Fixede744 Fri May 18 17:38:21 2018 Francois and PedjaOTHERHardware translator nim to ecl
There was a problem with the scalers, not all of them were working. After several tests, we changed the electronic module, from Lecroy ECl-NIM-ECL to module LPC translator NIM-ECL. We checked all channels, they work. For a while channel N°4 was not working. We changed the nim cable, it works now.
Pendinge744 Wed May 30 15:26:40 2018 Francois MarleteBEAMGeneral problem with beam
14H00 : The primary beam was misaligned, they are still working on it. No 14O beam.
Ongoinge744 Wed May 16 09:49:26 2018 Francois & Ruxandra & ArmelBEAMHardware E1D6 and E2D6 detectors
After struggling with the noise, we achieved ~ 50 keV resolution.

Source = 1 alpha peak 241Am E=5.485 MeV

Detector E1D6 50 µm 25 V in principle, but set to 100 V
Detector E2D6 300 µm 70 V in principle, but set to 100 V

PA gain = 20 mV/MeV

Maximum output signal of the new PA (differential) = 8 V.
Fixede744 Mon May 28 12:22:42 2018 Francois & MarleteOFFLINEGeneral superposition exp / theory for 15O and 15F
Fixede744 Sun Apr 29 20:37:58 2018 FrancoisCATSGeneral Chronogram
Ongoinge744 Mon May 14 12:57:44 2018 FrancoisTARGETGeneral target preparation


Cibles Georges

1) Plastique 63 µm

2) 104 µm

3) 200 µm



Cibles GoodFellow

4) Carbone 0.075 mm (je calcule épaisseur de 8,9 mg/cm2)

5) Polyéthylčne 63 µm

6) Polyéthylčne 0,1 mm = 100 µm

7) 2 cibles de 100 µm en sandwich = 200 µm


Pendinge744 Tue May 22 19:40:26 2018 FrancoisBEAMGeneral Planning of the experiment
Pendinge744 Sat May 26 13:22:08 2018 FrancoisBEAMGeneral problem with CSS1
There is a leakage of water in cavity north of cyclotron CSS1. I discussed with Alain Savale.

There are 2 options:

1) We take the beam as it is, probably deteriorated, with a lower intensity. There is a risk of break up in CSS1. The vacuum of the cavity is maintained probably by a small piece of ice only.

2) They can make a new setting of CSS1, using only one acceleration cavity (south). They would stop the north cavity and reduce the water pressure. In this case the beam is also deteriorated.


Decision:
We chose option 1 and we will observe the stability of the vacuum in CSS1 in time. If the stability is bad, vacuum too bad, later in the day they will decide to go to option 2. This means several hours without beam (may be a few hours).
Fixede744 Tue May 29 10:42:00 2018 FrancoisBEAMGeneral effective beam time
In total, there were:

1.4 UT of 14O, average 2x10^5 pps
0.7 UT of 14N, calibration
0.7 UT of background subtraction (carbon)


+ plot of the beam current during the last day.
Fixede755 Sun Jun 24 09:48:46 2018 FrancoisBEAMGeneral No beam
9H10: D5 stopped at 9H10. We asked for the beam.

9H48: Still no beam. There is a problem with the beam current limits set in the accelerator. They have to change it from 40 nAe between CO1 and CSS1 to 3.8 µAe after CSS2.

10H05: Still no beam. Vincent arrived for the air conditioning of D6.

10H23: No beam. They have to re-align the beam in the alpha line.

11H45: Beam is back after alignment of the entrance of the LISE line
Fixede744 Tue May 29 02:01:58 2018 Franck, Valerian, PhilRUNGeneralCarbonRun 2104 - Target 1 Carbon
Run 2104
Beam: 14O
Start @ 2:00 29 May 2018
Stop @ 4:01 29 May 2018

Target 1 Carbon
Franck, Phil, Valerian

Beam rate (CATS): 1.4e5 pps
Fixede744 Tue May 29 02:38:21 2018 Franck, Valerian, PhilONLINEGeneralCarbonSpectra and HV Start Run 2104
Fixede744 Tue May 29 04:08:52 2018 Franck, Valerian, PhilRUNGeneralCarbonRun 2105 - Target 1 Carbon
Run 2105

Beam 14O

Start 4:06 29 May 2018
Stop 6:06 29 May 2018

Target 1 Carbon

Franck, Valerian, Phil
Ongoinge744 Tue May 29 06:09:58 2018 Franck, PhilRUNGeneralCarbonRun 2106 - Target 1 Carbon
Run 2106

Beam 14O (CATS: 1.4e5 pps)

Start 6:08 29 May 2018
Stop 6:17 29 May 2018

Stopped because FAG rate low and ORDs low, "BAD MERGE" error messages

Target 1 Carbon
Ongoinge744 Tue May 29 07:39:53 2018 Franck, PhilRUNGeneralCarbonRun 2107 - Restart after Reboot of VXI - Same problem
Low FAG rate: 30 /s
Low ORD rates: 0-10 /s, 15 /s on MM5
Fixede738 Wed Jul 11 09:32:37 2018 Franck, Jacques, DaisukeRUNGeneralCryo-LH2Run 342
Wed 11 July 2018

Start @ 9:19
Stop @ 9:29


CATS1 : 200 kcps
CATS2 : 100 kcps

RUN STOPPED TO REPLACE CATS2
Ongoinge738 Wed Jul 11 15:41:33 2018 Franck, Jacques, DaisukeRUNGeneralCryo-LH2Run 347
Run 347 Start 15:28 stop 17h17
e748 Exxx 3,6G 11 juil. 17:17 /data/e748X/e755/acquisition/run/run_0347.dat.11-07-18_15h28m32s
CATS thresholds lowered from 40 to 24 mV

CATS2 HT lowered from 670 to 650 V

Currents: CATS1 0.16 µA , CATS2 0.12 -> 1 µA
Current spikes on CATS2 less frequent than at 670 V

Rates:
CATS1: 215 kcps
CATS2: 186 kcps
CAVIAR: 250 kcps
Plastic: 190 kcps
Fixede738 Wed Jul 11 12:04:29 2018 Franck, Jacques + CATS TeamCATSGeneralN/ARun 343 - CATS2 pulser calibration
Start 11:53
Stop 11:59

CATS2 pulser calibration

Attenuations: 1, 2, 4, 5
+ pedestal
Fixede748 Mon Jul 3 14:28:09 2017 Franck et ValérianCHIOHardwareN/ACHIO's electronic scheme
A quick scheme of the CHIO electronic. The patch outputs are the one from the LISE acquisition room.
Fixede748 Tue Jul 4 20:27:59 2017 Franck et ValérianCHIOHardwareN/AUPDATE : CHIO's electronic scheme (valid from run 217)
Modification of the scheme to add the delay on the CHIO's logic signal for stop of the digitizer.