Fixed, e768s, Wed Jul 24 12:40:49 2019, OttoRun, RUN, General, LiF, Run128
|
*************************
Run : 128
*************************
Start at 2019-07-24 12:40:32.602728
Test of scalers
Stop at 2019-07-24 12:43:18.414715
Stop comment: |
Fixed, , Wed Jul 24 12:44:55 2019, UK refugees, OTHER, General, , Fire out thanks to de Piffle
|
|
Fixed, e768s, Wed Jul 24 13:33:34 2019, OttoRun, RUN, General, LiF, Run129
|
*************************
Run : 129
*************************
Start at 2019-07-24 13:29:27.436829
Test of scalers
Started with the setting of VAMOS with 15N beam + target. Plate removed.
Stop at 2019-07-24 14:22:17.151753
Stop comment: type your message here |
Fixed, e768s, Wed Jul 24 14:41:09 2019, mugast, RUN, General, N/A, VAMOS divison 30
|
VAMOs division is set to 30 |
Fixed, e768s, Wed Jul 24 14:57:51 2019, OttoRun, RUN, General, LiF, Run130
|
*************************
Run : 130
*************************
Start at 2019-07-24 14:45:43.707908
Test of scalers
Started with the setting of VAMOS with 15N beam + target. Plate removed.
Stop at 2019-07-24 14:57:53.598976
Stop comment: |
Fixed, e768s, Wed Jul 24 15:12:07 2019, OttoRun, RUN, General, LiF, Run132
|
*************************
Run : 132
*************************
Start at 2019-07-24 15:05:21.496150
Test of scalers
Started with the setting of VAMOS with 15N beam + target. Plate removed.
Stop at 2019-07-24 15:53:35.796063
Stop comment: |
Fixed, e768s, Wed Jul 24 16:04:04 2019, OttoRun, RUN, General, LiF, Run133
|
*************************
Run : 133
*************************
Start at 2019-07-24 16:01:41.339572
Stable 15N beam @ ~ 1-2e8 pps
Brho = Tm
target LiF thick number 1
Trigger:
MUGAST
VAMOS %30
BaF2 %100
Stop at 2019-07-24 16:44:55.787916
Stop comment: type your message here |
Fixed, e768s, Wed Jul 24 16:24:18 2019, Nicolas, OTHER, General, , 19Ne / 19F analog connections
|
|
Fixed, e768s, Wed Jul 24 16:51:16 2019, OttoRun, RUN, General, LiF, Run135
|
*************************
Run : 135
*************************
Start at 2019-07-24 16:43:07.051256
Stable 15N beam @ ~ 1-2e8 pps
Brho = 0.64 Tm (ref Brho = central trajectory)
target LiF thick number 1
Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%
Stop at 2019-07-25 07:21:33.253248
Stop comment: End of run 135 |
Fixed, e768s, Wed Jul 24 17:21:27 2019, Diego, OTHER, General, , VAMOS Acceptance with different positions of the beam in the target
|
|
Fixed, e768s, Wed Jul 24 22:10:04 2019, Chloé, Yorick, ONLINE, General, LiF, Spectra Run 135 24/07/19 22:00 6x
|
|
Fixed, e768s, Thu Jul 25 03:58:19 2019, François et Gilbert, RUN, General, LiF, Spectra Run 135 25/07/19 4:00 6x
|
Second snapshot of run 135
Spectra refreshed |
Fixed, e768s, Thu Jul 25 07:00:15 2019, mugast, RUN, General, LiF, Run 135 - stop 6x
|
Qpole 41 lost (Q41). Beam stopped before recovery.
Operator not able to get it back. Will try without waiting on next operator. |
Fixed, e768s, Thu Jul 25 07:23:32 2019, OttoRun, RUN, General, LiF, Run136
|
*************************
Run : 136
*************************
Start at 2019-07-25 07:23:18.946360
Stable 15N beam @ ~ 1-2e8 pps
Brho = 0.64 Tm
target LiF thick number 1
Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%
Stop at 2019-07-25 07:36:30.334491
Stop comment: run 136 empty - Geco blocked |
Fixed, e768s, Thu Jul 25 08:22:30 2019, OttoRun, RUN, General, LiF, Run137
|
*************************
Run : 137
*************************
Start at 2019-07-25 08:21:01.510827
Stable 15N beam @ ~ 1-2e8 pps
Brho = 0.64 Tm
target LiF thick number 1
Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%
Stop at 2019-07-25 08:27:20.083016
Stop comment: stop en astreinte Luc |
Fixed, e768s, Thu Jul 25 08:51:36 2019, OttoRun, RUN, General, LiF, Run138
|
*************************
Run : 138
*************************
Start at 2019-07-25 08:51:28.293968
Stable 15N beam @ ~ 1-2e8 pps
Brho = 0.64 Tm
target LiF thick number 1
Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%
Stop at 2019-07-25 09:38:49.818302
Stop comment: stop adf file prob |
Fixed, e768s, Thu Jul 25 09:47:02 2019, OttoRun, RUN, General, LiF, Run139
|
*************************
Run : 139
*************************
Start at 2019-07-25 09:46:45.733969
Stable 15N beam @ ~ 1-2e8 pps
Brho = 0.64 Tm
target LiF thick number 1
Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%
Stop at 2019-07-25 11:25:01.666042
Stop comment: type your message here |
Fixed, e768s, Thu Jul 25 11:05:18 2019, Francois de Oliveira, OTHER, General, , Previous Papers - alpha-branching ratios for states in the 4-MeV region
|
In the reaction 15N(7Li,t)19F, the ratio between the measured cross sections is R(3/2+/9/2-)>29. We should get the same ratio in 19Ne. In 19Ne, the 3/2+ state decays with Eg=4033 keV (80%), the second with 2632 keV (100%), gamma efficiency = 4% and 5.5%, this gives a ratio between the number of counts measured in the 2632 keV and in the 4033 keV > 29 x 100/80 x 5.5 / 4 ~ 50. |
Fixed, e768s, Thu Jul 25 11:44:00 2019, OttoRun, RUN, General, LiF, Run140 15x
|
*************************
Run : 140
*************************
Start at 2019-07-25 11:43:45.222331
Stable 15N beam @ ~ 1-2e8 pps
Brho = 0.64 Tm
target LiF thick number 1
Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%
Stop at 2019-07-25 13:24:23.295982
Stop comment: beam stopped due to high temperature
Screenshot attached at the end of the run |
Fixed, e768s, Thu Jul 25 12:55:19 2019, mugast, AGATA, General, LiF, Problem Crystal 00A during run 140
|
Problem with crystal 00A at 12h50:
- Very large counting rate 300 k
*Tried a resync as usual but did not work.
* Put in Drain temporarily until issue solved |
|