Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e755 |
Tue Jul 3 17:55:01 2018 |
takeshi | RUN | General | Cryo-LH2 | run summary for 40Ca + liq. H2 | We have obtained 6 hours data for the 40Ca
+ liq. hydogen setting today.
Note that we have already taken 15.6 hours |
|
Fixed | e755 |
Tue Jul 3 18:19:30 2018 |
daisuke | OTHER | General | N/A | Data saved after experiment | DAS: /home/e748/ganacq_manip/e755/das-save/2018-07-03_fin_e755
VIGRU: /home/e748/analysis/GRU/GRU_18_03_12/vigru_e755_final_2018-07-03_18h15.xml
Online: /home/e748/analysis/nptool/Projects/e755/online/2018-07-03_18h24
|
7x |
Fixed | e755 |
Tue Jul 3 18:48:52 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | Here is the temperature log of the liquid
hydrogen target,
We kept it about 6 days. |
 |
Fixed | e755 |
Wed Jul 4 15:34:34 2018 |
Nori | BEAM | General | N/A | 37Ca PID at D6 | A particle identification plot of 37Ca from
LISE run 332. |
|
Fixed | e738 |
Wed Jul 4 18:11:44 2018 |
louis, daisuke | RUN | General | 3-alpha | RUN 243 | MUST2 data taking with the 3 alpha source
(positioned downstream of the target to shoot
T1 to T8). |
   |
Fixed | e738 |
Wed Jul 4 18:43:29 2018 |
daisuke | RUN | General | 3-alpha | RUN 244 | 3 alpha source at 'off-beam-axis' position
(right center view from upstream). FAG ~40
Hz (mostly from T1-4) |
   |
Fixed | e738 |
Thu Jul 5 10:47:42 2018 |
louis, serge, pierre, daisuke | RUN | General | 3-alpha | RUn 245 | 3 alpha source, off beam, low down position
. FAG 40 Hz. Likely due to beta rays (see
the attachment) |
    |
Fixed | e738 |
Thu Jul 5 10:49:40 2018 |
louis, serge, pierre, daisuke | RUN | General | 3-alpha | RUn 245 | 3 alpha source, off beam, low down position
. FAG 40 Hz. Likely due to beta rays (see
the attachment) |
    |
Fixed | e738 |
Thu Jul 5 11:08:04 2018 |
pierre, louis daisuke | RUN | General | N/A | RUN 249 | cats 1 pulser calibration. trigger cats1%1 |
 |
Fixed | e738 |
Thu Jul 5 14:12:18 2018 |
Louis | MUST2 | General | 3-alpha | RUN 253 calib alpha | |
    |
Fixed | e738 |
Thu Jul 5 19:22:18 2018 |
daisuke | RUN | General | 3-alpha | RUN 256 | 3 alpha measurement after merging CAVIAR vme
to the DAQ |
   |
Fixed | e738 |
Fri Jul 6 17:14:50 2018 |
daisuke | ONLINE | Software | N/A | Online analysis code: e755.detector | The file e755.detector was updated to include
the following parameters to ModularLeaf.
|
  |
Fixed | e738 |
Fri Jul 6 18:43:39 2018 |
Nori | ONLINE | Software | N/A | Online analysis code: e755.detector | The modular label file has to be modified.
lpcgrit:/home/e748/analysis/nptool/Projects/e755 |
|
Fixed | e738 |
Sat Jul 7 08:16:50 2018 |
daisuke | MUST2 | Hardware | N/A | MUST2 BT/HT | |
   |
Fixed | e738 |
Sat Jul 7 14:33:45 2018 |
shumpei takeshi megumi | TARGET | Hardware | Cryo-LH2 | Liquid H2 status | We start liquifying H2 at 14:09 and seems
to be filled at 14:29. |
|
Fixed | e738 |
Sat Jul 7 19:47:21 2018 |
daisuke | MUST2 | Hardware | N/A | MUST2 BT/HT | |
    |
Fixed | e738 |
Sun Jul 8 00:45:44 2018 |
takeshi | RUN | General | N/A | run summary | The runsummary for this E738 experiment is
available at the same place as previous e755
experiment.
|
|
Fixed | e738 |
Sun Jul 8 01:24:16 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 284 | start: 1h15
stop: 3h11
|
  |
Fixed | e738 |
Sun Jul 8 03:13:35 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 285 | start: 03h12
stop: 05h10
|
    |
Fixed | e738 |
Sun Jul 8 05:09:11 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 286 | start: 05h11
stop: 07h00 |
13x |