MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 9 of 48  Not logged in MUST2
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede755 Sat Jun 23 22:08:43 2018 e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, ValérieRUNGeneralCryo-LH2Run 88-Empty target measurement
CATS beam 1.8 10**5 /s

Run 88 start @ 22h07
empty target
stoped @ 23h27 because of decrease of the beam intensity
==========================================================================================


==========================================================================================
Attachment 1: ScalersRun88at22h08.png
ScalersRun88at22h08.png
Attachment 2: Run88emptyT_Plast.png
Run88emptyT_Plast.png
Attachment 3: Run88emptyT_CATSbeam.png
Run88emptyT_CATSbeam.png
Attachment 4: Run88emptyT_CatsRaw.png
Run88emptyT_CatsRaw.png
Attachment 5: Run88emptyT_MMCsI.png
Run88emptyT_MMCsI.png
Attachment 6: Run88emptyT_MMimpact.png
Run88emptyT_MMimpact.png
Attachment 7: Run88emptyT_MM1to4.png
Run88emptyT_MM1to4.png
Attachment 8: Run88emptyT_MM5to8.png
Run88emptyT_MM5to8.png
Attachment 9: Run88scalersAt22h37.png
Run88scalersAt22h37.png
Attachment 10: Run88NarvalOnRun.png
Run88NarvalOnRun.png
Fixede755 Wed Jun 27 21:13:40 2018 e755 Daisuke, Olivier, edited by ValérieRUNGeneralCryo-emptyConditions for the night runs
TUNING OF 38Ca to be ready during the night, after the change of CO source at the machine between 21h and 2am (maybe).
LISE team: Omar K, Jean-Charles T. Tuning made for 38Ca at 21h for Run 162.

NB the GECO ionization configuration is ok.
Phone call by Antoine at 20h40. he asked to check that there is external trigger to run later at 10**5/s see snapshot GECOIonizationTrigger.png ok.

NB: At 21h05 Daisuke puts back the 30ns delay on the time for the TAC Tcats1 HF, to be ready for the running conditions of 38ca during the night/morning data taking.
Attachment 1: GECOIonizationTrigger.png
GECOIonizationTrigger.png
Fixede755 Thu Jun 28 08:20:54 2018 e755RUNGeneralCryo-LH2Summary Run 165-169
Run 165
  • start: 2h12
  • start: 3h11
  • CATS2 tripped at the end of run

Run 166
  • start: 3h11
  • start: 4h26
  • Observed T_CATS2_HF shift

Run 167
  • start: 4h25
  • start: 5h22
  • beam intensity fluctuations

Run 168
  • start: 5h22
  • start: 6h57

Run 169
  • start: 6h56
  • start: 8h06
  • Very strong drift of T_CATS_HF signals (see attached plot) and even total disappearance. Call the PCP but they said there is no issue on their side. Stopped the run. 5 min Later, all HF related signals are back.....

Attachment 1: run169_tof_cats_hf.png
run169_tof_cats_hf.png
Fixede748 Thu Jul 6 15:24:25 2017 e748-shift UBEAMGeneralCD2Beam stop, end of run 341
The beam was stopped due to vacuum problem at CSS2.
End of run 341 at 15h21.
Fixede748 Wed Jul 5 09:13:17 2017 e748-A. LemassonCHIOHardwareCD2CHIO cathode problems
Thomas and Julien going to D6, the cathode power supply tripped.
Setting it back and we will check signal when beam is sent back.
Fixede748 Sun Jul 9 02:41:49 2017 e748- shift U:Valérie L +Beyhan B.RUNGeneralCD2Run 374 - good beam conditions
The 18O was very stable between 0h and 2h around I ~ 4.5 µA.
CAVIAR ~ 161k; CATS1 ~ 88kcps; CATS2~ 111kcps ; CHIO ~ 106kcps; PLASTIC ~ 105 kcps.
The dead time is between 4 and 7%.
It was slowly decreasing to 3.7µA at 2h45.
Between 2h48 and 3h we see strong fluctuations of the primary beam current I down to 3.7µA and to 0.5µA.
We call the PCP machine, they tell us that they manage to recover the beam, and that there are strong instabilities at the source.
At 3h15 the beam is stable again, around 4.2µA.

