
and 5.3 10^5 in VAMOS
 16x 
Fixede793s Thu Mar 11 02:50:14 2021 Ablaihan, LouisBEAMGeneralCD2VAMOS transmition at 2h50 beam intensity reached 1.1x10^6 pps
in CATS for 6.5x10^5 pps in VAMOS. The transmition
decreased to 60% without any shift of the
  
Fixede793s Thu Mar 11 04:38:31 2021 Ablaihan, LouisBEAMGeneralCD2Beam stopped due to a equipment tripped in CSS1Beam stopped 4h30 due to a equipment tripped
in CSS1. They are going to fix it. Estimated
timing of the intervention ~10/20min.
 Scaler_run53_4h30.png 
Fixede793s Thu Mar 11 05:12:36 2021 Ablaihan, LouisRUNGeneralCD2run 53 new screenshots   run53_1_MMMG_T.pngrun53_1_MM_Impact.pngrun53_1_MG_impact.png 
Fixed  Tue Apr 16 12:18:46 2019 AGATAAGATAHardware ATC4 - position 13 HV tripped- HV tripped around 12h10.
- need access to check the origin
  
Fixed  Tue Apr 16 13:15:48 2019 AGATAAGATAHardware ATC4 - position 13 HV tripped
set 1500 V at 13h15
  
Fixed  Wed Apr 17 11:25:29 2019 AGATAAGATAGeneral AGATA background in Coinc with MUST2 with 14O beamhttps://lxagata0.ganil.fr:8989/e744/56
http://run-control:8989/e744/56
  
Pinnede744s Wed Apr 10 11:57:37 2019 A. LemassonOFFLINESoftware VAMOS Conversion HowTo
[B]HOW TO convert a run in VAMOS[/B] 
[LIST]
  
Fixede744s Thu Apr 11 00:06:50 2019 A. LemassonRUNGeneralN/ARun58Without Finger 21 kHz -> Reduced to 800 Hz
with finger
 XfTFFinger.pngrun58_Brho_Cats2_14N.png 
Fixede744s Sun Apr 14 15:05:06 2019 A. LemassonVAMOSHardware Change of Offset in DC Numexo[LIST]
[*] Increasing offset to minimize saturation.
 DC_NUMEXO_AfterChange.pngDC_NUMEXO_BeforeChnage.png 
Fixede744s Mon Apr 15 12:33:52 2019 A. LemassonVAMOSHardware Test Run 127 : Change if IC ShapingTry to change IC Shaping to solve the pb of
Continuous Line in IC0 vs IC1
Change Shaping on all IC during run 126 Change
 IC_Threshold_BeforeChange_run126.pngIC_Decay_BeforeChange_run127.pngIC_CHange_Shaping__run127.pngIC_Shaping_Restore_run127.png 
Fixede744s Mon Apr 15 15:18:55 2019 A. LemassonVAMOSHardware Optimization of IC ShapingDuring Run 129,
1) investigation of the trapezoidal filter
of IC
 IC_Shapingafter_run129.png 
Fixede786s Tue Jun 25 15:33:40 2019 A LemassonVAMOSGeneral VAMOS Analysis - BrhoVAMOS Analysis : 
VAMOS PID with attached SetAlias.C
 8x 
Fixede744s Thu Apr 11 00:23:21 2019 Iulian François MarlèneRUNHardwareCH2TAC changes & targetWe have inserted the 2nd target CH2 104 um.

We have changed the range of the TAC MUGAST-HF
  
   Mon Apr 15 04:34:00 2019          

ELOG Home Page