MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 8 of 48  Not logged in MUST2
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede755 Fri Jun 29 10:03:06 2018 e755 Valérie, target :TakeshiRUNGeneralCryo-LH2Run 187
Run 187 Friday 29th June start@ 9h53 stop@10h05
e748 Exxx 95976431 29 juin 10:05 run_0187.dat.29-06-18_09h53m29s
All triggers Must2+cats1 and Cats 2 div.
Mean intensity of the beam between 1.5 to 1.8 10**5/s down to 10**4, with large fluctuations.
Fixede755 Tue Jun 26 08:15:29 2018 e755 ValérieMUST2GeneralCryo-LH2MUST2 configuration summary
MUST2 summary 26th June 8am

MUST2 thresholds 402 keV

HV and currents on DSSDs and SiLi at 8h20

Telescopes T
T1 80V ; I ~ 4.7 ľA ; CsI 50V
T2 80V ; I ~ 1.9 ľA ; CsI
T3 70V ; I ~ 0.6 ľA ; CsI
T4 60V ; I ~ 0.5 ľA ; CsI
T5 80V ; I ~ 8.0 ľA ; CsI
T6 80V ; I ~ 0.7 ľA ; CsI
T7 80V ; I ~ 1.1 ľA
T8 80V ; I ~ 4.1 ľA

SiLi 1/T7 200V 10.1 ľA ; SiLi 2 /T7 750V 1.6 ľA
SiLi 1/T8 750V; ~ 27.4 ľA ; SiLi 2 /T8 750V; ~ 1.8 ľA

CATS1 580V ; 0.2 ľA
CATS2 580V ; 0.3 ľA
Attachment 1: MUST2thresholdsMUVI1tel1.png
MUST2thresholdsMUVI1tel1.png
Attachment 2: run139_CsIpadsMUST2.png
run139_CsIpadsMUST2.png
Fixede755 Tue Jun 26 09:52:35 2018 e755 ValérieRUNGeneralCryo-LH2Summary of MUST2 plots during RUN 140

The Csi Mate were put on the trigger again "ENABLE" in the DAS. see snapshot DAS_MUVIenableMateCsI.png entry id=685

Trigger: all MM + CATS DIV

Attachment 1: Run140_MM1toMM4StrXYE.png
Run140_MM1toMM4StrXYE.png
Attachment 2: Run140_MM5toMM8StrXYE.png
Run140_MM5toMM8StrXYE.png
Attachment 3: Run140_MMCsiIpads.png
Run140_MMCsiIpads.png
Attachment 4: Run140_MMImpacts.png
Run140_MMImpacts.png
Fixede755 Tue Jun 26 18:41:59 2018 e755 ValérieRUNGeneralCryo-LH2DAS save Summary of MUST2 conditions -26 june
The DAS configuration was saved under e755.das and .e755_Exp26juin18Mmthreshd.das at 18h40 on June 26th.
Main changes in the DAS on 26 JUNE were:

+The Csi Mate were put on the trigger again "ENABLE" in the DAS. see snapshot DAS_MUVIenableMateCsI.png entry id=685
+ The thresholds for the cut around pedestals, to remove negative parts in Mate X and Y. The aim was to reduce the dead time.see id =690, 692
+ thresholds for the Mate 27 for SiLi of T7 and T8 see Run 143 ; entry id= 691

Trigger: all MM + CATS DIV
MM thresholds all ~ 400 keV

Fixede755 Fri Jun 29 08:06:42 2018 e755 ValérieRUNGeneralCryo-LH2Summary- Runs 175 to 184
RUNS during night Friday 29th June From 3am to 8am
RUNS 175 to 184 - cf Scalers, and TcatsHF plots
Run 175 start @ 3h38 stop @3h53
...
Run 184 start @ 6h32 stop @8h00

