MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 125 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Source Subjectdown Text Attachments
Fixede744s Mon Apr 8 15:18:03 2019 Daniele MOTHERGeneralN/ABr ---- E744s to-do list , proposal and other relevant documents [TABLE border="1"]
A|    sigma(mb)|   beta(%)|   Beta% After
target|   Br(TM)
  
Fixede744s Tue Apr 9 17:27:33 2019 Daniele MOTHERGeneralN/ABr ---- E744s to-do list , proposal and other relevant documents Expected fusion evap. gammas based on PACE4
calculations.
  
Fixede744s Sat Apr 13 12:04:56 2019 Adrien MattaOTHERSocialN/ABlow some steam this afternoon (staturday13th)If some of you want to blow some steam this
afternoon Crossfit Caen ( located in Mondeville,
you. Can find them on google map) is organising
  
FixedTEST Tue Feb 18 09:20:51 2020 mugastOTHERGeneralN/ABilan Runs de Calibrations---------
ENERGIE
---------
  
Fixedcom2019 Mon Feb 18 10:41:36 2019 MarleneGRITGeneralN/ABias & current of detectors   bias.png 
Fixed  Mon Jul 22 12:54:25 2019 KseniiaAGATAGeneral Beta vs gamma-ray energy in 19Ne, runs 112-124   betaVSgamma.png 
Fixede768s Mon Jul 29 08:07:05 2019 Faïrouz & AndresRUNGeneralLiFBeam-profile and scalers (run156) @ 8h07   beam-profile-run156.jpgScalers-run156_3.png 
Fixede793s Sun Mar 14 17:16:01 2021 Miguel, Wilton, AblaihanBEAMHardwareCD2Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached.Beam went up to 2x10^6 pps in CATS.

Then it went down to 0 for a couple of minutes
 Screenshot_from_2021-03-14_17-21-50_Beam_is_ok.png 
Fixedcom2019 Tue Apr 9 17:23:27 2019 Adrien, Valerian, Louis et ThomasOFFLINEGeneralCD2Beam was not centered in run 256[SIZE=3]Here is the impact matrix in MUST2
for impact matrix for run 256. Beam is not
centered.[/SIZE]
 BeamIsNotCentered.pngBeamNotCentered244.png 
Fixede744s Sat Apr 13 04:35:43 2019 Mariluz Nikola NicolasBEAMGeneralCH2Beam was back for 10 min, and lost after efficiency problem in CSS2VAMOS and MUGAST spectra were checked after
the beam was back. Everything looks OK (e.g.
similar to previous screenshots)
  
Fixede768s Tue Jul 30 15:47:46 2019 NicolasBEAMGeneral Beam stopped since 11h30vacuum problem in CSS1   
Fixede793s Thu Mar 11 04:38:31 2021 Ablaihan, LouisBEAMGeneralCD2Beam stopped due to a equipment tripped in CSS1Beam stopped 4h30 due to a equipment tripped
in CSS1. They are going to fix it. Estimated
timing of the intervention ~10/20min.
 Scaler_run53_4h30.png 
Fixede793s Mon Mar 15 02:08:19 2021 mugastBEAMGeneralCD2Beam stopped at 2:08Beam stopped at 2h08. The PCP want to make
some measurement on the source to get its
statues. Should take about 10 min.
  
Fixede744s Tue Apr 16 18:03:26 2019 Faïrouz & marlèneRUNGeneralCarbonBeam stopped at 18h00 Arrêt faisceau pour cause de bobine du cyclotron
off
  
Fixede793s Mon Mar 15 10:04:13 2021 Taras, cyril, LéoONLINEGeneralCD2Beam stopped at 10amPCP stopped the beam at around 10am after
an increase in counting rates
 Screenshot_from_2021-03-15_10-03-43.png 
Fixede744s Wed Apr 10 10:15:38 2019 FrançoisBEAMSocial Beam stoppedA problem with the cooling water.
2 UT at least to restart the accelerator
  
Fixede768s Tue Jul 23 13:20:20 2019 mugastRUNGeneralN/ABeam stop for caniculeAt 13.16 the beam was stopped due to the high
temperature.
Bertrand is switching off the magnets of
  
Fixede768s Thu Jul 25 13:39:42 2019 mugastBEAMGeneralLiFBeam stop due to high temperatureA lot of Qpoles power supplies had to be shutdown.

Beam stopped at 13h30.
  
Fixede744s Thu Apr 11 07:30:15 2019 mugastBEAMSocialN/ABeam stopThe beam will be back around 8:30.   
Fixede786s Tue Jun 25 08:23:58 2019 Valerian BEAMGeneralN/ABeam statusCurrently there is no beam since 22h-> Thunder
+ no more 48Ca sample. The sample was out
during the night.
  

ELOG Home Page