MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 123 of 127  Not logged in MUGAST
Fixed, e793s, Sun Mar 14 00:12:41 2021, Léo, Serge, Nishu, ONLINE, General, CD2, run62 screenshots at 00h13 10x
 
Fixed, e793s, Sun Mar 14 02:24:22 2021, Léo, Serge, Nishu, ONLINE, General, CD2, run62 screenshots at 02:25 7x
 
Fixed, e793s, Sun Mar 14 03:28:43 2021, Léo, Serge, Nishu, RUN, General, CD2, Beam lost 3:20-5:55 Screenshot_from_2021-03-14_03-30-10.pngrates_14Mar21_06h04.png
we lost the beam at 03:20, source unstable

5:55 beam back
Fixed, e793s, Sun Mar 14 06:25:33 2021, Léo, Serge, Nishu, VAMOS, Hardware, CD2, Vamos tripped @ 06:20 
the dipole tripped and the it had to be reset.(2mn)
Fixed, e793s, Sun Mar 14 07:58:51 2021, Léo, Serge, Nishu, ONLINE, General, CD2, run62 screenshots at 7h50 11x
summary of run#62
Fixed, e793s, Sun Mar 14 09:53:50 2021, Faïrouz, Juan Lois, RUN, General, CD2, run62 screenshots at 9h54 (14/03/2021) 8x
 
Fixed, e793s, Sun Mar 14 10:01:36 2021, Juan Lois & faïrouz & Adrien, BEAM, Hardware, CD2, Beam intensity escalated up to 1.6e6 pps BeanItensityJump_09h57_14_03_21.pngScaler_graph_10h47.png
At 9:57 the intensity increased up to 1.6e6 pps and we had to call the pcp to put it again to the normal values.

It was solved by 10:07 .
Fixed, e793s, Sun Mar 14 11:06:07 2021, Faïrouz, Juan Lois, BEAM, General, CD2, Slits open again. Beam intensity ~4.8e5 pps run62_Scaler_graph_11h07.png
 
Fixed, e793s, Sun Mar 14 12:02:10 2021, Faïrouz, Juan Lois, RUN, General, CD2, run62 screenshots at 11h57 (14/03/2021) 8x
 
Fixed, e793s, Sun Mar 14 14:26:29 2021, Faïrouz, Juan Lois, RUN, General, CD2, Snapshots 14:20 8x
 
Fixed, e793s, Sun Mar 14 14:52:14 2021, Franco, OFFLINE, General, CD2, Gating above Sn Gate_above_Sn.png
 
Fixed, e793s, Sun Mar 14 14:57:35 2021, Franco, GRIT, General, CD2, LV & HV of Mugast-MUST2 LV_HV_MUST2_14032021.png
For future reference...
Fixed, e793s, Sun Mar 14 15:20:47 2021, Adrien, OFFLINE, General, CD2, Updated Angular distribution macro 
The angular distribution macro has been updated and now produce TWOFNR calculation on the fly.
Feel free to add new plots and play around with the parameter.
 MakePlot will produce the distribution using Ex and sigmaEx of the state and Eg and sigmaG of the gamma. Efficiency is automatically taken into account
Fixed, e793s, Sun Mar 14 15:52:36 2021, Faïrouz, Juan Lois, Wilton, RUN, General, CD2, run62 screenshots at 15h52 (14/03/2021) 8x
 
Fixed, e793s, Sun Mar 14 17:16:01 2021, Miguel, Wilton, Ablaihan, BEAM, Hardware, CD2, Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached. Screenshot_from_2021-03-14_17-21-50_Beam_is_ok.png
Beam went up to 2x10^6 pps in CATS.

Then it went down to 0 for a couple of minutes at 17:13.
Fixed, e793s, Sun Mar 14 18:13:28 2021, Miguel, Wilton, Nishu, Dieter, Ablaihan, RUN, General, CD2, run62 screenshots at 18h14 10x
 
Fixed, e793s, Sun Mar 14 20:11:17 2021, Miguel, Wilton, Nishu, Dieter, Ablaihan, RUN, General, CD2, run62 screenshots at 20h00 10x
Beam progressively down from 5 to 4 10^5. Went to PCP, they were losing intensity in the primary beam, from 500 to 400 nA. Working on it (21:30)...
Fixed, e793s, Sun Mar 14 22:01:04 2021, Miguel, Wilton, Ablaihan,nishu, RUN, General, CD2, summary of run 62@22:00hrs 9x
 
Pending, e793s, Mon Mar 15 00:21:18 2021, Sarah, Louis, Charlie, BEAM, General, CD2, Source is running out run62_Scaler_Mar14_00h40.png
The beam intensity spiked to 9x10^9, so Louis called PCP to ask them to reduce it. He was told that the source was almost depleted, and was presented with
two options:
Fixed, e793s, Mon Mar 15 02:08:19 2021, mugast, BEAM, General, CD2, Beam stopped at 2:08 
Beam stopped at 2h08. The PCP want to make some measurement on the source to get its statues. Should take about 10 min.

ELOG Home Page