Fixed, e768s, Wed Jul 17 13:55:54 2019, Kseniia et al, MUST2, Hardware, , The silicons are polarised again E860E1DA-73FB-4BF2-8A5D-CBF80580F0AC.jpegD722B2E9-71F2-4C9E-BFB4-4ECEA1B84B45.jpeg
The LV and HV cards are now in the spare crate brought from Orsay. The detectors are polarised; network connection not working just yet. The leakage currents
are as follows:
Fixed, e768s, Thu Jul 18 22:10:58 2019, Jenn, OTHER, General, , Previous Papers  Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdfPhys.Rev.C_2010_Fortune.pdfPhys.Rev.C_2003_Fortune.pdfPhys.Rev.C_1996_Mao.pdfNucl.Phys.A_1996_de_Oliveira.pdf
 
Fixed, e768s, Thu Jul 18 22:11:57 2019, Franco, OFFLINE, General, , Identification in Mugast id_mugast_20Fblackpoints.png
Attached the spectra obtained in Mugast for run_0072_0_agata.root.
The colored ones are obtained simply asking for multiplicity 1, the black points are obtained
asking also for Z=9 (F) and for A=20 in VAMOS with the condition abs(mM_Q2*8-20)<0.5.
Fixed, e768s, Thu Jul 18 23:42:44 2019, mugast, RUN, General, , run 103 -> Brho scan 
 
Fixed, e768s, Fri Jul 19 00:03:25 2019, Jenn, BEAM, General, , Brho information 15 Oxygen beam 4.7MeV/u 
 
Fixed, e768s, Fri Jul 19 00:06:35 2019, Jenn, BEAM, General, , Brho information 15 Oxygen beam 4.7MeV/u New_Doc_2019-07-18_23.58.18_1.pdf
 
Fixed, e768s, Fri Jul 19 00:59:20 2019, mugast, RUN, General, , RUN 107 - Reference Target Run 
Reference Target Run after beam tuning
Brho 0.5854 Tm
Fixed, e768s, Fri Jul 19 01:02:54 2019, mugast, OTHER, General, , 15O beam parameters 
Brho manip = Brho after target - 2% = 0.556 Tm

RMN = 2821.476 Gauss
Fixed, e768s, Fri Jul 19 01:05:26 2019, mugast, RUN, General, , RUN 108  
Brho Change to 0.556 Tm 

Moving Plate : Final Position +7mm
Fixed, e768s, Fri Jul 19 08:09:21 2019, Jenn, Kseniia, OTHER, General, , Overview nightshift run 112 
Smooth night, everything was working properly.
Checked agata rootfile to see preliminary gammas.
Fixed, e768s, Fri Jul 19 15:11:10 2019, mugast, OFFLINE, General, , Procedure for run conversion and analysis 
Here is the procedure to convert a run with VAMOS and AGATA data and add those data to the Kinematic plot.

Every 4GB there will be a file change, to see if there is a file change type:
Fixed, e768s, Fri Jul 19 15:55:38 2019, mugast, RUN, General, , Beam is fluctuating 19x
Run 115 stopped at 16h40.  
Fixed, e768s, Fri Jul 19 17:33:21 2019, Nicolas, OTHER, General, , AGATA: what if a crystal status get red 
1. Go to the AGATA Digitizer: Control tab of the browser
2. Select the detector and crystal, then click 'Select'
3. Click the 'ReSync Current Digitizer Optical Link'
Fixed, e768s, Fri Jul 19 17:52:24 2019, Nicolas, OTHER, General, , AGATA: replaying runs 
1. Go to the AGATA analysis computer, open a terminal and execute the following commands:
> a4
> t e768s
Fixed, e768s, Sat Jul 20 01:02:10 2019, Serge & Franco, OTHER, General, , Night shift beam & resync  
timeline of run 116

00:xx resync Agata #13C
Fixed, e768s, Sat Jul 20 05:58:18 2019, Franco, OFFLINE, General, , Time calibration for MG10_X run_0089_MG10_timecal.pngETOF_MG10_run115.png
Attached a tentative time calibration for the square MG10_X from run 89 (to be checked!).
Even applying the calibration the spectrum E_TOF for MG10 (run 115) displays many structures.
Fixed, e768s, Sat Jul 20 08:01:06 2019, Nikola, ONLINE, General, , screenshots run 116 @ 08h00 22x
 
Fixed, e768s, Sat Jul 20 09:20:35 2019, Nikola, ONLINE, General, , screenshots run 116 @ 09h20 22x
 
Ongoing, , Sat Jul 20 09:32:02 2019, Kseniia, Christian, Nikola,, OTHER, General, , summary of the morning shift 
timeline of run 116

09:15 resync AGATA crustal 13C, AGATA was in back-preassure for ~7 min
Fixed, e768s, Sat Jul 20 10:50:01 2019, Nikola, ONLINE, General, , End of run 116 (beam problem) -> screenshots run 116 end @ 10h40 22x
1. A monitor of the primary beam failed and the astreinte had to be call (PCP did it).

2. The H2O cold box went in default. The cold water for AGATA digitizer; vamos crates and CTA went up to 25 deg!