MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 127 of 132  Not logged in MUGAST
Fixed, e768s, Mon Jul 22 19:34:16 2019, Didier & Franco, RUN, General, LiF, Beam intensity and profile check scalers_run126_1.pnga792a9dd-1.jpg
 
Fixed, e768s, Mon Jul 22 23:17:00 2019, Didier & Franco, RUN, General, LiF, Screenshots run 126 @23h00 18x
 
Fixed, e744s, Thu Apr 11 02:36:15 2019, Daniele, Andrea, VAMOS, General, N/A, VAMOS cfg 
[TABLE border="1"]
VAMOS BRO= 0.64050 Phi= 45 Dtrans= 0.66m T-xFoc=7.995m 
|-Objects | Name | Settings | Actual
Fixed, e786s, Fri Jun 28 04:21:48 2019, Daniele Mengoni, RUN, General, Cryo-3He, run 74 18x
screenshots run 74 attached

frequent error message on the FP DC Wi1 --> defqlt. The elog said so, card tripped, but spectra are still present .. puzzling
    Fixed, e744s, Mon Apr 8 14:41:07 2019, Daniele M, OTHER, General, N/A, PACE4 cross check ------ E744s to-do list , proposal and other relevant documents 
Fusion-evaporation calculation cross-check:

angular range [10-40]deg
    Fixed, e744s, Mon Apr 8 15:18:03 2019, Daniele M, OTHER, General, N/A, Br ---- E744s to-do list , proposal and other relevant documents  
[TABLE border="1"]
A|    sigma(mb)|   beta(%)|   Beta% After target|   Br(TM)
|-
    Fixed, e744s, Tue Apr 9 11:40:33 2019, Daniele M, OTHER, General, N/A, 14N PACE4 cross check ------ E744s to-do list , proposal and other relevant documents 
[quote="Daniele M"]Fusion-evaporation calculation in the case of 14N (7.5MeV/u)

angular range [10-40]deg
    Fixed, e744s, Tue Apr 9 17:27:33 2019, Daniele M, OTHER, General, N/A, Br ---- E744s to-do list , proposal and other relevant documents  
Expected fusion evap. gammas based on PACE4 calculations.

20Ne:
Fixed, e786s, Sun Jun 23 09:06:29 2019, Daniele M, VAMOS, General, N/A, VAMOS SETTINGS vamos_setttings.jpg
attached the energy measured in CIME and the calculated VAMOS settings
Fixed, e744s, Mon Apr 15 14:14:30 2019, Damien, Faïrouz, Nikola, Iulian, and all, VAMOS, Hardware, CH2, Vamos efficiency 128_0 
============================================================
          offline/root_vamos/run_0128_0.root
============================================================
Fixed, e744s, Mon Apr 15 12:39:45 2019, Damien, Faïrouz, Nikola, Chloe, VAMOS, Hardware, CH2, Vamos efficiency 126_0 
============================================================
          offline/root_vamos/run_0126_0.root
============================================================
Fixed, e744s, Mon Apr 15 08:03:21 2019, Damien, Faïrouz, Marion, Nikola, Magda, Chloe, VAMOS, Hardware, CH2, Vamos efficiency 125_1 
============================================================
          offline/root_vamos/run_0125_1.root
============================================================
Fixed, e744s, Mon Apr 15 08:04:57 2019, Damien, Faïrouz, Marion, Nikola, Magda, Chloe, VAMOS, Hardware, CH2, Vamos efficiency 125_2 
root [1] .x macros/EffCheck.C 
============================================================
          offline/root_vamos/run_0125_2.root
Fixed, e744s, Mon Apr 15 10:00:01 2019, Damien, Faïrouz, Marion, Nikola, Chloe, VAMOS, Hardware, CH2, Vamos efficiency 125_3 
============================================================
          offline/root_vamos/run_0125_3.root
============================================================
Fixed, e793s, Fri Mar 12 20:43:38 2021, Cyril, Louis, OFFLINE, General, CD2, DWBA DWBA.pngDWBA2.png
DBWA analysis have been performed with TWOFNR, here the comparison with data for the 0, 2 and 4 MeV peaks. 
1p1/2 (black line) and 0f7/2 (red line)
Fixed, com2019, Thu Apr 4 16:18:22 2019, Cyril, OTHER, General, N/A, Level scheme of Oxygen Schem_17O_15O.pdfSchem_16O.pdfList_levels.pdf
List and scheme of level in Oxygen 15,16,17
Fixed, e793s, Wed Mar 17 09:53:38 2021, Cyril, AGATA, Hardware, CD2, Agata issue 
Agata problem has been solved, a valve was closed by mistake.
Beam returned at 9h40.
Fixed, e793s, Wed Mar 17 10:23:44 2021, Cyril, RUN, General, CD2, run 64 screenshots at 10h05 - End of e793s 8x
The beam/acq has been stopped around 10h05. 
Fixed, e768s, Sun Jul 21 11:49:59 2019, Christiqn qnd Didier, RUN, General, LiF, Run 119 screenshots run_119_ICIC_MMETOF.pngrun_119_scaler_grqph.pngrun_119_scalers.png
 
    Fixed, e768s, Sat Jul 20 19:23:37 2019, Christiqn, OFFLINE, General, LiF, Ex in 19F from run 72  

[B]Data: Total integral for peak region around 4 MeV in 19F during run 72:
[/B]

ELOG Home Page