Fixed, , Fri Apr 5 19:05:56 2019, Marlène Nicolas, GRIT, General, , Brho beam & 17O
|
Brho of 16O @ 6 MeV/A after 1mg/cm2 = 0.68906
Brho of 17O for g.s. after 1 mg/cm2=0.71065
Brho of 17O @ 871 keV after 1mg/cm2=0.70831 |
Fixed, com2019, Sat Apr 6 02:48:39 2019, Iulian Ruxandra, RUN, Software, , Online Spectra run 256 @2h30 am 06/04 (for reference) 11x
|
The online spectra (for reference)
No timing on Mg3 & Mg4 side X. Those correspond with the masked channels on the Muvi1 |
Fixed, com2019, Sat Apr 6 02:52:51 2019, Iulian Ruxandra, RUN, Software, , Online Scalers run 256 @2h30 am 06/04 for reference   
|
|
Fixed, com2019, Sat Apr 6 03:22:30 2019, Iulian Ruxandra, RUN, Software, , New Kinematics plots (4h of stats)  
|
More statistics on the script written by Adrian and Valerian (first image)
Second image is a comparison between the excited states produced between 90-130 deg and 130-180 deg. Effects of angular distribution?
|
Fixed, e744s, Mon Apr 8 00:41:53 2019, Francois, OTHER, General, , Predictions for VAMOS plots with 14N and 14O beams
|
|
Fixed, , Mon Apr 8 07:54:53 2019, iulian, MUST2, Hardware, , end alpha contamination run   
|
Problem M3 EY , moving piedestal... See below
Alfa spectra have changed, no longer continuous excepting partially MM2. |
Fixed, , Mon Apr 8 08:01:04 2019, iulian, MUST2, Hardware, , swiching off HV & BT (in that order)   
|
switching off HV & BT now :
>lpcgrit
>hvm_print MUST2
|
Fixed, e744s, Mon Apr 8 15:17:28 2019, François, TARGET, General, , E744 Targets
|
Targets mounted on holder
|
Fixed, e744s, Tue Apr 9 18:08:22 2019, Marlène and François, DAQ, Software, , new inputs in the ADC Mugast
|
new inputs in the ADC mugast
T_Mugast_HF = input N°2
E_AGATA = agata 42 = input N°3
|
Fixed, , Tue Apr 9 21:47:20 2019, Marlene Valerian, GRIT, General, , FSC time calibration 9th april evening
|
Snapshot of FSC calibration just before experiment
The noisy MG detectors are still there but otherwise most of them are OK |
Fixed, e744s, Wed Apr 10 06:45:53 2019, François, BEAM, Social, , No beam yet
|
They are about to align the beam from the cyclotron CIME to the area G1. |
Fixed, e744s, Wed Apr 10 06:51:35 2019, Beyhan, BEAM, General, , 14N7+ beam characteristics and settings at VAMOS   
|
|
Fixed, e744s, Wed Apr 10 07:15:22 2019, François, BEAM, Social, , no beam
|
They aligned the beam up to G1 Pr31 but the stripper foil was not inserted, so they have to start the work again. |
Fixed, e744s, Wed Apr 10 09:05:33 2019, François, BEAM, Social, , No beam in G1 yet.
|
The beam is at the entrance of G1. |
Fixed, e744s, Wed Apr 10 10:15:38 2019, François, BEAM, Social, , Beam stopped
|
A problem with the cooling water.
2 UT at least to restart the accelerator |
Pinned, e744s, Wed Apr 10 11:57:37 2019, A. Lemasson, OFFLINE, Software, , VAMOS Conversion HowTo
|
[B]HOW TO convert a run in VAMOS[/B]
[LIST]
|
Fixed, e744s, Thu Apr 11 02:12:42 2019, François, TARGET, General, , Measured target thicknesses
|
[COLOR=blue]CATS2[/COLOR]
Incident beam 14N7+ Brho 0.79 Tm
|
Fixed, e744s, Thu Apr 11 02:53:20 2019, Marlène, RUN, General, , TAc VAMOS-CATS
|
Just before RUN 68
TAC VAMOS-CATS is now in TAC CATS1-CATS2 in order to check if we see something in the online spectra.
TCATS total delay = 300 + 500 ns=800 ns
|
Fixed, e744s, Thu Apr 11 02:54:09 2019, mugast, RUN, General, , Changing Brho to 0.51 Tm starting run 70
|
|
Fixed, e744s, Thu Apr 11 06:38:12 2019, Diego, VAMOS, Hardware, , TACS modification
|
+300 ns of delay in the HF validated signal that gives the STOP of T_FPMW_HF && T_CATS2_HF.
Range of TAC FPMW_CATS2 increased to 1us. |
|