MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 5 of 48  Not logged in MUST2
Fixed, e738, Tue Jul 10 17:02:02 2018, jacques, daisuke, freddy, louis, RUN, General, Cryo-LH2, RUN 332 run_332_ScalerStartRun.pngrun_332_ScalerEndRun.pngrun_332_TargetImpact.png
12C primary: 1.7 uA
start: 16h52
stop: 17h52

Beam stop due to CSS2 power supply failure
Fixed, e738, Tue Jul 10 13:59:09 2018, jacques, daisuke, freddy, RUN, General, Cryo-LH2, RUN 331 6x
9C + liquid H
13h56 start. 12C 1.7 electric micro A.
16h51 stop
Fixed, e744, Thu May 24 01:10:30 2018, iuliqn, RUN, General, , run 433 Lise trigger 
Should be ql foil in front of the si detector....
Fixed, e744, Fri May 25 21:37:45 2018, iulian nicolas valérie, RUN, General, N/A, run 1012 all triggers 14O beam in D4 Run1012_E1_TcatsHF.pngRun1012_E1_T1HF_D6.png
Fixed, e744, Tue May 29 12:06:05 2018, iulian maurycy, OFFLINE, General, CH2, Carbon substraction  Carbon_runs_scale_factor.pdf
The scale factor for Carbon subtraction is 1.224. This means: RealCountsHidrogen=Counts CH2 - 1.224 * CountsCarbon

runs considered for the CH2 target

/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2013_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2014_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2015_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2016_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2017_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2018_0.root
after the long interruption
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2101_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2102_0.root

run 2100 was not considered

runs considered for the Carbon subtraction:
after the long interruption
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2103_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2104_0.root
/home/e748/analysis/nptool/Projects/e744/conversion/rootdir/run_2105_0.root
the rest of runs was not considered
Fixed, , Tue Feb 26 12:16:10 2019, iulian freddy francois, MUST2, Software, N/A, run 41 Calimero run MUVI 1 sector1X 
Run 41

Calimero WORKS!!
Pinned, e744, Mon May 21 11:26:55 2018, iulian cristina, OTHER, Hardware, N/A, error stop run/ run still going error_Narval.pngerror_DAS1.png
After stopping run 347, the narval looks like everything was stopped (blue ready), but I still had FAGs, VALs, and the leds on the GMT were blinking. MUVI was in ready state (leds green - red).
Fixed, e744, Mon May 21 11:42:16 2018, iulian cristina, MUST2, Software, N/A, run 348 test comunication with Must. Pulser T1 channel 11 MUST2_Pulser_T1_E11_run348.png
Fixed, e744, Tue May 22 10:44:30 2018, iulian Fairouz Valerie, MUST2, Software, N/A, Run #353 Calimero T1-T4 strips X 
Started run #353
Calimero T1-T4 strips X
Time Calibrator 320 ns ; period 20 ns
Fixed, e744, Tue May 22 12:09:27 2018, iulian Fairouz Valerie, MUST2, Software, N/A, Run #354 Calimero T1-T4 strips X PlotXTel1tXT88Probmate.pngPlotTel1strxT101calimOk.pngPlotXTel1to4XTProbmate.pngPlotXTel1to4XTcalimero.pngPlotXTel1to4XTcalimero.png
Started run #353
Calimero T1-T4 strips X
Time Calibrator 640 ns ; period 20 ns
Fixed, e744, Tue May 22 12:10:27 2018, iulian Fairouz Valerie, MUST2, Software, N/A, Run #355 Calimero T1-T4 strips Y 
Started run #353
Calimero T1-T4 strips Y
Time Calibrator 640 ns ; period 20 ns
Fixed, e744, Tue May 1 10:47:41 2018, iulian & valerian, RUN, General, 60Co, run 189 60 Co source 
run #189 60co source EXL+PPT trigger
Changed the way of codding PPT. for this run ppt is coded with the QDC using first dynode.
Started @10h48 01/05
stopped @8H55 02/05 Francois
Fixed, e744, Thu May 10 15:06:44 2018, iulian & valerian, EXL-PPT, General, 60Co, Started run #211 & #212 #213 60Co source efficiency run PPT_spectra_run213.pngEXL_spectra_run213.png
Run #211 BAD Run no BT
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @15h05 10/05
stop @10h38 11/05

Run #212 BAD Run threshold changed
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @12h19 11/05
stop @13h14 11/05

Run #213
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @13h20 11/05
stop @8h20 12/05

QDCTDC_VOIE_0 -> PPT_E

This run used e744_12mai_founctione.das config (looks corrupted for must2 as no y energies)
Fixed, e744, Tue May 22 21:43:31 2018, iulian & megumi, MUST2, Software, N/A, run 361  T1T4_Xstrips_run361.png
run 361
start 20h38
stop 21h41
Fixed, e744, Tue May 22 21:57:51 2018, iulian & megumi, MUST2, Software, N/A, Run #362 Calimero T1-T4 strips X again with solution Thresolds_T4_run362.pngT1T4_Xstrips_run362.png
Changed the Thresholds on T4. No longer double peaks...
I guess there is some noise on the T4 and he triggers on the noise from time to time => double peaks
Also T1-T3 have have strip 16 near pidestal who is counting a lot (red)
Pinned, e744, Tue May 22 23:42:02 2018, iulian & megumi, EXL-PPT, Software, N/A, Run #366 NARVAL FATAL ERROR error_narval_run366.png
RUN #366
EXL PPT triggers
Falat error from NARAVL


after the error, there is also following message,

____________

Level : WARN
Date : 23/05/2018 00:11:04
Logger : log from NARVAL.storer
Remote Info : localhost:41058
- - - - - - - - - -
Message :
Basic_Storer.Update_Files_Status : File name /data/e748X/e744/acquisition/run/run_0368.dat.22-05-18_23h46m25s already used.

____________

we change the run number to 400, and restart taking data

RUN #400
EXL PPT trigger
for chacking coincidence
Fixed, e744, Sun May 20 18:53:44 2018, iulian Jaromir Cristina, EXL-PPT, General, N/A, Run #347 Background run EXL & PPT triggers PPT_run347.pngEXL_T_run347.pngEXL_E_run347.png
Run #347
Background run EXL & PPT triggers
start @18h53 20/05
stop @11h14 21/05
Pending, , Sat Apr 28 21:12:55 2018, iulian, MUST2, General, 3-alpha, Run 182 end ; problem with cooling end_result_alpha_source_28_April.png
RUN 182 start @13h
Stoped @ 21H

3alpha run
Problem with cooling of M2 in M2C. Looks like the debit reduced in time: retour no longer as cold as entrance.

Removed the HVs but mantain cooling to test.
Fixed, e744, Mon Apr 30 20:38:21 2018, iulian, RUN, General, 3-alpha, 6run 186 3a source 60 co source 
run #186

start@11h 30/04
stop @ 20h40

trigger T1-T5+EXL+PPT
Fixed, e744, Mon Apr 30 20:42:34 2018, iulian, RUN, General, 60Co, run 188 60 co source 
run #188 60co source EXL+PPT trigger

Started @20h42 30/04
Stopped @10h37 01/05

ELOG Home Page