Fixed, e768s, Fri Jul 26 16:06:18 2019, mugast, RUN, General, LiF, Run number 152_1 19x
|
|
Fixed, e768s, Fri Jul 26 19:00:15 2019, mugast, ONLINE, General, , Run number 152_2 19x
|
|
Fixed, e768s, Fri Jul 26 19:09:48 2019, Kseniia, AGATA, General, LiF, 135-149 run Gamma analysis
|
Gamma-gamma gated on 109-keV transition (and on VAMOS) |
Fixed, e768s, Fri Jul 26 19:36:03 2019, Kseniia, AGATA, General, , 19Ne gammas, current full stat
|
19Ne, VAMOS-identified
All runs from before + runs 151, 152part |
Fixed, e768s, Fri Jul 26 19:47:18 2019, Andres & Franco, RUN, General, LiF, Check beam intensity and profile run152 h 19.30
|
|
Fixed, e768s, Fri Jul 26 23:25:49 2019, mugast, ONLINE, General, LiF, Run number 152_3 19x
|
|
Fixed, e768s, Fri Jul 26 23:45:18 2019, Franco, Andres, Daniele, OFFLINE, General, LiF, ExEgamma spectra for 15O from run 112 to 152_0
|
|
Fixed, e768s, Fri Jul 26 23:58:08 2019, Andres & Franco, RUN, General, LiF, Check beam intensity and profile run152 h 23.40
|
|
Fixed, e768s, Sat Jul 27 01:50:28 2019, Freddy, Sylvain, S1, General, N/A, Annular detector degradation 9x
|
By looking in details to the impact matrix of the annular detector, one can see that more segments than before are missing.
There was a clear degradation between run135 and run140.
|
Pinned, e768s, Sat Jul 27 04:12:57 2019, Sylvain & Freddy, BEAM, General, LiF, Run 152 - Scaler & screenshot + Beam profile 14x
|
|
Fixed, e768s, Sat Jul 27 04:50:45 2019, Freddy, OFFLINE, General, N/A, Scaler summary since r120
|
run 120 - 152
/home/mugast/analysis/scalereader/out/Chain.C |
Pinned, e768s, Sat Jul 27 06:47:16 2019, Sylvain & Andrea, OTHER, General, LiF, Water tray of MUGAST air conditioner cooling system is almost full
|
During a room inspection it was notice that the water tray used as an output of the fan system which is cooling MUGAST electronic crates is almost full
of water. The floor is dry but the we suspect a leakage from the air conditioner. To avoid to flood the floor we took some of the water and put in in the
water tray of the fan system located in front of VAMOS.
|
Fixed, e768s, Sat Jul 27 07:02:44 2019, Sylvain & Andrea, ONLINE, General, LiF, Beam profile and scaler
|
|
Fixed, e768s, Sat Jul 27 07:20:33 2019, Sylvain & Andrea, ONLINE, General, LiF, Run 152 : Beam profile and scaler 20x
|
|
Fixed, e768s, Sat Jul 27 10:08:38 2019, Faïrouz, Beyhan, Daniele & Nicolas, RUN, General, LiF, Run 152 scalers and beam profile 
|
|
Fixed, e768s, Sat Jul 27 10:48:56 2019, Faïrouz, Beyhan, Daniele, RUN, General, LiF, Run 154 scalers and beam profile @14h06  
|
|
Fixed, e768s, Sat Jul 27 10:57:40 2019, OttoRun, RUN, General, LiF, Run153
|
*************************
[SIZE=3][B]Run : 153[/B][/SIZE]
*************************
|
Fixed, e768s, Sat Jul 27 11:02:13 2019, mugast, ONLINE, General, , figures run 152 18x
|
|
Fixed, e768s, Sat Jul 27 13:54:17 2019, OttoRun, RUN, General, LiF, Run154
|
========================================
*************************
[SIZE=3][B]Run : 154[/B][/SIZE]
|
Fixed, e768s, Sat Jul 27 14:10:49 2019, Fairouz, Beyhan, Daniele, RUN, General, LiF, Beam profile and scaler 154 @ 14h10   
|
mugast |
|