Fixed, e793s, Sun Mar 14 00:12:41 2021, Léo, Serge, Nishu, ONLINE, General, CD2, run62 screenshots at 00h13 10x
|
|
Fixed, e793s, Sun Mar 14 02:24:22 2021, Léo, Serge, Nishu, ONLINE, General, CD2, run62 screenshots at 02:25 7x
|
|
Fixed, e793s, Sun Mar 14 03:28:43 2021, Léo, Serge, Nishu, RUN, General, CD2, Beam lost 3:20-5:55 
|
we lost the beam at 03:20, source unstable
5:55 beam back
sequence of several problems, access issue, HF that went down...
now we run with 5.3e5 pps in Cats |
Fixed, e793s, Sun Mar 14 06:25:33 2021, Léo, Serge, Nishu, VAMOS, Hardware, CD2, Vamos tripped @ 06:20
|
the dipole tripped and the it had to be reset.(2mn) |
Fixed, e793s, Sun Mar 14 07:58:51 2021, Léo, Serge, Nishu, ONLINE, General, CD2, run62 screenshots at 7h50 11x
|
summary of run#62 |
Fixed, e793s, Sun Mar 14 09:53:50 2021, Faïrouz, Juan Lois, RUN, General, CD2, run62 screenshots at 9h54 (14/03/2021) 8x
|
|
Fixed, e793s, Sun Mar 14 10:01:36 2021, Juan Lois & faïrouz & Adrien, BEAM, Hardware, CD2, Beam intensity escalated up to 1.6e6 pps 
|
At 9:57 the intensity increased up to 1.6e6 pps and we had to call the pcp to put it again to the normal values.
It was solved by 10:07 .
Same incidence happend at 10:17 and then again at 10h30.
The beam operators close little bit the slits to decrease the beam intensity.
The intensity is now 3.e5 pps |
Fixed, e793s, Sun Mar 14 11:06:07 2021, Faïrouz, Juan Lois, BEAM, General, CD2, Slits open again. Beam intensity ~4.8e5 pps
|
|
Fixed, e793s, Sun Mar 14 12:02:10 2021, Faïrouz, Juan Lois, RUN, General, CD2, run62 screenshots at 11h57 (14/03/2021) 8x
|
|
Fixed, e793s, Sun Mar 14 14:26:29 2021, Faïrouz, Juan Lois, RUN, General, CD2, Snapshots 14:20 8x
|
|
Fixed, e793s, Sun Mar 14 14:52:14 2021, Franco, OFFLINE, General, CD2, Gating above Sn
|
|
Fixed, e793s, Sun Mar 14 14:57:35 2021, Franco, GRIT, General, CD2, LV & HV of Mugast-MUST2
|
For future reference... |
Fixed, e793s, Sun Mar 14 15:20:47 2021, Adrien, OFFLINE, General, CD2, Updated Angular distribution macro
|
The angular distribution macro has been updated and now produce TWOFNR calculation on the fly.
Feel free to add new plots and play around with the parameter.
MakePlot will produce the distribution using Ex and sigmaEx of the state and Eg and sigmaG of the gamma. Efficiency is automatically taken into account using the efficiency provided by manu.
FIT will perform the TWOFNR calculation using The energy of the state, l and j of the transferred nucleon and J of the formed states. Once the calculation done, it does the fit to the data and extract the C2S.
I found the number strangely small so I suspect we do something wrong.
To run it:
Open a terminal
$> lpcgrit
$> npp MUGAST
$> cd e793s
$> root AngDist.C |
Fixed, e793s, Sun Mar 14 15:52:36 2021, Faïrouz, Juan Lois, Wilton, RUN, General, CD2, run62 screenshots at 15h52 (14/03/2021) 8x
|
|
Fixed, e793s, Sun Mar 14 17:16:01 2021, Miguel, Wilton, Ablaihan, BEAM, Hardware, CD2, Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached.
|
Beam went up to 2x10^6 pps in CATS.
Then it went down to 0 for a couple of minutes at 17:13.
Now it is ok, screenshot attached. |
Fixed, e793s, Sun Mar 14 18:13:28 2021, Miguel, Wilton, Nishu, Dieter, Ablaihan, RUN, General, CD2, run62 screenshots at 18h14 10x
|
|
Fixed, e793s, Sun Mar 14 20:11:17 2021, Miguel, Wilton, Nishu, Dieter, Ablaihan, RUN, General, CD2, run62 screenshots at 20h00 10x
|
Beam progressively down from 5 to 4 10^5. Went to PCP, they were losing intensity in the primary beam, from 500 to 400 nA. Working on it (21:30)... |
Fixed, e793s, Sun Mar 14 22:01:04 2021, Miguel, Wilton, Ablaihan,nishu, RUN, General, CD2, summary of run 62@22:00hrs 9x
|
|
Pending, e793s, Mon Mar 15 00:21:18 2021, Sarah, Louis, Charlie, BEAM, General, CD2, Source is running out
|
The beam intensity spiked to 9x10^9, so Louis called PCP to ask them to reduce it. He was told that the source was almost depleted, and was presented with two options:
A) Keep pushing the source and run at 5x10^5, but run out completely soon (probably during the night shift)
B) Let the rates slowly drop and open the slits as much as possible, to make the source last longer (perhaps another day). This option is strongly preferred by the PCP team, and is the current plan we are following.
Changing the source would apparently take ~12 hrs. There will be a large meeting of all of the technical staff - including the beam and source experts - tomorrow morning at 09:00, so there may be more information about the best course of action after that.
Wilton was consulted as one of the spokespeople of the experiment, and he approves of this action. |
Fixed, e793s, Mon Mar 15 02:08:19 2021, mugast, BEAM, General, CD2, Beam stopped at 2:08
|
Beam stopped at 2h08. The PCP want to make some measurement on the source to get its statues. Should take about 10 min. |
|