MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 108 of 132  Not logged in MUGAST
Fixed, e768s, Fri Jul 26 16:06:18 2019, mugast, RUN, General, LiF, Run number 152_1 19x
Fixed, e768s, Fri Jul 26 19:00:15 2019, mugast, ONLINE, General, , Run number 152_2 19x
    Fixed, e768s, Fri Jul 26 19:09:48 2019, Kseniia, AGATA, General, LiF, 135-149 run Gamma analysis gg190_19F_all.png
Gamma-gamma gated on 109-keV transition (and on VAMOS)
Fixed, e768s, Fri Jul 26 19:36:03 2019, Kseniia, AGATA, General, , 19Ne gammas, current full stat 19Ne_112to152part.png
19Ne, VAMOS-identified
All runs from before + runs 151, 152part
Fixed, e768s, Fri Jul 26 19:47:18 2019, Andres & Franco, RUN, General, LiF, Check beam intensity and profile run152 h 19.30 IMG-20190726-WA0020.jpg
Fixed, e768s, Fri Jul 26 23:25:49 2019, mugast, ONLINE, General, LiF, Run number 152_3 19x
Fixed, e768s, Fri Jul 26 23:45:18 2019, Franco, Andres, Daniele, OFFLINE, General, LiF, ExEgamma spectra for 15O from run 112 to 152_0 19Ne_112-152.png
    Fixed, e768s, Fri Jul 26 23:58:08 2019, Andres & Franco, RUN, General, LiF, Check beam intensity and profile run152 h 23.40 IMG-20190726-WA0031.jpg
Fixed, e768s, Sat Jul 27 01:50:28 2019, Freddy, Sylvain, S1, General, N/A, Annular detector degradation 9x
By looking in details to the impact matrix of the annular detector, one can see that more segments than before are missing.

There was a clear degradation between run135 and run140.

HVmonitor summary of leakage current for MG11A:
*Wed Jul 24 21:44:44 2019 ---> 0.2 uA
*Thu Jul 25 06:53:15 2019 ---> 0.6 uA (run135 stop)
*Thu Jul 25 13:23:48 2019 ---> 1.4 uA (during run 140)
*Thu Jul 25 22:25:35 2019 ---> 1.3 uA
*Fri Jul 26 07:26:23 2019 ---> 1.9 uA
*Fri Jul 26 16:27:50 2019 ---> 1.9 uA
*Sat Jul 27 01:29:52 2019 ---> 1.9 uA

Attached is also the output of the HV monitor (~/HV_7.root) where the leakage current increase is visible. I just did not manage to draw it as a function of absolute time because the date stored in the file seems wrong.
Pinned, e768s, Sat Jul 27 04:12:57 2019, Sylvain & Freddy, BEAM, General, LiF, Run 152 - Scaler & screenshot + Beam profile 14x
Fixed, e768s, Sat Jul 27 04:50:45 2019, Freddy, OFFLINE, General, N/A, Scaler summary since r120 scaler_update.png
run 120 - 152

/home/mugast/analysis/scalereader/out/Chain.C
Pinned, e768s, Sat Jul 27 06:47:16 2019, Sylvain & Andrea, OTHER, General, LiF, Water tray of MUGAST air conditioner cooling system is almost full 
During a room inspection it was notice that the water tray used as an output of the fan system which is cooling MUGAST electronic crates is almost full of water. The floor is dry but the we suspect a leakage from the air conditioner. To avoid to flood the floor we took some of the water and put in in the water tray of the fan system located in front of VAMOS.

One would probably need during the day to investigate the origin of this water.
Fixed, e768s, Sat Jul 27 07:02:44 2019, Sylvain & Andrea, ONLINE, General, LiF, Beam profile and scaler 
Fixed, e768s, Sat Jul 27 07:20:33 2019, Sylvain & Andrea, ONLINE, General, LiF, Run 152 : Beam profile and scaler 20x
Fixed, e768s, Sat Jul 27 10:08:38 2019, Faïrouz, Beyhan, Daniele & Nicolas, RUN, General, LiF, Run 152 scalers and beam profile  SCALERS_run152_6.pngBeam-profile-run152.jpg
Fixed, e768s, Sat Jul 27 10:48:56 2019, Faïrouz, Beyhan, Daniele, RUN, General, LiF, Run 154 scalers and beam profile @14h06 Beam-profile-154-1.jpgscaler-run154.png20190727_133807.jpg
Fixed, e768s, Sat Jul 27 10:57:40 2019, OttoRun, RUN, General, LiF, Run153 
*************************
Run : 153
*************************

Start at 2019-07-27 10:56:58.225460

Stable 15O beam @ ~ 1.5e7 pps (profiler)

Brho = 0.556 Tm

target LiF thick number 1

Trigger:
FAG 190
MUGAST 180
VAMOS %10 580
BaF2 %100 119
DT 5%

Stop at 2019-07-27 13:17:43.647334
Stop comment: several VAMOS biases tripped (MW_CATS3 / MW_CATS4)
Fixed, e768s, Sat Jul 27 11:02:13 2019, mugast, ONLINE, General, , figures run 152 18x
Fixed, e768s, Sat Jul 27 13:54:17 2019, OttoRun, RUN, General, LiF, Run154 
========================================
*************************
Run : 154
*************************

Start at 2019-07-27 13:53:22.203550

Stable 15O beam @ ~ 1.5e7 pps (profiler)

Brho = 0.556 Tm

target LiF thick number 1

Trigger:
FAG 190
MUGAST 170
VAMOS %10 477
BaF2 %100 119
DT 5%

Stop at 2019-07-28 03:02:15.435062
Stop comment: No beam. PCP said that they have a problem they need to solve. It can be long, so we decided to stop the run until they come to us.
Fixed, e768s, Sat Jul 27 14:10:49 2019, Fairouz, Beyhan, Daniele, RUN, General, LiF, Beam profile and scaler 154 @ 14h10 Beam-profile-154-1.jpgscaler-run154.png20190727_133807.jpgIMG_3506.jpg
mugast

ELOG Home Page