e748 Exxx 6420051 29 juin 03:53 run_0175.dat.29-06-18_03h38m13s
-r--r--r-- 1 e748 Exxx 469369357 29 juin 04:11 run_0176.dat.29-06-18_03h53m49s
-r--r--r-- 1 e748 Exxx 49139791 29 juin 04:27 run_0177.dat.29-06-18_04h23m02s
-r--r--r-- 1 e748 Exxx 348480913 29 juin 04:47 run_0178.dat.29-06-18_04h36m30s
-r--r--r-- 1 e748 Exxx 2982845 29 juin 04:54 run_0179.dat.29-06-18_04h46m53s
-r--r--r-- 1 e748 Exxx 502709413 29 juin 05:11 run_0180.dat.29-06-18_04h53m41s
-r--r--r-- 1 e748 Exxx 197665271 29 juin 05:26 run_0181.dat.29-06-18_05h18m41s
-r--r--r-- 1 e748 Exxx 6603229 29 juin 05:38 run_0182.dat.29-06-18_05h25m17s
-r--r--r-- 1 e748 Exxx 1580317947 29 juin 06:23 run_0183.dat.29-06-18_05h38m50s
-r--r--r-- 1 e748 Exxx 3176650393 29 juin 08:00 run_0184.dat.29-06-18_06h32m14s
Attachment 1: scaler_2018-06-29_03h44m56s.png
scaler_2018-06-29_03h44m56s.png
Attachment 2: scaler_2018-06-29_03h45m08s.png
scaler_2018-06-29_03h45m08s.png
Attachment 3: visu_2018-06-29_03h48m33s.png
visu_2018-06-29_03h48m33s.png
Attachment 4: visu_2018-06-29_03h49m09s.png
visu_2018-06-29_03h49m09s.png
Attachment 5: visu_2018-06-29_03h49m34s.png
visu_2018-06-29_03h49m34s.png
Attachment 6: scaler_2018-06-29_03h56m17s.png
scaler_2018-06-29_03h56m17s.png
Attachment 7: visu_2018-06-29_04h19m52s.png
visu_2018-06-29_04h19m52s.png
Attachment 8: visu_2018-06-29_04h23m06s.png
visu_2018-06-29_04h23m06s.png
Attachment 9: scaler_2018-06-29_04h25m07s.png
scaler_2018-06-29_04h25m07s.png
Attachment 10: visu_2018-06-29_04h30m06s.png
visu_2018-06-29_04h30m06s.png
Attachment 11: scaler_2018-06-29_04h38m29s.png
scaler_2018-06-29_04h38m29s.png
Attachment 12: visu_2018-06-29_04h47m32s.png
visu_2018-06-29_04h47m32s.png
Attachment 13: scaler_2018-06-29_04h49m03s.png
scaler_2018-06-29_04h49m03s.png
Attachment 14: visu_2018-06-29_04h51m48s.png
visu_2018-06-29_04h51m48s.png
Attachment 15: scaler_2018-06-29_04h55m47s.png
scaler_2018-06-29_04h55m47s.png
Attachment 16: visu_2018-06-29_05h00m02s.png
visu_2018-06-29_05h00m02s.png
Attachment 17: scaler_2018-06-29_05h22m13s.png
scaler_2018-06-29_05h22m13s.png
Attachment 18: scaler_2018-06-29_05h22m13s.png
scaler_2018-06-29_05h22m13s.png
Attachment 19: visu_2018-06-29_05h22m25s.png
visu_2018-06-29_05h22m25s.png
Attachment 20: scaler_2018-06-29_05h27m25s.png
scaler_2018-06-29_05h27m25s.png
Attachment 21: visu_2018-06-29_05h33m10s.png
visu_2018-06-29_05h33m10s.png
Attachment 22: visu_2018-06-29_05h44m38s.png
visu_2018-06-29_05h44m38s.png
Attachment 23: visu_2018-06-29_05h45m36s.png
visu_2018-06-29_05h45m36s.png
Attachment 24: scaler_2018-06-29_05h43m18s.png
scaler_2018-06-29_05h43m18s.png
Attachment 25: scaler_2018-06-29_06h34m37s.png
scaler_2018-06-29_06h34m37s.png
Attachment 26: visu_2018-06-29_06h37m24s.png
visu_2018-06-29_06h37m24s.png
Attachment 27: visu_2018-06-29_06h54m39s.png
visu_2018-06-29_06h54m39s.png
Attachment 28: visu_2018-06-29_06h54m47s.png
visu_2018-06-29_06h54m47s.png
Attachment 29: visu_2018-06-29_06h56m39s.png
visu_2018-06-29_06h56m39s.png
Fixede755 Fri Jun 29 09:08:50 2018 e755 ValérieRUNGeneralCryo-LH2Plots of Must2 and Cats during run 185
Run 185 Friday 29th June see entry 742

