MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 132 of 132  Not logged in MUGAST
Fixed, e793s, Sun Mar 14 15:20:47 2021, Adrien, OFFLINE, General, CD2, Updated Angular distribution macro 
The angular distribution macro has been updated and now produce TWOFNR calculation on the fly.
Feel free to add new plots and play around with the parameter.
 MakePlot will produce the distribution using Ex and sigmaEx of the state and Eg and sigmaG of the gamma. Efficiency is automatically taken into account
Fixed, e793s, Thu Mar 11 01:24:47 2021, Ablaihan, Louis, RUN, General, CD2, run 53 screenshots 16x
Screenshots of the run 53
Beam intensity is ~ 7.4 10^5 pps in CATS and 5.3 10^5 in VAMOS
~75% transmition
Fixed, e793s, Thu Mar 11 02:50:14 2021, Ablaihan, Louis, BEAM, General, CD2, VAMOS transmition  
at 2h50 beam intensity reached 1.1x10^6 pps in CATS for 6.5x10^5 pps in VAMOS. The transmition decreased to 60% without any shift of the beam position.
Does it come from a loss of efficiency of VAMOS at high counting rate?
Fixed, e793s, Thu Mar 11 04:38:31 2021, Ablaihan, Louis, BEAM, General, CD2, Beam stopped due to a equipment tripped in CSS1 Scaler_run53_4h30.png
Beam stopped 4h30 due to a equipment tripped in CSS1. They are going to fix it. Estimated timing of the intervention ~10/20min.
Beam went back at 4h52 at 3.5x10^5 pps in CATS and 3.0x10^5 pps in VAMOS. transmision ~ 85%
Fixed, e793s, Thu Mar 11 05:12:36 2021, Ablaihan, Louis, RUN, General, CD2, run 53 new screenshots run53_1_MMMG_T.pngrun53_1_MM_Impact.pngrun53_1_MG_impact.png
 
Fixed, , Tue Apr 16 12:18:46 2019, AGATA, AGATA, Hardware, , ATC4 - position 13 HV tripped 
- HV tripped around 12h10.
- need access to check the origin
    Fixed, , Tue Apr 16 13:15:48 2019, AGATA, AGATA, Hardware, , ATC4 - position 13 HV tripped 

set 1500 V at 13h15
Fixed, , Wed Apr 17 11:25:29 2019, AGATA, AGATA, General, , AGATA background in Coinc with MUST2 with 14O beam 
https://lxagata0.ganil.fr:8989/e744/56
http://run-control:8989/e744/56
Pinned, e744s, Wed Apr 10 11:57:37 2019, A. Lemasson, OFFLINE, Software, , VAMOS Conversion HowTo 

[B]HOW TO convert a run in VAMOS[/B] 
[LIST]
    Fixed, e744s, Thu Apr 11 00:06:50 2019, A. Lemasson, RUN, General, N/A, Run58 XfTFFinger.pngrun58_Brho_Cats2_14N.png
Without Finger 21 kHz -> Reduced to 800 Hz with finger
Fixed, e744s, Sun Apr 14 15:05:06 2019, A. Lemasson, VAMOS, Hardware, , Change of Offset in DC Numexo DC_NUMEXO_AfterChange.pngDC_NUMEXO_BeforeChnage.png
[LIST]
[*] Increasing offset to minimize saturation. 
[*] Reducing DC Threholds 
Fixed, e744s, Mon Apr 15 12:33:52 2019, A. Lemasson, VAMOS, Hardware, , Test Run 127 : Change if IC Shaping IC_Threshold_BeforeChange_run126.pngIC_Decay_BeforeChange_run127.pngIC_CHange_Shaping__run127.pngIC_Shaping_Restore_run127.png
Try to change IC Shaping to solve the pb of Continuous Line in IC0 vs IC1
Change Shaping on all IC during run 126 Change Chan 5-12 from Filter B (3us) to Filter A (1us)
Regarding The line IC0 vs IC1 : 
Fixed, e744s, Mon Apr 15 15:18:55 2019, A. Lemasson, VAMOS, Hardware, , Optimization of IC Shaping IC_Shapingafter_run129.png
During Run 129,
1) investigation of the trapezoidal filter of IC
2) The Conclusion is that if we reduce the shaping to 2.5 us we reduce the random line in IC vs IC  (At 1e5 in VAMOS : Random Line / Peak is 18.5 % compared
Fixed, e786s, Tue Jun 25 15:33:40 2019, A Lemasson, VAMOS, General, , VAMOS Analysis - Brho 8x
VAMOS Analysis : 
VAMOS PID with attached SetAlias.C
Fixed, e744s, Thu Apr 11 00:23:21 2019, Iulian François Marlène, RUN, Hardware, CH2, TAC changes & target 
We have inserted the 2nd target CH2 104 um.

We have changed the range of the TAC MUGAST-HF from 1us to 200ns.
, , Mon Apr 15 04:34:00 2019, , , , ,  
 

ELOG Home Page