Fixede755 Mon Jul 2 23:29:32 2018 Louis PierreOTHERHardwareN/ANew division for CATS and plastic
Division for CATS and Plastic: 3x10^4

Plastic => Chanel 16 of GMT
Fixede755 Tue Jul 3 10:47:01 2018 LouisRUNGeneralCryo-LH2Run beam tuning
RUN 236:
started 10h46, stop at 11h09

RUN 237:
started 11h18, stop at 11h20


Beam tunning
Fixede755 Tue Jul 3 11:48:30 2018 LouisRUNGeneralCryo-LH2Run 238 40Ca
RUN 238:

START 11h23 STOP 12h50

Beam: 40Ca at 1.8*10⁵pps
Trigger: T1 to T8, CATS1div, CATS2div, Plastic
Target: LH2
Attachment 1: scaler_2018-07-03_11h49m11s.png
scaler_2018-07-03_11h49m11s.png
Attachment 2: visu_2018-07-03_11h41m38s.png
visu_2018-07-03_11h41m38s.png
Attachment 3: visu_2018-07-03_11h42m16s.png
visu_2018-07-03_11h42m16s.png
Attachment 4: visu_2018-07-03_11h42m22s.png
visu_2018-07-03_11h42m22s.png
Attachment 5: visu_2018-07-03_11h42m30s.png
visu_2018-07-03_11h42m30s.png
Attachment 6: visu_2018-07-03_11h42m35s.png
visu_2018-07-03_11h42m35s.png
Attachment 7: visu_2018-07-03_11h42m40s.png
visu_2018-07-03_11h42m40s.png
Attachment 8: visu_2018-07-03_11h42m44s.png
visu_2018-07-03_11h42m44s.png
Attachment 9: visu_2018-07-03_11h42m49s.png
visu_2018-07-03_11h42m49s.png
Attachment 10: visu_2018-07-03_11h42m55s.png
visu_2018-07-03_11h42m55s.png
Attachment 11: visu_2018-07-03_11h43m03s.png
visu_2018-07-03_11h43m03s.png
Attachment 12: visu_2018-07-03_11h43m11s.png
visu_2018-07-03_11h43m11s.png
Attachment 13: visu_2018-07-03_11h43m42s.png
visu_2018-07-03_11h43m42s.png
Attachment 14: visu_2018-07-03_11h43m50s.png
visu_2018-07-03_11h43m50s.png
Attachment 15: visu_2018-07-03_11h43m56s.png
visu_2018-07-03_11h43m56s.png
Attachment 16: visu_2018-07-03_11h44m02s.png
visu_2018-07-03_11h44m02s.png
Attachment 17: visu_2018-07-03_11h46m09s.png
visu_2018-07-03_11h46m09s.png
Attachment 18: visu_2018-07-03_11h46m47s.png
visu_2018-07-03_11h46m47s.png
Fixede755 Tue Jul 3 13:37:19 2018 LouisRUNGeneralCryo-LH2RUN 239
Run 239
start at 13h30, stop at 15h18

beam: 40Ca at 2.3*10⁵pps
target: LH2
trigger: T1 to T8, CATS1div, CATS2div,PLASTICdiv
Attachment 1: scaler_2018-07-03_13h39m44s.png
scaler_2018-07-03_13h39m44s.png
Attachment 2: visu_2018-07-03_13h39m45s.png
visu_2018-07-03_13h39m45s.png
Attachment 3: visu_2018-07-03_13h41m15s.png
visu_2018-07-03_13h41m15s.png
Fixede755 Tue Jul 3 15:22:26 2018 LouisRUNGeneralCryo-LH2RUN 240
Run 240
start at 15h17, stop at

beam: 40Ca at 2*105pps
target: LH2
trigger: T1 to T8, CATS1div, CATS2div,PLASTICdiv
Attachment 1: scaler_2018-07-03_15h23m18s.png
scaler_2018-07-03_15h23m18s.png
Fixede755 Tue Jul 3 17:54:44 2018 LouisRUNGeneralCryo-LH2Run 241, 242
RUN 241

start at 17h12, stop at 17h35

beam: 40Ca at 1*105pps
target: LH2
trigger: T1 to T8, CATS1div, CATS2div,PLASTICdiv