Mean intensity of the beam between 1.5 to 1.8 10**5/s during the run, with large fluctuations.
Attachment 1: Run185_MM1to4StrxEcal.png
Run185_MM1to4StrxEcal.png
Attachment 2: Run185_MM5to8StrxyEcal.png
Run185_MM5to8StrxyEcal.png
Attachment 3: Run185_MM1to6CsIEraw.png
Run185_MM1to6CsIEraw.png
Attachment 4: Run185_MM1to6CsIEcal.png
Run185_MM1to6CsIEcal.png
Attachment 5: Run185_MM1to4StrXEraw.png
Run185_MM1to4StrXEraw.png
Attachment 6: Run185_MM1to4StryEraw.png
Run185_MM1to4StryEraw.png
Attachment 7: Run185_MM5to8StrYEraw.png
Run185_MM5to8StrYEraw.png
Attachment 8: Run185_MM1to4StrXTraw.png
Run185_MM1to4StrXTraw.png
Attachment 9: Run185CatsStripsQraw.png
Run185CatsStripsQraw.png
Attachment 10: Run185CatsStripsQcal.png
Run185CatsStripsQcal.png
Attachment 11: Run185_MUST2_BT.png
Run185_MUST2_BT.png
Attachment 12: Run185_MUST2_BTb.png
Run185_MUST2_BTb.png
Attachment 13: Run185_MM1toMM4_HV.png
Run185_MM1toMM4_HV.png
Attachment 14: Run185_MM5toMM8_CatsHV.png
Run185_MM5toMM8_CatsHV.png
Fixede755 Fri Jun 29 10:41:00 2018 e755 Olivier, Omar, Valérie, target : Nori, TakeshiRUNGeneralCryo-LH2Run 188
Run 188 Friday 29th June start@10h36 stop@10h40

e748 Exxx 18078991 29 juin 10:40 run_0188.dat.29-06-18_10h35m20s
All triggers Must2+cats1 and Cats 2 div.
starting tuning of 37Ca. Primary beam is too unstable. PCP machine tries to stabilize it (it should take less than one hour).
Fixede755 Mon Jun 25 08:38:34 2018 e755 Louis Francois MarleneOFFLINEGeneralCryo-LH238Ca(p,d)37Ca
Here Kine;atics line for th 38Ca(p,d)37Ca Channel from run 110
Attachment 1: 38Capd_Run_110.pdf
38Capd_Run_110.pdf
Attachment 2: 38Capd_Run_110_deE.pdf
38Capd_Run_110_deE.pdf
Fixede755 Wed Jun 27 18:42:09 2018 e755 Daisuke, Olivier, ValérieRUNGeneralCryo-emptyRUN 159 New input in GMT trigger +scalers
Change of the GMT Trigger:
New entry IN12 corresponding to the CATS2 with no division.
This input is taken from the output of the bidiv of CATS1 "N" (duplicating the entry CATS2)