Runs e748
e748 Exxx 1000M 8 juil. 23:27 run_0374.dat.08-07-17_16h57m56s.4 8 July START 22h11(cf previous.3) STOP 23h27
e748 Exxx 1000M 9 juil. 00:41 run_0374.dat.08-07-17_16h57m56s.5 8 July START 23h27 STOP 9 July 00h41
e748 Exxx 1000M 9 juil. 01:52 run_0374.dat.08-07-17_16h57m56s.6 9 July START 00h41 STOP 9 July 01:52
e748 Exxx 1000M 9 juil. 03:10 run_0374.dat.08-07-17_16h57m56s.7 9 July START 01:52 STOP 9 July 03:10
..........
-------------------------------------------------------------------------------------
Run e748chio
-rw-r--r-- 1 e748chio Exxx 91M 9 juil. 01:26 run_0374.dat.08-07-17_16h57m54s
Attachment 1: MUST2CsI6CsI7SiLi5SiLi8Run374_2h40.png
MUST2CsI6CsI7SiLi5SiLi8Run374_2h40.png
Attachment 2: ScalersRun374At2h48.png
ScalersRun374At2h48.png
Attachment 3: P2290327BeamAt3h15.JPG
P2290327BeamAt3h15.JPG
Attachment 4: TAC_Run374_At3h34.png
TAC_Run374_At3h34.png
Attachment 5: ReactionMust2Run374At3h40.png
ReactionMust2Run374At3h40.png
Attachment 6: MMmatrix_Run374At3h40.png
MMmatrix_Run374At3h40.png
Attachment 7: Must2ETOF_Run374At3h40.png
Must2ETOF_Run374At3h40.png
Attachment 8: TargetPos_Run374At3h40.png
TargetPos_Run374At3h40.png
Attachment 9: KinematicsMMEThetaRun374At3h40.png
KinematicsMMEThetaRun374At3h40.png
Attachment 10: Run374_correlChIOat4h10.png
Run374_correlChIOat4h10.png
Fixede744 Mon May 28 22:11:52 2018 e748- LouisEXL-PPTHardwareCH2EXL4 trigger excess
During run 2101, Frequency of the EXL4 channel at 478Hz compared to values around 30Hz for other channels
Attachment 1: Scaler_EXLTriggerExeed_Run2101.png
Scaler_EXLTriggerExeed_Run2101.png
Fixede748 Sun Jul 9 04:21:42 2017 e748- Beyhan B + Valérie LBEAMGeneralCD2BEAM SURVEY AT PCP
The beam Survey from the PCP can be seen in the attached picture below.
Our spokesperson Adrien M can go and ask to the PCP at the end of the experiment the data file of the beam intensity histograms.
The plots can be seen in the intranet [The address is: http://intranet.ganil.fr/SDA/suivi_equipements/ ]
Attachment 1: GraphicBeame748july17.jpg
GraphicBeame748july17.jpg
Fixede748 Sun Jul 9 05:21:29 2017 e748 shift U Valérie L. +Beyhan B.(-8h)/ Daisuke Shumpei (8h-)RUNGeneralCD2Run 375 after beam stop
The tuning of the beam alignment was checked by the PCP. cf beam profiles at 5h15 in LISE notebook and below.
We check also the beam profiles on CATS.
The beam was at 4.2 µA increasing to 4.6 µA but we do not recover the same intensity in LISE as during the run 374.
CAVIAR now at 90kcps and CATS2 around 53kcps (at 5h25).
6h50 CAVIAR 95 kcps CATS1: 51 kcps; CATS2: 64 kcps
The transmission to LISE seems to be not as good as before.
The beam on target is de-centered both on X (X +0.4mm) and Y (Y by ~ -2.4mm)
-----------------------------------------------------------------------------------------------
Run 375 start at 5h20

8h24 SiLi T5/1 tripped at 26 µA. Turned the HT on immediately.
8h51 stop data taking to LISE alignment by Jean-Charles. Attachment 10 (CATS) and 11 (MUST2) were taken toward the end of the run.