RUN 242

start at 17h35, stop at

beam: 40Ca at 1*105pps
target: LH2
trigger: T1 to T8, CATS1div, CATS2div,PLASTICdiv
Attachment 1: visu_2018-07-03_18h04m00s.png
visu_2018-07-03_18h04m00s.png
Attachment 2: visu_2018-07-03_18h04m06s.png
visu_2018-07-03_18h04m06s.png
Attachment 3: visu_2018-07-03_18h04m08s.png
visu_2018-07-03_18h04m08s.png
Attachment 4: visu_2018-07-03_18h04m14s.png
visu_2018-07-03_18h04m14s.png
Attachment 5: visu_2018-07-03_18h04m19s.png
visu_2018-07-03_18h04m19s.png
Attachment 6: visu_2018-07-03_18h04m24s.png
visu_2018-07-03_18h04m24s.png
Attachment 7: visu_2018-07-03_18h04m30s.png
visu_2018-07-03_18h04m30s.png
Attachment 8: visu_2018-07-03_18h04m36s.png
visu_2018-07-03_18h04m36s.png
Attachment 9: visu_2018-07-03_18h04m42s.png
visu_2018-07-03_18h04m42s.png
Attachment 10: visu_2018-07-03_18h04m47s.png
visu_2018-07-03_18h04m47s.png
Attachment 11: visu_2018-07-03_18h04m57s.png
visu_2018-07-03_18h04m57s.png
Attachment 12: visu_2018-07-03_18h05m04s.png
visu_2018-07-03_18h05m04s.png
Attachment 13: visu_2018-07-03_18h05m09s.png
visu_2018-07-03_18h05m09s.png
Attachment 14: visu_2018-07-03_18h05m14s.png
visu_2018-07-03_18h05m14s.png
Attachment 15: visu_2018-07-03_18h05m20s.png
visu_2018-07-03_18h05m20s.png
Attachment 16: visu_2018-07-03_18h05m27s.png
visu_2018-07-03_18h05m27s.png
Attachment 17: visu_2018-07-03_18h05m47s.png
visu_2018-07-03_18h05m47s.png
Attachment 18: visu_2018-07-03_18h06m06s.png
visu_2018-07-03_18h06m06s.png
Attachment 19: visu_2018-07-03_18h06m14s.png
visu_2018-07-03_18h06m14s.png
Attachment 20: visu_2018-07-03_18h06m23s.png
visu_2018-07-03_18h06m23s.png
Attachment 21: visu_2018-07-03_18h06m31s.png
visu_2018-07-03_18h06m31s.png
Attachment 22: visu_2018-07-03_18h06m44s.png
visu_2018-07-03_18h06m44s.png
Fixede755 Tue Jul 3 17:55:01 2018 takeshiRUNGeneralCryo-LH2run summary for 40Ca + liq. H2
We have obtained 6 hours data for the 40Ca + liq. hydogen setting today.
Note that we have already taken 15.6 hours data for this setting at the beginning of the BT.

See the spreadsheet for the detail.
https://docs.google.com/spreadsheets/d/1yErcQcrXPdJjEOfUd9D9KPWWkWQpw5kX4wFze6vwij4/edit#gid=0
Fixede755 Tue Jul 3 18:19:30 2018 daisukeOTHERGeneralN/AData saved after experiment
DAS: /home/e748/ganacq_manip/e755/das-save/2018-07-03_fin_e755
VIGRU: /home/e748/analysis/GRU/GRU_18_03_12/vigru_e755_final_2018-07-03_18h15.xml
Online: /home/e748/analysis/nptool/Projects/e755/online/2018-07-03_18h24
HT/BT: screenshots attached.
Attachment 1: screenshot_2018-07-03_18h18m23s.png
screenshot_2018-07-03_18h18m23s.png
Attachment 2: screenshot_2018-07-03_18h18m42s.png
screenshot_2018-07-03_18h18m42s.png
Attachment 3: screenshot_2018-07-03_18h18m50s.png
screenshot_2018-07-03_18h18m50s.png
Attachment 4: screenshot_2018-07-03_18h18m59s.png
screenshot_2018-07-03_18h18m59s.png
Attachment 5: screenshot_2018-07-03_18h21m09s.png
screenshot_2018-07-03_18h21m09s.png
Attachment 6: screenshot_2018-07-03_18h21m50s.png
screenshot_2018-07-03_18h21m50s.png
Attachment 7: screenshot_2018-07-03_18h24m05s.png
screenshot_2018-07-03_18h24m05s.png
Fixede755 Tue Jul 3 18:48:52 2018 takeshiTARGETHardwareCryo-LH2temperature log of the target
Here is the temperature log of the liquid hydrogen target,
We kept it about 6 days.
Attachment 1: cell0307.png
cell0307.png
Attachment 2: heatshield0307.png
heatshield0307.png
Fixede755 Wed Jul 4 15:34:34 2018 NoriBEAMGeneralN/A37Ca PID at D6
A particle identification plot of 37Ca from LISE run 332.
Attachment 1: run332_pid.pdf
run332_pid.pdf
Pinnede738 Wed Jul 4 17:10:28 2018 daisukeDAQSoftwareN/ASecond VXI for CATS and syncrhonisation diagnosis
Second VXI crate was addedd for CATS. If the synchronisation is not working, there will be error messages in the display of the chassis in trouble (Desktop IOLAN).

