MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 122 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Category Target-Sourcedown Subject Text Attachments
Fixed  Fri Apr 5 19:05:56 2019 Marlène NicolasGRITGeneral Brho beam & 17OBrho of  16O @ 6 MeV/A after 1mg/cm2 = 0.68906
Brho of 17O for g.s. after 1 mg/cm2=0.71065
Brho of 17O @ 871 keV after 1mg/cm2=0.70831
  
Fixedcom2019 Sat Apr 6 02:48:39 2019 Iulian RuxandraRUNSoftware Online Spectra run 256 @2h30 am 06/04 (for reference)The online spectra (for reference)
No timing on Mg3 & Mg4 side X. Those correspond
with the masked channels on the Muvi1
 11x 
Fixedcom2019 Sat Apr 6 02:52:51 2019 Iulian RuxandraRUNSoftware Online Scalers run 256 @2h30 am 06/04 for reference   Run_256_Scaler1.pngRun_256_Scaler2.pngRun_256_Scaler3.pngRun_256_Scaler4.png 
Fixedcom2019 Sat Apr 6 03:22:30 2019 Iulian RuxandraRUNSoftware New Kinematics plots (4h of stats)More statistics on the script written by Adrian
and Valerian (first image)
 Kine256_0-256_3.pdfKine256_0-256_3_comparison.pdfElab_vs_ThetaLab_backward.pdf 
Fixede744s Mon Apr 8 00:41:53 2019 FrancoisOTHERGeneral Predictions for VAMOS plots with 14N and 14O beams   Kineplots.pdf 
Fixed  Mon Apr 8 07:54:53 2019 iulianMUST2Hardware end alpha contamination runProblem M3 EY , moving piedestal... See below
Alfa spectra have changed, no longer continuous
excepting partially MM2.
 bilan_run262_bck_mugast4.pngbilan_run262_bck_mugast3.pngbilan_run262_bck_mugast2.pngbilan_run262_bck_mugast1.png 
Fixed  Mon Apr 8 08:01:04 2019 iulianMUST2Hardware swiching off HV & BT (in that order)switching off HV & BT now :
>lpcgrit
>hvm_print MUST2
 HV_mugast_end1.pngHV_mugast_end2.pngHV_mugast_end3.pngHV_mugast_end4.png 
Fixede744s Mon Apr 8 15:17:28 2019 FrançoisTARGETGeneral E744 Targets
Targets mounted on holder
 20190408_143035.jpg 
Fixede744s Tue Apr 9 18:08:22 2019 Marlène and FrançoisDAQSoftware new inputs in the ADC Mugastnew inputs in the ADC mugast
T_Mugast_HF = input N°2
E_AGATA =  agata 42 = input N°3
  
Fixed  Tue Apr 9 21:47:20 2019 Marlene ValerianGRITGeneral FSC time calibration 9th april eveningSnapshot of FSC calibration just before experiment

The noisy MG detectors are still there but
 FSC_calib_09042019.png 
Fixede744s Wed Apr 10 06:45:53 2019 FrançoisBEAMSocial No beam yet They are about to align the beam from the
cyclotron CIME to the area G1.
  
Fixede744s Wed Apr 10 06:51:35 2019 BeyhanBEAMGeneral 14N7+ beam characteristics and settings at VAMOS   IMG_1552.jpgIMG_1549.jpgIMG_1550.jpgIMG_1553.jpg 
Fixede744s Wed Apr 10 07:15:22 2019 FrançoisBEAMSocial no beam
They aligned the beam up to G1 Pr31 but the
stripper foil was not inserted, so they have
  
Fixede744s Wed Apr 10 09:05:33 2019 FrançoisBEAMSocial No beam in G1 yet.The beam is at the entrance of G1.   
Fixede744s Wed Apr 10 10:15:38 2019 FrançoisBEAMSocial Beam stoppedA problem with the cooling water.
2 UT at least to restart the accelerator
  
Pinnede744s Wed Apr 10 11:57:37 2019 A. LemassonOFFLINESoftware VAMOS Conversion HowTo
[B]HOW TO convert a run in VAMOS[/B] 
[LIST]
  
Fixede744s Thu Apr 11 02:12:42 2019 FrançoisTARGETGeneral Measured target thicknesses
[COLOR=blue]CATS2[/COLOR]
Incident beam 14N7+  Brho 0.79 Tm
  
Fixede744s Thu Apr 11 02:53:20 2019 MarlèneRUNGeneral TAc VAMOS-CATSJust before RUN 68
TAC VAMOS-CATS is now in TAC CATS1-CATS2
in order to check if we see something in
  
Fixede744s Thu Apr 11 02:54:09 2019 mugastRUNGeneral Changing Brho to 0.51 Tm starting run 70    
Fixede744s Thu Apr 11 06:38:12 2019 DiegoVAMOSHardware TACS modification+300 ns of delay in the HF validated signal
that gives the STOP of T_FPMW_HF && T_CATS2_HF.
  

ELOG Home Page