---
e748
-r--r--r-- 1 e748 Exxx 1000M 9 juil. 07:25 run_0375.dat.09-07-17_05h20m46s
-rw-r--r-- 1 e748 Exxx 806M 9 juil. 08:50 run_0375.dat.09-07-17_05h20m46s.1

e748chio
-r--r--r-- 1 e748chio Exxx 23M 9 juil. 08:50 run_0375.dat.09-07-17_05h20m35s
Attachment 1: ScalersAnalyserRun375At5h24.png
ScalersAnalyserRun375At5h24.png
Attachment 2: CatsStrQRaw_Run375At5h35.png
CatsStrQRaw_Run375At5h35.png
Attachment 3: CATSprofile_Run375At5h35.png
CATSprofile_Run375At5h35.png
Attachment 4: P2290329BeamProfilePCPAt5h15.JPG
P2290329BeamProfilePCPAt5h15.JPG
Attachment 5: Run375_CATSposAt6h20.png
Run375_CATSposAt6h20.png
Attachment 6: Run375_TargetPos_At6h20.png
Run375_TargetPos_At6h20.png
Attachment 7: TargetCATSRun375at6h20shiftY-2mm.png
TargetCATSRun375at6h20shiftY-2mm.png
Attachment 8: Run375_EchioDigET.png
Run375_EchioDigET.png
Attachment 9: ScalersRun375At6h50.png
ScalersRun375At6h50.png
Attachment 10: _run375_cats_pos.png
_run375_cats_pos.png
Attachment 11: run375_must2.png
run375_must2.png
Fixede748 Sun Jul 9 04:43:40 2017 e748 shift U Valérie L. +Beyhan B.RUNGeneralCD2Run 374- 9 JULY - stop at 5h
Between 4h-4h50 the 18O has decreased from 4.5 down to 4 µA.
CAVIAR ~ 161k; CATS1 ~ 90kcps; CATS2~ 114kcps ; CHIO ~ 109kcps; PLASTIC ~ 108 kcps.
The dead time is between 4 and 7%.
The run 374 is stopped at 5h01 because the PCP machine is retuning
the beam intensity. The intensity was strongly decreasing at 4h50 down to 3µA and then below 3µA at 4h55.

-----------------------------------------------------------------------------------------------
e748 Exxx 1000M 9 juil. 03:10 run_0374.dat.08-07-17_16h57m56s.7
e748 Exxx 1000M 9 juil. 04:26 run_0374.dat.08-07-17_16h57m56s.8
e748 Exxx 368M 9 juil. 05:01 run_0374.dat.08-07-17_16h57m56s.9

DAQ Chio
e748chio Exxx 128M 9 juil. 05:00 run_0374.dat.08-07-17_16h57m54s
Attachment 1: ScalersRun374At4h46.png
ScalersRun374At4h46.png
Attachment 2: Run374CatsRawStrQ_4h40.png
Run374CatsRawStrQ_4h40.png
Fixede748 Sat Jul 8 23:51:06 2017 e748 shift U Valérie L. RUNGeneralCD2Overview of run 374 around midnight

Run at 23h48 with stable conditions, 18O beam: 4.5 µA


Caviar 175kcps ; CATS1 98kcps ; CATS2 122kcps; PLAST 116 kcps ; CHIO 117 kcps
e748 runs
-r--r--r-- 1 e748 Exxx 1000M 8 juil. 23:27 run_0374.dat.08-07-17_16h57m56s.4
-rw-r--r-- 1 e748 Exxx 253M 8 juil. 23:47 run_0374.dat.08-07-17_16h57m56s.5
------------------------------------------------------------------------------------------------
e748chio runs
-rw-r--r-- 1 e748chio Exxx 72M 8 juil. 23:48 run_0374.dat.08-07-17_16h57m54s
------------------------------------------------------------------------------------------------
Attachment 1: scalers_run374_21h49.png
scalers_run374_21h49.png
Attachment 2: Run374_ChioDIG_ETat0h.png
Run374_ChioDIG_ETat0h.png
Attachment 3: PlastChioDigETAt0h30_Run374.png
PlastChioDigETAt0h30_Run374.png
Attachment 4: Run374CatsposTrajAt0h30.png
Run374CatsposTrajAt0h30.png
Attachment 5: Run374_CATSstrQrawAt0h35.png
Run374_CATSstrQrawAt0h35.png
Attachment 6: Run374_Must2ImpactKine0h30.png
Run374_Must2ImpactKine0h30.png
Attachment 7: GraphScalerRun374At0h15.png
GraphScalerRun374At0h15.png
Fixede748 Fri Jul 7 16:34:34 2017 e748 shift U Simon G. + Valérie LRUNGeneralCD2Overview of Run 368 - 10Be beam
Run 368 started at 16h30 stop at 18h01 (automatic stop)