U2M channel 13 output "N-N/D" of the bidiv CATS1
U2M channel 14 output "N-N/D" of the bidiv CATS2
RUN 159 start @ 18h45; stop@ 19h10
e748 Exxx 920487017 27 juin 19:10 /data/e748X/e755/acquisition/run/run_0159.dat.27-06-18_18h45m15s
------
During the run at 18h58 FH31 slits were changed from +/-10 mm to +/-18 mm.
At 19h02 Omar changed the Wien conditions: +/-100kV; 74kV. see plots Run159ICDEtacatsHf_Wien100kV74kV.png
Last plot of trajectories in these conditions: Run159Trajectories_Wien100kV74kV.png
Attachment 1: Run159ICDEtacatsHf.png
Run159ICDEtacatsHf.png
Attachment 2: Run159ICDEtacatsHf_Wien100kV74kV.png
Run159ICDEtacatsHf_Wien100kV74kV.png
Attachment 3: Run159Trajectories_Wien100kV74kV.png
Run159Trajectories_Wien100kV74kV.png
Attachment 4: Run159_GMTalltriggerINewN12.png
Run159_GMTalltriggerINewN12.png
Fixede755 Wed Jun 27 19:27:52 2018 e755 Daisuke, Olivier, ValérieRUNGeneralCryo-emptyRun 161 -36Ca

Run 161 start @ 19h25 stop@20h30
e748 Exxx 2411656699 27 juin 20:30 /data/e748X/e755/acquisition/run/run_0161.dat.27-06-18_19h25m55s

LISE team: Omar K, Jean-Charles T.
no Wien filter
SLITS FH31 +/- 8mm
Attachment 1: Run161CDEtacatsHf_noWienSlitsFH31at8mm.png
Run161CDEtacatsHf_noWienSlitsFH31at8mm.png
Attachment 2: Run161_scalers.png
Run161_scalers.png
Attachment 3: Run161EdeTOFcats.png
Run161EdeTOFcats.png
Attachment 4: Run161TrajectoriesCats.png
Run161TrajectoriesCats.png
Attachment 5: Run161mmImpactswithSourcealpha.png
Run161mmImpactswithSourcealpha.png
Fixede755 Wed Jun 27 20:39:44 2018 e755 Daisuke, Olivier, ValérieRUNGeneralCryo-emptyRun 162-38Ca
TUNING OF 38Ca to be ready during the night, after the change of CO source at the machine between 21h ans 2am (maybe).
LISE team: Omar K, Jean-Charles T.
Tuning made for 38Ca
Run 162 start @ 20h32 stop@ 20h49
e748 Exxx 145558571 27 juin 20:49 /data/e748X/e755/acquisition/run/run_0162.dat.27-06-18_20h31m53s
Run162_ICDE1TcatsHF.png
Attachment 1: run162_Trajectories38Ca.png
run162_Trajectories38Ca.png
Attachment 2: Run162_ICDE1TcatsHF.png
Run162_ICDE1TcatsHF.png
Fixede755 Wed Jun 27 19:26:13 2018 e755 Daisuke, Olivier, Pierre, ValérieRUNGeneralCryo-emptyRun 160 -36Ca
TAC Cats2 HF delay of 30 ns is removed

Run 160 start@ 19h13 stop@ 19h23
e748 Exxx 409258163 27 juin 19:23 /data/e748X/e755/acquisition/run/run_0160.dat.27-06-18_19h13m05s

