MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 123 of 132  Not logged in MUGAST
Fixed, e744s, Tue Apr 16 21:06:17 2019, Faïrouz, Julian, Jaromir & Sylvain, RUN, General, CH2, Scalers Run 136 run136_scaler_21h03.png
Fixed, e744s, Tue Apr 16 23:21:48 2019, Faïrouz, Julian, Jaromir & Sylvain, RUN, General, CH2, Log and scalers RUN 136 @23:00 20x
Log and scalers RUN 136 @23:00
Fixed, e793s, Sun Mar 14 15:52:36 2021, Faïrouz, Juan Lois, Wilton, RUN, General, CD2, run62 screenshots at 15h52 (14/03/2021) 8x
Fixed, e793s, Sat Mar 13 02:31:33 2021, Faïrouz, Juan Lois, VAMOS, Hardware, CD2, Vamos tripped @ 2h32 & fixed 
Fixed, e793s, Sat Mar 13 03:50:54 2021, Faïrouz, Juan Lois, RUN, General, CD2, run61 screenshots at 3h44 8x
Pending, e793s, Sat Mar 13 05:11:08 2021, Faïrouz, Juan Lois, AGATA, Software, CD2, Problem with AGATA acquisition started at 4h40 run61-scalers_5h19.png

There is a problem with AGATA Acquisition. All the bars in the global status & control are yellow!!!
This problem started at 4h40.
We called the acquisition astreinte but he doesn't know how to fix the problem.
We called Emmanuel but we got on the answering machine. We will call him again at 7 am.

The count rate of AGATA in the scaler looks ok: ~ 1200
Fixed, e793s, Sat Mar 13 05:33:41 2021, Faïrouz, Juan Lois, RUN, General, CD2, run61 screenshots at 5h30 8x
Fixed, e793s, Sat Mar 13 07:26:40 2021, Faïrouz, Juan Lois, RUN, General, CD2, End of run61 screenshots at 7h20 7x
RUN 61 stopped to let Emmanuel fix the AGATA acquisition problem.
Fixed, e793s, Sat Mar 13 07:29:56 2021, Faïrouz, Juan Lois, AGATA, Software, CD2, AGATA acquisition problem fixed by Emmanuel 
Fixed, e793s, Sat Mar 13 07:31:13 2021, Faïrouz, Juan Lois, RUN, General, CD2, Run 62 scalers run62_scaler_7h20.png
Fixed, e793s, Sun Mar 14 09:53:50 2021, Faïrouz, Juan Lois, RUN, General, CD2, run62 screenshots at 9h54 (14/03/2021) 8x
Fixed, e793s, Sun Mar 14 11:06:07 2021, Faïrouz, Juan Lois, BEAM, General, CD2, Slits open again. Beam intensity ~4.8e5 pps run62_Scaler_graph_11h07.png
Fixed, e793s, Sun Mar 14 12:02:10 2021, Faïrouz, Juan Lois, RUN, General, CD2, run62 screenshots at 11h57 (14/03/2021) 8x
Fixed, e793s, Sun Mar 14 14:26:29 2021, Faïrouz, Juan Lois, RUN, General, CD2, Snapshots 14:20 8x
Fixed, e744s, Sat Apr 13 00:32:09 2019, Faïrouz, Iulian, Antoine & co, BEAM, General, N/A, Tests to understand the broad width (120 mm!!!) of the beam size at the FP of VAMOS 

Test 1: 14O beam on CH2 target (number 2= 105 um) and CATS2 inside:
The beam size in the FP of VAMOS was found of about: 150 mm !!!

Test 2: 14O beam on target with hole (Diameter of the hole=7mm) and CATS2 out
The beam size in the FP of VAMOS was found of about: 3 mm (to be checked with the run 112)

Test3: 14O beam on target with hole (Diameter of the hole=7mm) and CATS2 in
The beam size in the FP of VAMOS was found of about: 20 mm (to be checked with the run 113)

Test4: 14O beam on empty target and CATS2 inside
The beam size in the FP of VAMOS was found of about: 30 mm (to be checked with the run 114)

==> The problem of huge broadening of the beam size in test 1 was not due to straggling in CATS2

Test 5: 14O beam on CH2 target (number 3= 90 um, the same target that was used with 14N beam) and CATS2 inside:
The beam size in the FP of VAMOS was found of about: ~ 30 mm (to be checked with the run 115)
Bingo Happy





===> Target CH2 number 2 (105 um) has big inhomogenity problems or heavy impurities???
Fixed, e793s, Thu Mar 11 17:32:07 2021, Faïrouz, Franco, Sarah, RUN, General, CD2, run 56 screenshots 17h30 8x
Fixed, e793s, Thu Mar 11 20:23:58 2021, Faïrouz, Franco, RUN, General, CD2, run56 screenshots at 20h18 8x
Fixed, e793s, Thu Mar 11 23:30:27 2021, Faïrouz, Franco, RUN, General, CD2, run56 screenshots at 23h20 8x
Fixed, e793s, Thu Mar 11 23:38:02 2021, Faïrouz, Franco, RUN, General, CD2, No beam at 23h35 for a duration of ~1à mn run56_Scalers_23h44.png
The beam operators took the beam at 23h35 for 10 mn.
Fixed, e744s, Sun Apr 14 04:04:33 2019, Faïrouz, Chloé, Sylvain, Damien & Iulia, RUN, General, CH2, Beam is back @ 3e4 pps in CATS run122_1_scalers_v13.png

ELOG Home Page