Run 368_1 ongoing at 18h41
====== SUMMARY OF THE BEAM CONDITIONS AND OPTICS =====
10Be ~ 90000 cps
18O 4 µA

CAVIAR 1.4 10**5/s ; CATS2 90kcps FAG~ 180-200/s

Final conditions of the LISE settings
FH31 = +/- 20 mm
I=500nA --> 10**5 pps [E = 3kV]
DA_C2 -4A Q68 71.59A Q67 124.51A DAP =197.30A
DA1_Rmn = 1.9603 T.m ; DA2_Rmn = 1.9598 T.m
Brho1_Rmn =2.2621 T.m ; D3P1 400.08 A
Brho2_Rmn = 1.9899 T.m ; D3P 457.80 A

RUNS : G3 DAP I= 197.30A ; DAC2 I =-3A
======================= Summary of detectors ======================================
MUST2
Sili1-t5 380V ; Sili2-t5 700V
SiLi1-t8 700V ; Sili2-t8 650V
CATS1 700V ; CATS2 700V
CHIO Cathode -2900V ; Grille (voie B sur l'alim en D6) 920V


==========================================================================================
/data/e748X/e748/acquisition/run
-r--r--r-- 1 e748 Exxx 1000M 7 juil. 18:01 run_0368.dat.07-07-17_16h31m32s
-rw-r--r-- 1 e748 Exxx 401M 7 juil. 18:38 run_0368.dat.07-07-17_16h31m32s.1
/data/e748chioX/e748chio/acquisition/run
-rw-r--r-- 1 e748chio Exxx 167K 7 juil. 16:33 run_0368.dat.07-07-17_16h30m17s
Attachment 1: Scalers_Run368.png
Scalers_Run368.png
Attachment 2: Run368sampleChioET.png
Run368sampleChioET.png
Attachment 3: Run368_CATSrawQ.png
Run368_CATSrawQ.png
Attachment 4: GMTTriggerRun10Be.png
GMTTriggerRun10Be.png
Attachment 5: MMatrixconfig748_Run368.png
MMatrixconfig748_Run368.png
Attachment 6: Kinematics_run368.png
Kinematics_run368.png
Attachment 7: OverviewReactionTargetMMrun368.png
OverviewReactionTargetMMrun368.png
Attachment 8: CorrelChioVXICats_Run368.png
CorrelChioVXICats_Run368.png
Attachment 9: ChiodigET_EchioQplast.png
ChiodigET_EchioQplast.png
Attachment 10: MMstripsYERawRun368.png
MMstripsYERawRun368.png
Attachment 11: MM_strx_ErawRun368.png
MM_strx_ErawRun368.png
Attachment 12: MMStry_Traw_Run368.png
MMStry_Traw_Run368.png
Fixede748 Fri Jul 7 23:45:52 2017 e748 shift U Simon G +Valérie L (-12 am)/ Daisuke+Shumpei+Marlene (12 am -)RUNGeneralCD2Run 368 (following) at 23h45
At 23h45; Beam stable I 3.95 µA
CATS2 ~ 94 kcps (2 pictures of CATS at 4 hours difference attached)
chio 89kcps Plastics 87kcps FAG ~ 180-190/s
cf Scalers at 23h48.
Sili 1/T5 has tripped (again) around 23h45.
1h00 3.5 µA. Seems PCP intervened. 4.3 µA at 1h05.
1h30 Gradually decreases, but still 4.0 µA
1h30 Sili 1/T5 tripped. Turned on.
3h06 beam 3.7 µA. Sili 1/T5 25.5 µA.
3h25 beam 3.5 µA -> 4.2 µA. Sili 1/T5 25.6 µA. CATS2 0.1 µA.