LISE team: Omar K, Jean-Charles T.
Attachment 1: Run160CDEtacatsHf_Wien100kV74kV.png
Run160CDEtacatsHf_Wien100kV74kV.png
Fixede755 Thu Jun 28 00:59:55 2018 e755 Daisuke, Olivier, Pierre, Marlčne, Valérie (: edit)RUNGeneralCryo-emptyRun 162-38Ca
38Ca Beam at ~ 2. 10**5 pps
F62 +/- 11 mm
SLITS FH31 +/-5mm (moment)
Run 164 start @ 0h55 stop@
Attachment 1: run164_scalersAt1h.png
run164_scalersAt1h.png
Attachment 2: run164_TcatsHF_38Ca.png
run164_TcatsHF_38Ca.png
Attachment 3: run164_MMimpacts.png
run164_MMimpacts.png
Attachment 4: run164_ICDE_TcatsHF.png
run164_ICDE_TcatsHF.png
Attachment 5: run164_CatsProfile.png
run164_CatsProfile.png
Attachment 6: run164_QcatsStrXYraw.png
run164_QcatsStrXYraw.png
Attachment 7: run164_QcatsStrXYCal.png
run164_QcatsStrXYCal.png
Attachment 8: run164_MM_CsIEraw.png
run164_MM_CsIEraw.png
Fixede755 Wed Jun 27 17:46:55 2018 e755 Daisuke, Olivier, Nori, ValérieRUNGeneralCryo-emptyRun 158 Beam tuning for 36Ca
At 17h20 the beam was back in D6, ready for tuning by the LISE team, Christelle, Jean-Charles and Omar.

Run 158 start @ 18h06 stop@18h22
e748 Exxx 83258011 27 juin 18:22 /data/e748X/e755/acquisition/run/run_0158.dat.27-06-18_18h06m30s
at the beginning of the run, Wien filter was at 2kV. Then at 1 kV (at 18h10) to recenter beam trajectories in Y.
See plot Run158TrajectoriesWien1kV.png
wien filter at +5kV: Run158_trajectoriesWien5kV.png ; same with larger scale Run158_trajectoriesWien5kVok.png
Attachment 1: Run158TrajectoriesWien1kV.png
Run158TrajectoriesWien1kV.png
Attachment 2: Run158_trajectoriesWien5kV.png
Run158_trajectoriesWien5kV.png
Attachment 3: Run158_trajectoriesWien5kVok.png
Run158_trajectoriesWien5kVok.png
Fixede755 Sat Jun 23 20:09:00 2018 e755 - Louis, ValérieRUNGeneralCryo-LH2Summary of Runs 83 and 84
CATS beam 1.7 10**5 /s
Run 84 start @ 19h54 stop @ 20h16 on problem with CO.
the PCP said: Maybe 10 minutes of beam stop. Let's see.

==========================================================================================
e748 Exxx 51110971 23 juin 19:46 /data/e748X/e755/acquisition/run/run_0083.dat.23-06-18_19h29m47s
e748 Exxx 469310055 23 juin 20:16 /data/e748X/e755/acquisition/run/run_0084.dat.23-06-18_19h54m06s
==========================================================================================
Attachment 1: run_0084_Startscaler.png
run_0084_Startscaler.png
Attachment 2: scalersRun84at20h14.png
scalersRun84at20h14.png
Attachment 3: MergerNarvalRun84.png
MergerNarvalRun84.png
Attachment 4: GMTmasterE755.png
GMTmasterE755.png
Attachment 5: GMTmasterchronoE755.png
GMTmasterchronoE755.png
Attachment 6: Runstop84NarvalRCC.png
Runstop84NarvalRCC.png
Attachment 7: TempMuvi1MufeeXTel1.png
TempMuvi1MufeeXTel1.png
Attachment 8: TempMuvi2MufeeYTel6.png
TempMuvi2MufeeYTel6.png
Attachment 9: TempMuvi2MufeeXTel6.png
TempMuvi2MufeeXTel6.png
Attachment 10: TempMuvi2MufeeXTel8.png
TempMuvi2MufeeXTel8.png
Attachment 11: run84_HTmust2tel1to4.png
run84_HTmust2tel1to4.png
Attachment 12: run84_HTmust2tel5to8andCats.png
run84_HTmust2tel5to8andCats.png
Attachment 13: run84Plastic.png
run84Plastic.png
Attachment 14: Run84MM1toMM6eCsI.png
Run84MM1toMM6eCsI.png
Attachment 15: Run84MMimpact.png
Run84MMimpact.png
Attachment 16: run84MMstrxYEandYEcal.png
run84MMstrxYEandYEcal.png
Attachment 17: run84MM5to8strxYEandYEcal.png
run84MM5to8strxYEandYEcal.png
Attachment 18: Run84profilBeamCats.png
Run84profilBeamCats.png
Attachment 19: Run84RawChargePlotCats.png
Run84RawChargePlotCats.png
Fixede755 Sat Jun 23 20:56:15 2018 e755 - Louis, ValérieRUNGeneralCryo-LH2Run 85
CATS beam 1.8 10**5 /s
Beam back at 20h46
Run 85 start @ 20h46 stop @21h02
We stop the beam to enter in D6 area to empty the target.
==========================================================================================
e748 Exxx 427563975 23 juin 21:02 /data/e748X/e755/acquisition/run/run_0085.dat.23-06-18_20h46m25s

