Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e744s |
Mon Apr 8 15:18:03 2019 |
Daniele M | OTHER | General | N/A | Br ---- E744s to-do list , proposal and other relevant documents | [TABLE border="1"]
A| sigma(mb)| beta(%)| Beta% After
target| Br(TM)
|
|
Fixed | e744s |
Tue Apr 9 17:27:33 2019 |
Daniele M | OTHER | General | N/A | Br ---- E744s to-do list , proposal and other relevant documents | Expected fusion evap. gammas based on PACE4
calculations.
|
|
Fixed | e744s |
Sat Apr 13 12:04:56 2019 |
Adrien Matta | OTHER | Social | N/A | Blow some steam this afternoon (staturday13th) | If some of you want to blow some steam this
afternoon Crossfit Caen ( located in Mondeville,
you. Can find them on google map) is organising |
|
Fixed | TEST |
Tue Feb 18 09:20:51 2020 |
mugast | OTHER | General | N/A | Bilan Runs de Calibrations | ---------
ENERGIE
---------
|
|
Fixed | com2019 |
Mon Feb 18 10:41:36 2019 |
Marlene | GRIT | General | N/A | Bias & current of detectors | |
|
Fixed | |
Mon Jul 22 12:54:25 2019 |
Kseniia | AGATA | General | | Beta vs gamma-ray energy in 19Ne, runs 112-124 | |
|
Fixed | e768s |
Mon Jul 29 08:07:05 2019 |
Faïrouz & Andres | RUN | General | LiF | Beam-profile and scalers (run156) @ 8h07 | |
 |
Fixed | e793s |
Sun Mar 14 17:16:01 2021 |
Miguel, Wilton, Ablaihan | BEAM | Hardware | CD2 | Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached. | Beam went up to 2x10^6 pps in CATS.
Then it went down to 0 for a couple of minutes |
|
Fixed | com2019 |
Tue Apr 9 17:23:27 2019 |
Adrien, Valerian, Louis et Thomas | OFFLINE | General | CD2 | Beam was not centered in run 256 | [SIZE=3]Here is the impact matrix in MUST2
for impact matrix for run 256. Beam is not
centered.[/SIZE]
|
 |
Fixed | e744s |
Sat Apr 13 04:35:43 2019 |
Mariluz Nikola Nicolas | BEAM | General | CH2 | Beam was back for 10 min, and lost after efficiency problem in CSS2 | VAMOS and MUGAST spectra were checked after
the beam was back. Everything looks OK (e.g.
similar to previous screenshots)
|
|
Fixed | e768s |
Tue Jul 30 15:47:46 2019 |
Nicolas | BEAM | General | | Beam stopped since 11h30 | vacuum problem in CSS1 |
|
Fixed | e793s |
Thu Mar 11 04:38:31 2021 |
Ablaihan, Louis | BEAM | General | CD2 | Beam stopped due to a equipment tripped in CSS1 | Beam stopped 4h30 due to a equipment tripped
in CSS1. They are going to fix it. Estimated
timing of the intervention ~10/20min.
|
|
Fixed | e793s |
Mon Mar 15 02:08:19 2021 |
mugast | BEAM | General | CD2 | Beam stopped at 2:08 | Beam stopped at 2h08. The PCP want to make
some measurement on the source to get its
statues. Should take about 10 min. |
|
Fixed | e744s |
Tue Apr 16 18:03:26 2019 |
Faïrouz & marlène | RUN | General | Carbon | Beam stopped at 18h00 | Arrêt faisceau pour cause de bobine du cyclotron
off |
|
Fixed | e793s |
Mon Mar 15 10:04:13 2021 |
Taras, cyril, Léo | ONLINE | General | CD2 | Beam stopped at 10am | PCP stopped the beam at around 10am after
an increase in counting rates |
|
Fixed | e744s |
Wed Apr 10 10:15:38 2019 |
François | BEAM | Social | | Beam stopped | A problem with the cooling water.
2 UT at least to restart the accelerator |
|
Fixed | e768s |
Tue Jul 23 13:20:20 2019 |
mugast | RUN | General | N/A | Beam stop for canicule | At 13.16 the beam was stopped due to the high
temperature.
Bertrand is switching off the magnets of |
|
Fixed | e768s |
Thu Jul 25 13:39:42 2019 |
mugast | BEAM | General | LiF | Beam stop due to high temperature | A lot of Qpoles power supplies had to be shutdown.
Beam stopped at 13h30. |
|
Fixed | e744s |
Thu Apr 11 07:30:15 2019 |
mugast | BEAM | Social | N/A | Beam stop | The beam will be back around 8:30. |
|
Fixed | e786s |
Tue Jun 25 08:23:58 2019 |
Valerian | BEAM | General | N/A | Beam status | Currently there is no beam since 22h-> Thunder
+ no more 48Ca sample. The sample was out
during the night.
|
|