4h25 if there is any need to enter the room, the PCP would like to re-tune the beam because it is shifting all the time
As it is not yet mandatory, we choose to keep it like that
4h43 SiLi T5 tripped, we switch it on again V=380V I=18uA
5h20 beam intensity has strongly decreased 5e4 pps --> PCP is working on it
5h38 beam is back at 1e5pps

stopped because CAVIAR was not there anymore

MUST2 bias/current
T1 80V I=1.6uA
T2 80V I=3.3uA
T3 70V I=1.0uA
T4 80V I=5.1uA
T5 80V I=1.0uA
T6 80V I=6.9uA
T7 60V I=0.6uA
T8 60V I=1.1uA

Temperatures -1.9°C/-0.3/0.3/1.6°C

e748
-r--r--r-- 1 e748 Exxx 1000M 7 juil. 22:52 run_0368.dat.07-07-17_16h31m32s.3
-r--r--r-- 1 e748 Exxx 1000M 8 juil. 00:21 run_0368.dat.07-07-17_16h31m32s.4
-r--r--r-- 1 e748 Exxx 1000M 8 juil. 01:47 run_0368.dat.07-07-17_16h31m32s.5
-r--r--r-- 1 e748 Exxx 1000M 8 juil. 03:11 run_0368.dat.07-07-17_16h31m32s.6
-rw-r--r-- 1 e748 Exxx 215M 8 juil. 03:29 run_0368.dat.07-07-17_16h31m32s.7

e748chio
-r--r--r-- 1 e748chio Exxx 2,1M 7 juil. 16:28 run_0367.dat.07-07-17_15h57m29s
-rw-r--r-- 1 e748chio Exxx 93M 8 juil. 03:30 run_0368.dat.07-07-17_16h30m17s
Attachment 1: ScalersRUn368at23h48.png
ScalersRUn368at23h48.png
Attachment 2: KinematicsRun368AtMidnight.png
KinematicsRun368AtMidnight.png
Attachment 3: Run368catsStrQrawAt23h54.png
Run368catsStrQrawAt23h54.png
Attachment 4: Cats_run419.png
Cats_run419.png
Attachment 5: chio_digit_run419.png
chio_digit_run419.png
Attachment 6: mm_E_theta_run419.png
mm_E_theta_run419.png
Fixede748 Fri Jul 7 20:26:30 2017 e748 shift U Simon G +Valérie LRUNGeneralCD2Runs 368, 368_1, 368_2, 368_3 10Be runs
RUNS 368, 368_1, 368_2
I ~ 3.7 eµA (on D6 TI22)
General DAQ 1Go during 1h30
For CHIO 1h30 data run ~12Mo

Strong primary beam instabilities (suddenly down to less than 1µA) between 21h50 and 22h
At 21h55 Sili1 T5 has tripped. We put it on again (380V).


-----------------------------------------------------------------------------------
run DAQ e748
-r--r--r-- 1 e748 Exxx 1000M 7 juil. 18:01 run_0368.dat.07-07-17_16h31m32s
-r--r--r-- 1 e748 Exxx 1000M 7 juil. 19:34 run_0368.dat.07-07-17_16h31m32s.1
r--r--r-- 1 e748 Exxx 1000M 7 juil. 21:13 run_0368.dat.07-07-17_16h31m32s.2
-rw-r--r-- 1 e748 Exxx 374M 7 juil. 21:50 run_0368.dat.07-07-17_16h31m32s.3