==========================================================================================
Attachment 1: Run85_scalersAt20h48.png
Run85_scalersAt20h48.png
Attachment 2: run85Catsprofiles.png
run85Catsprofiles.png
Fixede755 Sat Jun 23 22:42:33 2018 e755 - Louis, ValérieMUST2HardwareCryo-LH2Status of MUST2 telescopes 23 june 18
Temperatures on the Mufeex-Y cards:

Temperature set on the regulator -4°C.
----------------------------------------------------
T1 X 5°C | T1Y 2°C
----------------------------------------------------
T2 X 6°C | T1Y 2°C
----------------------------------------------------
T3 X 4°C | T1Y 1°C
--------------------------------------------------
T4 X 3°C | T1Y 1°C
----------------------------------------------------
T5 X 6°C | T1Y 4°C
----------------------------------------------------
T6 X 10°C | T1Y 2°C
---------------------------------------------------
T7 X 2°C | T1Y electronic probe is not running well: !!! -127 (128= 2**7)
----------------------------------------------------
T8 X 8°C | T1Y 6°C
Attachment 1: TempMuvi1MufeeXTel1.png
TempMuvi1MufeeXTel1.png
Attachment 2: TempMuvi2MufeeYTel6.png
TempMuvi2MufeeYTel6.png
Attachment 3: TempMuvi2MufeeXTel6.png
TempMuvi2MufeeXTel6.png
Attachment 4: TempMuvi2MufeeXTel8.png
TempMuvi2MufeeXTel8.png
Attachment 5: Run88scalersAt23hORDI.png
Run88scalersAt23hORDI.png
Fixede755 Sat Jun 23 23:31:12 2018 e755 - Louis, ValérieRUNGeneralCryo-LH2Run 89-Empty target measurement
CATS beam 1.5 10**5 /s

Run 89 start @ 23h29
empty target

=============================================
restarted after beam tuning,
Beam was shifted in y direction as shown on the picture
to be fixed tomorrow
=============================================
Attachment 1: Run89CatsProfile.png
Run89CatsProfile.png
Fixede755 Sat Jun 23 21:17:03 2018 e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, ValérieRUNGeneralCryo-LH2Run 86-Test measurement, (heating target)
CATS beam 1.8 10**5 /s
Target temperature increasing during the run.
Run 86 start @ 21h05 stop @21h41

==========================================================================================
e748 Exxx 574662435 23 juin 21:42 /data/e748X/e755/acquisition/run/run_0086.dat.23-06-18_21h14m01s

==========================================================================================
Attachment 1: run86Scalersat21h17.png
run86Scalersat21h17.png
Fixede755 Sat Jun 23 21:51:04 2018 e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, ValérieRUNGeneralCryo-LH2Run 87-Empty target measurement
CATS beam 1.8 10**5 /s

Run 87 start @ 21h42 stop @ 21h52

==========================================================================================

e748 Exxx 108503761 23 juin 21:52 /data/e748X/e755/acquisition/run/run_0087.dat.23-06-18_21h42m39s
==========================================================================================
Attachment 1: run87Scalersat21h50.png
run87Scalersat21h50.png

ELOG Home Page