Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Ongoing | e738 |
Mon Jul 9 23:21:55 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | Here are the temperature logs of the liquid
H2 target up to now.
I would share the log during the regeneration. |
  |
Fixed | e738 |
Mon Jul 9 23:25:10 2018 |
takeshi | RUN | General | Cryo-LH2 | run summary for 10C beam | With 10C beam, we have obtained
31.7 hours of liq. H2 target and
1.2 hours of empty target.
|
|
Ongoing | e738 |
Wed Jul 11 08:32:42 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
 |
Ongoing | e738 |
Thu Jul 12 13:49:38 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
 |
Fixed | e738 |
Fri Jul 13 04:09:10 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature of the target | We found the target temperature suddenly increased
at around 3:40 13th.
The online beam image is still indicating |
|
Fixed | e738 |
Fri Jul 13 09:03:11 2018 |
takeshi | RUN | General | Cryo-LH2 | run summary 9C + H2 | Here is the run summary of the setting 9C
beam + liquid H2 target.
Up to now, we have obtained 78 hours data, |
|
Fixed | e738 |
Sat Jul 14 09:57:36 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | target temperature during night | I would share the temperature log of the target
as it was liquefied 21:00 13th. |
|
Fixed | e738 |
Sun Jul 15 00:48:03 2018 |
takeshi | RUN | General | N/A | run summary | Here are the run summary of E738 experiment
up to 1:00 am 15th.
31.7 hours for 10C + H2
|
|
Fixed | e738 |
Sun Jul 15 01:26:49 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | Here are the temperature log of the target
before it was evaporated. |
 |
Fixed | e738 |
Sun Jul 15 19:05:20 2018 |
takeshi | RUN | General | N/A | run summary of E738 | Runsmmary of the E738 experiment.
31.7 hours for 10C + H2
1.2 hours for 10C + empty
|
|
Fixed | e755 |
Thu Jun 21 08:30:48 2018 |
shumpei, daisuke | RUN | General | 3-alpha | RUN0040 8 MeV source run with liquid hydrogen | RUN 0040. started 7:23 am
8 MeV source was set upstream at 0 degrees |
   |
Fixed | e738 |
Sat Jul 7 14:33:45 2018 |
shumpei takeshi megumi | TARGET | Hardware | Cryo-LH2 | Liquid H2 status | We start liquifying H2 at 14:09 and seems
to be filled at 14:29. |
|
Fixed | e744 |
Fri May 25 17:42:21 2018 |
shumpei | MUST2 | Software | N/A | CsI energy calibration for MUST2 telescopes | Calibration parameter for MUST2 CsI crystals
are calculated with run1001-1006.
Attached are dE(DSSD)-E(CsI) plot of all |
6x |
Fixed | e744 |
Mon Jun 4 18:45:15 2018 |
shumpei | MUST2 | Hardware | N/A | No data for two CsIs of MUST2 | During E744 experiment, two CsI crystals (number
1 & 10) of MM2 had no data as attached.
When the M2C chamber was opened today, I |
 |
Fixed | e755 |
Thu Jun 14 19:03:06 2018 |
shumpei | OFFLINE | Hardware | N/A | 8MeV alpha source T5&T6 | 8MeV alpha source image on the target was
reconstructed from T5&T6 hit position and
target position information.
|
|
Fixed | e755 |
Sat Jun 23 06:10:01 2018 |
shumpei | OFFLINE | Software | CH2 | 40Ca(p,d)39 reaction | Quick off-line analysis for 40Ca(p,d)39 reaction
is shown.
Used gate - target image and dE-E cut for |
   |
Fixed | e755 |
Sun Jun 24 22:25:53 2018 |
shumpei | MUST2 | Hardware | Cryo-empty | threshold for DSSDs of MUST2 | Threshold of DSSDs were changed (see entry
638).
Run 106 was analyzed and now the threshold |
|
Fixed | e755 |
Tue Jun 26 06:55:51 2018 |
shumpei | OFFLINE | Software | Cryo-LH2 | 38Ca (p,t) 36Ca | Run 111 - 134 (almost 1 day) data was analyzed.
38Ca (p,t) 36 Ca was reconstructed
only from Telescope 3. |
|
Fixed | e755 |
Thu Jun 28 19:58:12 2018 |
shumpei | OTHER | General | N/A | Kinematics for the reactions | Kinematics for the reaction of E755 and E738
experiments are shown. |
|
Ongoing | e744 |
Sun May 20 19:11:57 2018 |
ruxandra cristina giuseppe jaromir | EXL-PPT | Hardware | 60Co | EXL-addback and light leak considerations | in the middle of the considerations - pdf
file
|
|