MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 106 of 132  Not logged in MUGAST
Status ExpNbr Date Author Type Categorydown Target-Source Subject
Fixede768s Wed Jul 24 12:40:49 2019 OttoRunRUNGeneralLiFRun128
*************************
Run : 128
*************************

Start at 2019-07-24 12:40:32.602728

Test of scalers

Stop at 2019-07-24 12:43:18.414715
Stop comment:
Fixed  Wed Jul 24 12:44:55 2019 UK refugeesOTHERGeneral Fire out thanks to de Piffle
Attachment 1: BorisJ_fireman.jpg
BorisJ_fireman.jpg
Fixede768s Wed Jul 24 13:33:34 2019 OttoRunRUNGeneralLiFRun129
*************************
Run : 129
*************************

Start at 2019-07-24 13:29:27.436829

Test of scalers

Started with the setting of VAMOS with 15N beam + target. Plate removed.

Stop at 2019-07-24 14:22:17.151753
Stop comment: type your message here
Fixede768s Wed Jul 24 14:41:09 2019 mugastRUNGeneralN/AVAMOS divison 30
VAMOs division is set to 30
Fixede768s Wed Jul 24 14:57:51 2019 OttoRunRUNGeneralLiFRun130
*************************
Run : 130
*************************

Start at 2019-07-24 14:45:43.707908

Test of scalers

Started with the setting of VAMOS with 15N beam + target. Plate removed.

Stop at 2019-07-24 14:57:53.598976
Stop comment:
Fixede768s Wed Jul 24 15:12:07 2019 OttoRunRUNGeneralLiFRun132
*************************
Run : 132
*************************

Start at 2019-07-24 15:05:21.496150

Test of scalers

Started with the setting of VAMOS with 15N beam + target. Plate removed.

Stop at 2019-07-24 15:53:35.796063
Stop comment:
Fixede768s Wed Jul 24 16:04:04 2019 OttoRunRUNGeneralLiFRun133
*************************
Run : 133
*************************

Start at 2019-07-24 16:01:41.339572

Stable 15N beam @ ~ 1-2e8 pps

Brho = Tm

target LiF thick number 1

Trigger:
MUGAST
VAMOS %30
BaF2 %100

Stop at 2019-07-24 16:44:55.787916
Stop comment: type your message here
Fixede768s Wed Jul 24 16:24:18 2019 NicolasOTHERGeneral 19Ne / 19F analog connections
Attachment 1: ne19_f19_AnalogStates.pdf
ne19_f19_AnalogStates.pdf ne19_f19_AnalogStates.pdf
Fixede768s Wed Jul 24 16:51:16 2019 OttoRunRUNGeneralLiFRun135
*************************
Run : 135
*************************

Start at 2019-07-24 16:43:07.051256

Stable 15N beam @ ~ 1-2e8 pps

Brho = 0.64 Tm (ref Brho = central trajectory)

target LiF thick number 1

Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%

Stop at 2019-07-25 07:21:33.253248
Stop comment: End of run 135
Fixede768s Wed Jul 24 17:21:27 2019 DiegoOTHERGeneral VAMOS Acceptance with different positions of the beam in the target
Attachment 1: VAMOS_acceptance_for_different_positions_at_the_target.png
VAMOS_acceptance_for_different_positions_at_the_target.png
Fixede768s Wed Jul 24 22:10:04 2019 Chloé, YorickONLINEGeneralLiFSpectra Run 135 24/07/19 22:00
Attachment 1: MG_ETOF_run135.png
MG_ETOF_run135.png
Attachment 2: MM_deE_run135.png
MM_deE_run135.png
Attachment 3: MM_ETOF_run135.png
MM_ETOF_run135.png
Attachment 4: MGimpact_run135.png
MGimpact_run135.png
Attachment 5: MMimpact_run135.png
MMimpact_run135.png
Attachment 6: Scalers-run135.png
Scalers-run135.png
Fixede768s Thu Jul 25 03:58:19 2019 François et GilbertRUNGeneralLiFSpectra Run 135 25/07/19 4:00
Second snapshot of run 135
Spectra refreshed
Attachment 1: Scalers_run135b
Attachment 2: MG_TOF_run135b
Attachment 3: MM_deE_run135b
Attachment 4: MM_ETOF_run135b
Attachment 5: MG_IMPACT_run135b
Attachment 6: MG_ETOF_run135b
Fixede768s Thu Jul 25 07:00:15 2019 mugastRUNGeneralLiFRun 135 - stop
Qpole 41 lost (Q41). Beam stopped before recovery.
Operator not able to get it back. Will try without waiting on next operator.
Attachment 1: Scalers_run135_end
Attachment 2: MG_ETOF_run135_end
Attachment 3: MM_deE_run135_end
Attachment 4: MM_ETOF_run135_end
Attachment 5: MG_Impact_run135_end
Attachment 6: MM_Impact_run135_end
Fixede768s Thu Jul 25 07:23:32 2019 OttoRunRUNGeneralLiFRun136
*************************
Run : 136
*************************

