Fixed, e768s, Fri Jul 26 13:48:41 2019, Marlène, Faïrouz, Bertrand & Nicolas, BEAM, General, , G1 profiler & VAMOS efficiency
|
Factor of two between the profiler and VAMOS FP determination of incident beam is now understood.
Several effects were at work simultaneously and checked at 2 beam intensities (9e3 pps and 5e4 pps):
|
Fixed, , Sun Jul 21 16:51:30 2019, Marlène, Christian, Ksenia, BEAM, General, , trial of tracking of the implantation of 15O
|
Looking at AGATA count rate, we have seen that the highest counting rate for 511 keV line is seen in the inner ring (0*A clusters).
The outer ring detectors (10B for example) counts 10 times less.
|
Fixed, e768s, Sun Jul 21 16:39:38 2019, Marlène, Antoine, BEAM, General, , IMPORTANT :How to send scalers to PCP
|
Go to PCP
Open a terminal
|
Fixed, e744s, Tue Apr 9 18:08:22 2019, Marlène and François, DAQ, Software, , new inputs in the ADC Mugast
|
new inputs in the ADC mugast
T_Mugast_HF = input N°2
E_AGATA = agata 42 = input N°3
|
Fixed, , Fri Apr 5 19:05:56 2019, Marlène Nicolas, GRIT, General, , Brho beam & 17O
|
Brho of 16O @ 6 MeV/A after 1mg/cm2 = 0.68906
Brho of 17O for g.s. after 1 mg/cm2=0.71065
Brho of 17O @ 871 keV after 1mg/cm2=0.70831 |
Fixed, , Mon Feb 24 22:34:43 2020, Marlène Nicolas, RUN, General, , Screenshots run 126 (target CD2+Au #2 rotated 180 deg) 
|
|
Fixed, e775s, Thu Feb 27 12:35:39 2020, Marlène Nicolas, GRIT, General, , RUN128-137_138 analysis  
|
Kinematic lines for the full statistics up to now
States above E*>7 MeV are cut in the angles >140 because of energy threshold. |
Fixed, e786s, Mon Jun 24 03:52:11 2019, Marlène Matthieu, RUN, General, Cryo-3He, 3He target filled with 700 mb
|
The 3He cryo target is filled with a pressure of 700 mb
The temperature on the target is 5.98K
|
Fixed, TEST, Thu Mar 7 14:02:03 2019, Marlène Iulian, MUST2, General, N/A, test of MUST2 electronics
|
Test with pulser at 20 kHz
The OR of MUVI was scaled down by a factor of 100, to provoke some resets |
Fixed, e744s, Thu Apr 11 05:08:20 2019, Marlène Iulian, RUN, General, CD2, Screenshots from RUN 74 8x
|
RUN 74 with 14N beam and CD2 104um target
First screenshots from MUGAST
|
Fixed, e775s, Sun Mar 1 17:04:43 2020, Marlène François, RUN, General, , Preliminary analysis of runs from 128 up to now (169) 6x
|
Preliminary analysis with all stat up to now. |
Fixed, , Thu Jul 11 11:40:18 2019, Marlène & Franco, OTHER, Hardware, , Some changes in the electronic scheme
|
- We checked the TACs with a time calibrator, all of them are working. Maybe to check the ADCs if some timings are not there during the exp.
- We set the possibility to have MUST2 divided by 100 (on a separate chain) in case of high rate on GMT channel number 7.
|
Fixed, TEST, Tue Dec 3 18:14:45 2019, Marlène & Franco, GRIT, Hardware, , Pulser test of new board
|
The new board that will be installed for MG2 has been tested and validated with a pulser outside of the chamber. |
Fixed, , Wed Jan 22 18:39:54 2020, Marlène & Franco, GRIT, Hardware, , Tests of the new box
|
The new box has been tested together with the new CAEN SY4527 power supply. We connected a laptop with Linux to the power supply by means of an ethernet
cable and communicated with it by opening a browser (http://192.168.0.1, then username: admin and pwd: admin). To control the channels we open a terminal,
go to the folder where we saved the file ChannelsController.jar and run the command: java -jar ChannelsController.jar 192.168.0.1 admin admin
|
Fixed, TEST, Fri Feb 14 10:49:22 2020, Marlène & Franco, RUN, General, 3-alpha, MG11 issues
|
We analyzed the behaviour of the annular. We realized that the 4-peaks behaviour on X was already present last year but only on one sector, now it's on
two sectors. We noticed that there is a correlation between the malfunctioning sectors and the missing strips on Y. Last year there was only a missing
strip on Y, affecting only one sector on X; now 3 strips are missing on Y, affecting 2 sectors on X. We believe that the fact that the boundings are missing |
Fixed, e775s, Tue Feb 25 11:50:16 2020, Marlène & Franco, OFFLINE, General, , PID with gate on T_FPMW_HF 
|
The black points are what remains after putting the condition abs(T_FPMW_HF-13000)<1000, for MG1 and the annular. |
Fixed, TEST, Wed Mar 11 18:12:40 2020, Marlène & Franco, GRIT, Hardware, N/A, Update on Mugast
|
(Probably) final update of the status of the detector before the experiment:
- MG5 does not trigger on Y (no pulser, no alpha source). This can explain why in the last experiment we could not run the time calibration of its Y.
|
Fixed, TEST, Thu Mar 12 10:14:02 2020, Marlène & Franco, GRIT, Hardware, N/A, Debugging the cooling system
|
We realized that the increase of temperature of MG7 and MG9 during run 600 (alpha calibration) was due to the fact that a loop of the cooling system was
not working since the pipes were not properly connected. We re-connected them and switched on the low voltage without making the vacuum just to monitor
the evolution of the temperature.
|
Fixed, TEST, Thu Mar 12 14:47:59 2020, Marlène & Franco, GRIT, Hardware, N/A, Moving MG9 square to MUVI2
|
- Since we are not using MG6 anymore (card burnt), we replaced it with MG9 on slot 3 of MUVI2. MUVI4 is now unused. We changed the actions parameters accordingly.
- We cannot run the time calibration for MG9 because the pulser does not go through neither on X nor on Y. |
Fixed, e793s, Thu Mar 12 14:54:13 2020, Marlène & Franco, GRIT, General, 3-alpha, Run 0601 - alpha source calibration
|
We start the alpha source calibration run with pedestal suppression (except for MG7 and MG9) and cooling at 0 deg.
The HV for MUST2 are in attachment. It is not clear whether they will remain unchanged during the experiment since some currents are high. |
|