Fixed, e768s, Wed Jul 17 13:55:54 2019, Kseniia et al, MUST2, Hardware, , The silicons are polarised again 
|
The LV and HV cards are now in the spare crate brought from Orsay. The detectors are polarised; network connection not working just yet. The leakage currents
are as follows: |
Fixed, e768s, Thu Jul 18 22:10:58 2019, Jenn, OTHER, General, , Previous Papers    
|
|
Fixed, e768s, Thu Jul 18 22:11:57 2019, Franco, OFFLINE, General, , Identification in Mugast
|
Attached the spectra obtained in Mugast for run_0072_0_agata.root.
The colored ones are obtained simply asking for multiplicity 1, the black points are obtained
asking also for Z=9 (F) and for A=20 in VAMOS with the condition abs(mM_Q2*8-20)<0.5. |
Fixed, e768s, Thu Jul 18 23:42:44 2019, mugast, RUN, General, , run 103 -> Brho scan
|
|
Fixed, e768s, Fri Jul 19 00:03:25 2019, Jenn, BEAM, General, , Brho information 15 Oxygen beam 4.7MeV/u
|
|
Fixed, e768s, Fri Jul 19 00:06:35 2019, Jenn, BEAM, General, , Brho information 15 Oxygen beam 4.7MeV/u
|
|
Fixed, e768s, Fri Jul 19 00:59:20 2019, mugast, RUN, General, , RUN 107 - Reference Target Run
|
Reference Target Run after beam tuning
Brho 0.5854 Tm |
Fixed, e768s, Fri Jul 19 01:02:54 2019, mugast, OTHER, General, , 15O beam parameters
|
Brho manip = Brho after target - 2% = 0.556 Tm
RMN = 2821.476 Gauss
|
Fixed, e768s, Fri Jul 19 01:05:26 2019, mugast, RUN, General, , RUN 108
|
Brho Change to 0.556 Tm
Moving Plate : Final Position +7mm
|
Fixed, e768s, Fri Jul 19 08:09:21 2019, Jenn, Kseniia, OTHER, General, , Overview nightshift run 112
|
Smooth night, everything was working properly.
Checked agata rootfile to see preliminary gammas.
|
Fixed, e768s, Fri Jul 19 15:11:10 2019, mugast, OFFLINE, General, , Procedure for run conversion and analysis
|
Here is the procedure to convert a run with VAMOS and AGATA data and add those data to the Kinematic plot.
Every 4GB there will be a file change, to see if there is a file change type:
|
Fixed, e768s, Fri Jul 19 15:55:38 2019, mugast, RUN, General, , Beam is fluctuating 19x
|
Run 115 stopped at 16h40. |
Fixed, e768s, Fri Jul 19 17:33:21 2019, Nicolas, OTHER, General, , AGATA: what if a crystal status get red
|
1. Go to the AGATA Digitizer: Control tab of the browser
2. Select the detector and crystal, then click 'Select'
3. Click the 'ReSync Current Digitizer Optical Link'
|
Fixed, e768s, Fri Jul 19 17:52:24 2019, Nicolas, OTHER, General, , AGATA: replaying runs
|
1. Go to the AGATA analysis computer, open a terminal and execute the following commands:
> a4
> t e768s
|
Fixed, e768s, Sat Jul 20 01:02:10 2019, Serge & Franco, OTHER, General, , Night shift beam & resync
|
timeline of run 116
00:xx resync Agata #13C
|
Fixed, e768s, Sat Jul 20 05:58:18 2019, Franco, OFFLINE, General, , Time calibration for MG10_X 
|
Attached a tentative time calibration for the square MG10_X from run 89 (to be checked!).
Even applying the calibration the spectrum E_TOF for MG10 (run 115) displays many structures. |
Fixed, e768s, Sat Jul 20 08:01:06 2019, Nikola, ONLINE, General, , screenshots run 116 @ 08h00 22x
|
|
Fixed, e768s, Sat Jul 20 09:20:35 2019, Nikola, ONLINE, General, , screenshots run 116 @ 09h20 22x
|
|
Ongoing, , Sat Jul 20 09:32:02 2019, Kseniia, Christian, Nikola,, OTHER, General, , summary of the morning shift
|
timeline of run 116
09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
|
Fixed, e768s, Sat Jul 20 10:50:01 2019, Nikola, ONLINE, General, , End of run 116 (beam problem) -> screenshots run 116 end @ 10h40 22x
|
1. A monitor of the primary beam failed and the astreinte had to be call (PCP did it).
2. The H2O cold box went in default. The cold water for AGATA digitizer; vamos crates and CTA went up to 25 deg!
|
|