MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 129 of 132  Not logged in MUGAST
Fixed, e768s, Mon Jul 29 01:27:59 2019, Jenn, BEAM, General, LiF, Beam intensity and profile check photo_2019-07-29_00-27-36.jpg
Fixed, e768s, Mon Jul 22 04:15:53 2019, Faïrouz & Sylvain, RUN, General, LiF, Beam intensity & profile & scalers Beam-profile-run121-04h05.jpgScaler-run121-04h05.jpg
Fixed, e786s, Mon Jun 24 12:06:17 2019, mugast, OFFLINE, General, N/A, Beam energy loss Kinepp.png
Fixed, e793s, Thu Mar 11 15:48:14 2021, mugast, OFFLINE, General, N/A, Beam energy and Beta 
Fixed, e793s, Tue Mar 16 08:39:46 2021, Sarah, Chloé, Ablaihan, BEAM, General, CD2, Beam dropped due to electric defect. @ 08h40 back @ 8h45 
Fixed, e744s, Sun Apr 14 23:23:51 2019, Giuseppe, Mariluz, Jenn, Serge, Nishu, Didier, Simon, BEAM, Hardware, CH2, Beam down 
Pending, e793s, Wed Mar 10 20:36:19 2021, Nigel, BEAM, General, CD2, Beam centering - MUST2 hit pattern Screenshot_from_2021-03-10_20-32-43.png
Fixed, e768s, Tue Jul 30 04:04:27 2019, Jenn & Franco, RUN, General, LiF, Beam back at 4.00 h scaler_5.pngIMG_20190730_040124.jpg
    Fixed, e768s, Tue Jul 30 04:40:18 2019, Jenn & Franco & Teodora, RUN, General, LiF, Beam back at 4.00 h scaler_6.pngIMG-20190730-WA0000.jpg
Fixed, e744s, Tue Apr 16 18:28:27 2019, Faïrouz & marlène, RUN, General, Carbon, Beam back at 18:28 
Fixed, e793s, Mon Mar 15 11:36:37 2021, Taras, cyril, Léo, ONLINE, General, CD2, Beam back at 11h32 Screenshot_from_2021-03-15_11-37-27.png
Fixed, e786s, Mon Jun 24 21:42:11 2019, mugast, RUN, General, Cryo-3He, Beam and cryo target 
Fixed, e793s, Fri Mar 12 19:15:19 2021, Charlie, Nigel (watched by Wilton), RUN, General, CD2, Beam alignment tuning 
Fixed, e768s, Mon Jul 22 08:23:02 2019, Christian - Bertrand, Sylvain, Frank, Francois, BEAM, General, LiF, Beam adjustment notes 26C24EB9-097B-4078-8E8F-95BB07B0847A.jpeg
Fixed, e744s, Tue Apr 16 14:37:04 2019, Marion, BEAM, General, Carbon, Beam above 1.4*10**4 on cats asked to come down to ~1.1*10**5 
Fixed, e793s, Fri Mar 12 18:42:51 2021, Sarah, Louis, BEAM, General, CD2, Beam Back 
Fixed, e768s, Mon Jul 29 04:38:32 2019, Chloe & Teodora, RUN, General, LiF, Beam Scales_run156_2.png
Pending, , Fri Jul 26 11:25:46 2019, UK refugees, OTHER, General, , Be positive and the experiment will work if we put lead in our pencil bojoonazipwire.jpg
Fixed, e768s, Sat Jul 27 00:18:24 2019, Freddy, Sylvain, S1, Hardware, N/A, Annular detector: Loss of channels 
Fixed, e768s, Sat Jul 27 01:50:28 2019, Freddy, Sylvain, S1, General, N/A, Annular detector degradation 9x

ELOG Home Page