MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 126 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Sourcedown Subject Text Attachments
Fixede768s Wed Jul 17 13:55:54 2019 Kseniia et alMUST2Hardware The silicons are polarised againThe LV and HV cards are now in the spare crate
brought from Orsay. The detectors are polarised;
network connection not working just yet.
 E860E1DA-73FB-4BF2-8A5D-CBF80580F0AC.jpegD722B2E9-71F2-4C9E-BFB4-4ECEA1B84B45.jpeg 
Fixede768s Thu Jul 18 22:10:58 2019 JennOTHERGeneral Previous Papers    Proceedings_of_the_International_Conference_On_Nuclear_Reactions_Induced_by_Heavy_Ions_1970_Middleton.pdfPhys.Rev.C_2010_Fortune.pdfPhys.Rev.C_2003_Fortune.pdfPhys.Rev.C_1996_Mao.pdfNucl.Phys.A_1996_de_Oliveira.pdf 
Fixede768s Thu Jul 18 22:11:57 2019 FrancoOFFLINEGeneral Identification in MugastAttached the spectra obtained in Mugast for
run_0072_0_agata.root.
The colored ones are obtained simply asking
 id_mugast_20Fblackpoints.png 
Fixede768s Thu Jul 18 23:42:44 2019 mugastRUNGeneral run 103 -> Brho scan    
Fixede768s Fri Jul 19 00:03:25 2019 JennBEAMGeneral Brho information 15 Oxygen beam 4.7MeV/u    
Fixede768s Fri Jul 19 00:06:35 2019 JennBEAMGeneral Brho information 15 Oxygen beam 4.7MeV/u   New_Doc_2019-07-18_23.58.18_1.pdf 
Fixede768s Fri Jul 19 00:59:20 2019 mugastRUNGeneral RUN 107 - Reference Target RunReference Target Run after beam tuning
Brho 0.5854 Tm
  
Fixede768s Fri Jul 19 01:02:54 2019 mugastOTHERGeneral 15O beam parametersBrho manip = Brho after target - 2% = 0.556
Tm
  
Fixede768s Fri Jul 19 01:05:26 2019 mugastRUNGeneral RUN 108 Brho Change to 0.556 Tm 

Moving Plate : Final Position +7mm
  
Fixede768s Fri Jul 19 08:09:21 2019 Jenn, KseniiaOTHERGeneral Overview nightshift run 112Smooth night, everything was working properly.
Checked agata rootfile to see preliminary
gammas.
  
Fixede768s Fri Jul 19 15:11:10 2019 mugastOFFLINEGeneral Procedure for run conversion and analysisHere is the procedure to convert a run with
VAMOS and AGATA data and add those data to
the Kinematic plot.
  
Fixede768s Fri Jul 19 15:55:38 2019 mugastRUNGeneral Beam is fluctuatingRun 115 stopped at 16h40.    19x 
Fixede768s Fri Jul 19 17:33:21 2019 NicolasOTHERGeneral AGATA: what if a crystal status get red1. Go to the AGATA Digitizer: Control tab
of the browser
2. Select the detector and crystal, then
  
Fixede768s Fri Jul 19 17:52:24 2019 NicolasOTHERGeneral AGATA: replaying runs1. Go to the AGATA analysis computer, open
a terminal and execute the following commands:
> a4
  
Fixede768s Sat Jul 20 01:02:10 2019 Serge & FrancoOTHERGeneral Night shift beam & resync timeline of run 116

00:xx resync Agata #13C
  
Fixede768s Sat Jul 20 05:58:18 2019 FrancoOFFLINEGeneral Time calibration for MG10_XAttached a tentative time calibration for
the square MG10_X from run 89 (to be checked!).
Even applying the calibration the spectrum
 run_0089_MG10_timecal.pngETOF_MG10_run115.png 
Fixede768s Sat Jul 20 08:01:06 2019 NikolaONLINEGeneral screenshots run 116 @ 08h00   22x 
Fixede768s Sat Jul 20 09:20:35 2019 NikolaONLINEGeneral screenshots run 116 @ 09h20   22x 
Ongoing  Sat Jul 20 09:32:02 2019 Kseniia, Christian, Nikola,OTHERGeneral summary of the morning shifttimeline of run 116

09:15 resync AGATA crustal 13C, AGATA was
  
Fixede768s Sat Jul 20 10:50:01 2019 NikolaONLINEGeneral End of run 116 (beam problem) -> screenshots run 116 end @ 10h401. A monitor of the primary beam failed and
the astreinte had to be call (PCP did it).
 22x 

ELOG Home Page