run chio e748chio
-rw-r--r-- 1 e748chio Exxx 43M 7 juil. 21:50 run_0368.dat.07-07-17_16h30m17s
-----------------------------------------------------------------------------------
Attachment 1: ScalersRun368At20h30.png
ScalersRun368At20h30.png
Attachment 2: TAC_Run368_At21h.png
TAC_Run368_At21h.png
Attachment 3: ScalersRun368at21h52.png
ScalersRun368at21h52.png
Fixede748 Fri Jul 7 22:02:39 2017 e748 shift U Simon G +Valérie LCATSGeneralCD2CATS situation
During Run 368, we note at 21h30 that now CATS2 has continuously a 0.1 µA current. Maybe there are some microtrips on some central part of the detector.
The counter also shows strong fluctuations of CATS2 counting rate between 80 and 40kcps down to 0 then up again.
Concerning the raw charges on CATS, the situation is similar since the beginning of the runs in the afternoon, 7th July.
Attachment 1: StrQRawCats_Run368At22h.png
StrQRawCats_Run368At22h.png
Attachment 2: PosCats_Run368At22h.png
PosCats_Run368At22h.png
Fixede748 Fri Jul 7 22:36:12 2017 e748 shift U Simon G +Valérie LBEAMGeneralCD2Beam during Run368, situation at 22h30
After strong instabilities the beam intensity is better and we have recovered nearly 93kcps on CATS2 as during the beginning
of run 368 at 16h30. Cf scalers below at 22h35, and the picture of the primary beam intensity.
Attachment 1: ScalersRun368_At22h35.png
ScalersRun368_At22h35.png
Attachment 2: P2280831ecranTIat22h40.JPG
P2280831ecranTIat22h40.JPG
Fixede748 Wed Jul 5 04:34:06 2017 e748 shift URUNGeneralCD2Overview of Config and TAC during run 323 (.3)
The counting rates in the Gatconf, confdev, dataTrig of the different branches are checked in the first plot below.
The second picture is for the TAC.


Quality Control:
- Spectra by Anne
- Written by Beatriz and Valérie
- Checked by Nicolas
- Agreed upon by Serge
- Approved by Shift U
Attachment 1: run_323_conf.png
run_323_conf.png
Attachment 2: run_323_tac.png
run_323_tac.png
Fixede748 Wed Jul 5 06:11:47 2017 e748 shift URUNGeneralCD2Overview of Config +QplastTcats1 during run 323 (.5)
The counting rates in the Gatconf, confdev, dataTrig of the different branches are checked in the first plot below.

see plot Qplast %TplCats1 with the night statistics.

Quality Control:
- Spectra by Anne
- Written by Beatriz and Valérie
- Checked by Nicolas
- Agreed upon by Serge
- Approved by Shift U
Attachment 1: Run323QplastTcatsconf.png
Run323QplastTcatsconf.png
Attachment 2: RunControlBuffer5julyAt6h.png
RunControlBuffer5julyAt6h.png
Fixede748 Fri Jul 7 18:18:13 2017 e748 Thomas R. +shift U Simon G +Valérie LCHIOGeneralCD2Thomas's explanations on Agava

AGAVA
cf drawing below done by Thomas.
AGAVA --> Le Time Stamp (TS) de 48 bits est envoyé :
- dans la branche e748 (ganp616) DAQ_MUST2 partie AGAVA
-dans la branche NUMEXO (run control Numexo e748chio ganp976)
signal continu intégration en vol en signaux trapézoďdaux
En soft on a un seuil réglable sur le trapčze cf GECO de Numexo (ganp976)
différence entre baselines du signal au-dessus et sous le seuil --> donne en sortie Ei, TSi
et un flag d'indication du pile-up
Fenętre d'intégration générée par la Chio ~ 2µs.
Attachment 1: P2280829explanationChIo.JPG
P2280829explanationChIo.JPG
Fixede748 Sat Jul 8 06:02:18 2017 e748 Marlčne Daisuke ShumpeiRUNGeneralCD2RUN369
Caviar has tripped during the night (before 4a.m.)
We have put the bias again but we could not reach the nominal value of 1040V. We have set the bias at 950V.
If we increase the bias, then the current rises strongly and reaches the 2uA limit.

Caviar is back with the same efficiency as CATS, but the detector may be damaged.


6h04 SiLi T5 has tripped, switch on again
7h25 SiLi T5 tripped; switched on I=19,8uA


----------------------------------------------------------------
Chio file
e748chio Exxx 584K 8 juil. 06:03 run_0369.dat.08-07-17_06h00m28s
MUST2 file
e748 Exxx 46M 8 juil. 06:04 run_0369.dat.08-07-17_06h00m38s
Attachment 1: scalers_e369.png
scalers_e369.png

ELOG Home Page