The width of FAG is set 100 ns by default setting for both GMTMASTER and GMTSLAVE. A longer width of FAG of GMT slave (like a few micro sec) will result in failure, as the GMT master cannot wait for a signal from the slave no more than 6 micro second which is defined by the signal CT. Make sure the chronograms of GMT are the same as in the figures attached, in case of synchronisation failure.Also confirm the configuration of CENTRUM master (figure attached).
Attachment 1: desktop_2018-07-04_17h00m39s.png
desktop_2018-07-04_17h00m39s.png
Attachment 2: screenshot_2018-07-04_17h03m45s.png
screenshot_2018-07-04_17h03m45s.png
Attachment 3: screenshot_2018-07-04_17h03m49s.png
screenshot_2018-07-04_17h03m49s.png
Attachment 4: screenshot_2018-07-04_17h03m52s.png
screenshot_2018-07-04_17h03m52s.png
Attachment 5: screenshot_2018-07-04_17h03m57s.png
screenshot_2018-07-04_17h03m57s.png
Attachment 6: 2018-07-04_chrono_gmtmaster.png
2018-07-04_chrono_gmtmaster.png
Attachment 7: 2018-07-04_chrono_gmtslave.png
2018-07-04_chrono_gmtslave.png
Attachment 8: das_2018-07-04_17h08m46s.png
das_2018-07-04_17h08m46s.png
Fixede738 Wed Jul 4 18:11:44 2018 louis, daisukeRUNGeneral3-alphaRUN 243
MUST2 data taking with the 3 alpha source (positioned downstream of the target to shoot T1 to T8).
Attachment 1: scaler_2018-07-04_18h07m35s.png
scaler_2018-07-04_18h07m35s.png
Attachment 2: visu_2018-07-04_18h12m36s.png
visu_2018-07-04_18h12m36s.png
Attachment 3: visu_2018-07-04_18h12m43s.png
visu_2018-07-04_18h12m43s.png
Attachment 4: visu_2018-07-04_18h12m49s.png
visu_2018-07-04_18h12m49s.png
Fixede738 Wed Jul 4 18:43:29 2018 daisukeRUNGeneral3-alphaRUN 244
3 alpha source at 'off-beam-axis' position (right center view from upstream). FAG ~40 Hz (mostly from T1-4)
Attachment 1: scaler_2018-07-04_18h38m39s.png
scaler_2018-07-04_18h38m39s.png
Attachment 2: visu_2018-07-04_18h39m26s.png
visu_2018-07-04_18h39m26s.png
Attachment 3: visu_2018-07-04_18h42m32s.png
visu_2018-07-04_18h42m32s.png
Attachment 4: visu_2018-07-04_18h43m12s.png
visu_2018-07-04_18h43m12s.png
Fixede738 Thu Jul 5 10:47:42 2018 louis, serge, pierre, daisukeRUNGeneral3-alphaRUn 245
3 alpha source, off beam, low down position . FAG 40 Hz. Likely due to beta rays (see the attachment)
Attachment 1: scaler_2018-07-05_10h26m15s.png
scaler_2018-07-05_10h26m15s.png
Attachment 2: visu_2018-07-05_10h26m16s.png
visu_2018-07-05_10h26m16s.png
Attachment 3: visu_2018-07-05_10h26m37s.png
visu_2018-07-05_10h26m37s.png
Attachment 4: visu_2018-07-05_10h26m46s.png
visu_2018-07-05_10h26m46s.png
Attachment 5: visu_2018-07-05_10h27m13s.png
visu_2018-07-05_10h27m13s.png
Fixede738 Thu Jul 5 10:49:40 2018 louis, serge, pierre, daisukeRUNGeneral3-alphaRUn 245
3 alpha source, off beam, low down position . FAG 40 Hz. Likely due to beta rays (see the attachment)
Attachment 1: scaler_2018-07-05_10h26m15s.png
scaler_2018-07-05_10h26m15s.png
Attachment 2: visu_2018-07-05_10h26m16s.png
visu_2018-07-05_10h26m16s.png
Attachment 3: visu_2018-07-05_10h26m37s.png
visu_2018-07-05_10h26m37s.png
Attachment 4: visu_2018-07-05_10h26m46s.png
visu_2018-07-05_10h26m46s.png
Attachment 5: visu_2018-07-05_10h27m13s.png
visu_2018-07-05_10h27m13s.png
Fixede738 Thu Jul 5 11:08:04 2018 pierre, louis daisukeRUNGeneralN/ARUN 249
cats 1 pulser calibration. trigger cats1%1
Attachment 1: scaler_2018-07-05_11h04m06s.png
scaler_2018-07-05_11h04m06s.png
Attachment 2: visu_2018-07-05_11h04m05s.png
visu_2018-07-05_11h04m05s.png
Fixede738 Thu Jul 5 14:12:18 2018 LouisMUST2General3-alphaRUN 253 calib alpha
Attachment 1: scaler_2018-07-05_13h24m41s.png
scaler_2018-07-05_13h24m41s.png
Attachment 2: visu_2018-07-05_13h24m40s.png
visu_2018-07-05_13h24m40s.png
Attachment 3: visu_2018-07-05_13h24m48s.png
visu_2018-07-05_13h24m48s.png
Attachment 4: visu_2018-07-05_13h25m03s.png
visu_2018-07-05_13h25m03s.png
Attachment 5: visu_2018-07-05_13h26m10s.png
visu_2018-07-05_13h26m10s.png
Pinnede738 Thu Jul 5 18:33:54 2018 gilles,fred,J-C,daisukeDAQHardwareN/ACaviar DAQ merged.
The VME crate of CAVIAR was integraded to the DAQ controlled by the GMT master of MUST2.

