Fixed, e768s, Fri Jul 19 01:02:54 2019, mugast, OTHER, General, , 15O beam parameters
|
Brho manip = Brho after target - 2% = 0.556 Tm
RMN = 2821.476 Gauss
|
Fixed, e768s, Fri Jul 19 01:05:26 2019, mugast, RUN, General, , RUN 108
|
Brho Change to 0.556 Tm
Moving Plate : Final Position +7mm
|
Fixed, e768s, Fri Jul 19 01:32:17 2019, OttoRun, RUN, General, LiF, Run107
|
*************************
[SIZE=3][B]Run : 107[/B][/SIZE]
*************************
|
Fixed, e768s, Fri Jul 19 01:32:20 2019, OttoRun, RUN, General, LiF, Run108
|
*************************
[SIZE=3][B]Run : 108[/B][/SIZE]
*************************
|
Fixed, e768s, Fri Jul 19 02:19:51 2019, OttoRun, RUN, General, LiF, Run110
|
*************************
[SIZE=3][B]Run : 110[/B][/SIZE]
*************************
|
Fixed, e768s, Fri Jul 19 02:22:12 2019, OttoRun, RUN, General, LiF, Run111
|
*************************
[SIZE=3][B]Run : 111[/B][/SIZE]
*************************
|
Fixed, e768s, Fri Jul 19 02:27:22 2019, OttoRun, RUN, General, LiF, Run112
|
*************************
[SIZE=3][B]Run : 112[/B][/SIZE]
*************************
|
Fixed, e768s, Fri Jul 19 03:29:58 2019, Jenn, ONLINE, General, LiF, Screenshots run 112 overnight 16x
|
MUGAST and VAMOS screenshots run 112 |
Fixed, e768s, Fri Jul 19 08:09:21 2019, Jenn, Kseniia, OTHER, General, , Overview nightshift run 112
|
Smooth night, everything was working properly.
Checked agata rootfile to see preliminary gammas.
|
Fixed, e768s, Fri Jul 19 09:32:45 2019, mugast, BEAM, General, LiF, Beam is fluctuating
|
There was a temporary beam loss during the run 113 |
Fixed, e768s, Fri Jul 19 09:38:05 2019, mugast, GRIT, General, LiF, Impact matrix for MUGAST
|
|
Fixed, e768s, Fri Jul 19 10:35:05 2019, OttoRun, RUN, General, LiF, Run113
|
*************************
[SIZE=3][B]Run : 113[/B][/SIZE]
*************************
|
Fixed, , Fri Jul 19 11:46:51 2019, iulian, OFFLINE, General, LiF, Offline 112   
|
Egamma vs M/Q*9 to check who is 19Ne
Ex in 19Ne all Mugast
Ex vs Egamma for 19Ne
|
Fixed, e768s, Fri Jul 19 12:06:44 2019, OttoRun, RUN, General, LiF, Run115 17x
|
*************************
[SIZE=3][B]Run : 115[/B][/SIZE]
*************************
|
Fixed, e768s, Fri Jul 19 13:09:14 2019, mugast, BEAM, General, LiF, Counting rates as a function of beam intensity
|
checking counting rates as a function of increasing beam intensity |
Fixed, e768s, Fri Jul 19 13:24:01 2019, mugast, OFFLINE, General, LiF, g-ray spectrum (run 112) requiring 19Ne in VAMOS
|
|
Fixed, e768s, Fri Jul 19 15:11:10 2019, mugast, OFFLINE, General, , Procedure for run conversion and analysis
|
Here is the procedure to convert a run with VAMOS and AGATA data and add those data to the Kinematic plot.
Every 4GB there will be a file change, to see if there is a file change type:
|
Fixed, e768s, Fri Jul 19 15:15:47 2019, Diego Ramos, OFFLINE, General, LiF, 19Ne identification in VAMOS together with MUGAST
|
|
Fixed, e768s, Fri Jul 19 15:18:38 2019, Diego Ramos, OFFLINE, General, LiF, Position of 19Ne in dE:E in VAMOS
|
Conclusion: IC pressure not needed to be reduced. |
Fixed, e768s, Fri Jul 19 15:55:38 2019, mugast, RUN, General, , Beam is fluctuating 19x
|
Run 115 stopped at 16h40. |
|