Start at 2019-07-25 07:23:18.946360

Stable 15N beam @ ~ 1-2e8 pps

Brho = 0.64 Tm

target LiF thick number 1

Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%

Stop at 2019-07-25 07:36:30.334491
Stop comment: run 136 empty - Geco blocked
Fixede768s Thu Jul 25 08:22:30 2019 OttoRunRUNGeneralLiFRun137
*************************
Run : 137
*************************

Start at 2019-07-25 08:21:01.510827

Stable 15N beam @ ~ 1-2e8 pps

Brho = 0.64 Tm

target LiF thick number 1

Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%

Stop at 2019-07-25 08:27:20.083016
Stop comment: stop en astreinte Luc
Fixede768s Thu Jul 25 08:51:36 2019 OttoRunRUNGeneralLiFRun138
*************************
Run : 138
*************************

Start at 2019-07-25 08:51:28.293968

Stable 15N beam @ ~ 1-2e8 pps

Brho = 0.64 Tm

target LiF thick number 1

Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%

Stop at 2019-07-25 09:38:49.818302
Stop comment: stop adf file prob
Fixede768s Thu Jul 25 09:47:02 2019 OttoRunRUNGeneralLiFRun139
*************************
Run : 139
*************************

Start at 2019-07-25 09:46:45.733969

Stable 15N beam @ ~ 1-2e8 pps

Brho = 0.64 Tm

target LiF thick number 1

Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%

Stop at 2019-07-25 11:25:01.666042
Stop comment: type your message here
Fixede768s Thu Jul 25 11:05:18 2019 Francois de OliveiraOTHERGeneral Previous Papers - alpha-branching ratios for states in the 4-MeV region
In the reaction 15N(7Li,t)19F, the ratio between the measured cross sections is R(3/2+/9/2-)>29. We should get the same ratio in 19Ne. In 19Ne, the 3/2+ state decays with Eg=4033 keV (80%), the second with 2632 keV (100%), gamma efficiency = 4% and 5.5%, this gives a ratio between the number of counts measured in the 2632 keV and in the 4033 keV > 29 x 100/80 x 5.5 / 4 ~ 50.
Fixede768s Thu Jul 25 11:44:00 2019 OttoRunRUNGeneralLiFRun140
*************************
Run : 140
*************************

Start at 2019-07-25 11:43:45.222331

Stable 15N beam @ ~ 1-2e8 pps

Brho = 0.64 Tm

target LiF thick number 1

Trigger:1100
MUGAST 1500
VAMOS %30 4500
BaF2 %100
DT 20%

Stop at 2019-07-25 13:24:23.295982
Stop comment: beam stopped due to high temperature

Screenshot attached at the end of the run
Attachment 1: Correl.png
Correl.png
Attachment 2: MGraw.png
MGraw.png
Attachment 3: MG_ETOF.png
MG_ETOF.png
Attachment 4: MM_ETOF.png
MM_ETOF.png
Attachment 5: MGimpact.png
MGimpact.png
Attachment 6: DCY.png
DCY.png
Attachment 7: DCX.png
DCX.png
Attachment 8: MMdEE.png
MMdEE.png
Attachment 9: DCXbis.png
DCXbis.png
Attachment 10: ICIC.png
ICIC.png
Attachment 11: REC.png
REC.png
Attachment 12: TAC.png
TAC.png
Attachment 13: IC.png
IC.png
Attachment 14: MWE.png
MWE.png
Attachment 15: DCE.png
DCE.png
Fixede768s Thu Jul 25 12:55:19 2019 mugastAGATAGeneralLiFProblem Crystal 00A during run 140
Problem with crystal 00A at 12h50:
- Very large counting rate 300 k

*Tried a resync as usual but did not work.
* Put in Drain temporarily until issue solved

ELOG Home Page