One caution. The visual scaler will not refresh if the TGV module of CAVIAR is listed in the configuration files
/home/e748/ganacq_manip/e755/das-save/e755_echelles.sav
and
/home/e748/ganacq_manip/e755/das-save/echelle.sav


Every time DAS configurations are saved, these files will be rewritten and the TGV module will be added. In such as case, run the macro

/home/e748/ganacq_manip/e755/das-save/echelle_without_caviar/copy_echelles.sh

This will remove the TGV module from these configuration files and make the visual scaler refreshing.
Attachment 1: rc_2018-07-05_18h32m56s.png
rc_2018-07-05_18h32m56s.png
Attachment 2: das_2018-07-05_18h32m46s.png
das_2018-07-05_18h32m46s.png
Attachment 3: das_2018-07-05_18h32m18s.png
das_2018-07-05_18h32m18s.png
Attachment 4: scaler_2018-07-05_18h32m06s.png
scaler_2018-07-05_18h32m06s.png
Attachment 5: desktop_2018-07-05_18h25m17s.png
desktop_2018-07-05_18h25m17s.png
Fixede738 Thu Jul 5 19:22:18 2018 daisukeRUNGeneral3-alphaRUN 256
3 alpha measurement after merging CAVIAR vme to the DAQ
Attachment 1: scaler_2018-07-05_19h21m55s.png
scaler_2018-07-05_19h21m55s.png
Attachment 2: visu_2018-07-05_19h21m38s.png
visu_2018-07-05_19h21m38s.png
Attachment 3: visu_2018-07-05_19h21m41s.png
visu_2018-07-05_19h21m41s.png
Attachment 4: visu_2018-07-05_19h21m44s.png
visu_2018-07-05_19h21m44s.png
Pinnede738 Thu Jul 5 19:26:31 2018 daisukeMUST2HardwareN/AMUST2 BT/HT
Attachment 1: screenshot_2018-07-05_19h23m54s.png
screenshot_2018-07-05_19h23m54s.png
Attachment 2: screenshot_2018-07-05_19h24m07s.png
screenshot_2018-07-05_19h24m07s.png
Attachment 3: screenshot_2018-07-05_19h24m17s.png
screenshot_2018-07-05_19h24m17s.png
Attachment 4: screenshot_2018-07-05_19h24m24s.png
screenshot_2018-07-05_19h24m24s.png

ELOG Home Page