Fixed | e793s |
Sun Mar 14 10:01:36 2021 |
Juan Lois & faïrouz & Adrien | BEAM | Hardware | CD2 | Beam intensity escalated up to 1.6e6 pps | At 9:57 the intensity increased up to 1.6e6
pps and we had to call the pcp to put it
again to the normal values.
|
 |
Fixed | e793s |
Sun Mar 14 11:06:07 2021 |
Faïrouz, Juan Lois | BEAM | General | CD2 | Slits open again. Beam intensity ~4.8e5 pps | |
|
Fixed | e793s |
Sun Mar 14 12:02:10 2021 |
Faïrouz, Juan Lois | RUN | General | CD2 | run62 screenshots at 11h57 (14/03/2021) | |
8x |
Fixed | e793s |
Sun Mar 14 14:26:29 2021 |
Faïrouz, Juan Lois | RUN | General | CD2 | Snapshots 14:20 | |
8x |
Fixed | e793s |
Sun Mar 14 14:52:14 2021 |
Franco | OFFLINE | General | CD2 | Gating above Sn | |
|
Fixed | e793s |
Sun Mar 14 14:57:35 2021 |
Franco | GRIT | General | CD2 | LV & HV of Mugast-MUST2 | For future reference... |
|
Fixed | e793s |
Sun Mar 14 15:20:47 2021 |
Adrien | OFFLINE | General | CD2 | Updated Angular distribution macro | The angular distribution macro has been updated
and now produce TWOFNR calculation on the
fly.
|
|
Fixed | e793s |
Sun Mar 14 15:52:36 2021 |
Faïrouz, Juan Lois, Wilton | RUN | General | CD2 | run62 screenshots at 15h52 (14/03/2021) | |
8x |
Fixed | e793s |
Sun Mar 14 17:16:01 2021 |
Miguel, Wilton, Ablaihan | BEAM | Hardware | CD2 | Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached. | Beam went up to 2x10^6 pps in CATS.
Then it went down to 0 for a couple of minutes |
|
Fixed | e793s |
Sun Mar 14 18:13:28 2021 |
Miguel, Wilton, Nishu, Dieter, Ablaihan | RUN | General | CD2 | run62 screenshots at 18h14 | |
10x |
Fixed | e793s |
Sun Mar 14 20:11:17 2021 |
Miguel, Wilton, Nishu, Dieter, Ablaihan | RUN | General | CD2 | run62 screenshots at 20h00 | Beam progressively down from 5 to 4 10^5.
Went to PCP, they were losing intensity in
the primary beam, from 500 to 400 nA. Working |
10x |
Fixed | e793s |
Sun Mar 14 22:01:04 2021 |
Miguel, Wilton, Ablaihan,nishu | RUN | General | CD2 | summary of run 62@22:00hrs | |
9x |
Pending | e793s |
Mon Mar 15 00:21:18 2021 |
Sarah, Louis, Charlie | BEAM | General | CD2 | Source is running out | The beam intensity spiked to 9x10^9, so Louis
called PCP to ask them to reduce it. He was
told that the source was almost depleted, |
|
Fixed | e793s |
Mon Mar 15 02:08:19 2021 |
mugast | BEAM | General | CD2 | Beam stopped at 2:08 | Beam stopped at 2h08. The PCP want to make
some measurement on the source to get its
statues. Should take about 10 min. |
|
Fixed | e793s |
Mon Mar 15 02:44:06 2021 |
Sarah, Louis, Charlie | RUN | General | CD2 | Beam returned at 02:45 and stabilised by PCP | The PCP team were not able to learn anything
new about the state of the source from their
diagnostic tests, but they told us that they |
|
Fixed | e793s |
Mon Mar 15 03:08:18 2021 |
Sarah, Louis, Charlie | RUN | General | CD2 | Run 62 screenshots at 03h00 | Note that Vigru crashed and had to be reopened,
so the canvases have only been populated
with the data since beam returned at 02h45. |
8x |
Fixed | e793s |
Mon Mar 15 03:37:32 2021 |
Louis | OFFLINE | General | CD2 | Ex vs Eg analysis and C2S | 1) Summary of the the Ex vs Eg analysis with
all the gamma ray identified highlighted
in red. Green line shows the corresponding |
   |
Fixed | e793s |
Mon Mar 15 04:57:32 2021 |
Sarah, Louis, Charlie | RUN | General | CD2 | run 62 screenshots at 04h50 | The beam intensity has been surprisingly high
so far, [URL=https://caeelog.in2p3.fr/MUGAST/6147]considering
the news we were given[/URL] about the source |
8x |
Fixed | e793s |
Mon Mar 15 06:27:54 2021 |
Sarah, Louis, Charlie | BEAM | General | CD2 | Beam lost at 06h25. Returned at 06h30 | Electrostatic equipment from the source tripped.
Should only be a few minutes of interruption.
|
|
Fixed | e793s |
Mon Mar 15 06:59:02 2021 |
Sarah, Louis, Charlie | RUN | General | CD2 | run 62 screenshots at 06h55 | Screenshots attached. Note that the fluctuation
issues have returned after the "electrostatic
trip"(?) but the beam pps remain pretty high. |
8x |