Fixed, e755, Mon Jul 2 07:37:50 2018, Louis, OFFLINE, General, Cryo-LH2, Background
|
RUN: 86 to 89
Beam time: 2h30
Beam 40Ca with empty target
|
Fixed, e755, Tue Jul 3 10:47:01 2018, Louis, RUN, General, Cryo-LH2, Run beam tuning
|
RUN 236:
started 10h46, stop at 11h09
|
Fixed, e755, Tue Jul 3 11:48:30 2018, Louis, RUN, General, Cryo-LH2, Run 238 40Ca 18x
|
RUN 238:
START 11h23 STOP 12h50
|
Fixed, e755, Tue Jul 3 13:37:19 2018, Louis, RUN, General, Cryo-LH2, RUN 239  
|
Run 239
start at 13h30, stop at 15h18
|
Fixed, e755, Tue Jul 3 15:22:26 2018, Louis, RUN, General, Cryo-LH2, RUN 240
|
Run 240
start at 15h17, stop at
|
Fixed, e755, Tue Jul 3 17:54:44 2018, Louis, RUN, General, Cryo-LH2, Run 241, 242 22x
|
RUN 241
start at 17h12, stop at 17h35
|
Fixed, e738, Thu Jul 5 14:12:18 2018, Louis, MUST2, General, 3-alpha, RUN 253 calib alpha    
|
|
Fixed, e748, Sun Jul 2 23:20:43 2017, LISE team JCT+ChrS, BEAM, General, N/A, Identification plot LISE Run 119
|
Run 119 2nd July started at 22h20 (around)
Lise trigger
PID ED4_TED4HF without wedge
|
Fixed, e755, Thu Jun 21 09:16:01 2018, Kitamura, TARGET, Hardware, N/A, Vapor pressure 
|
Vapor pressures of isobutane and CF4. The paramateres of the Antoine equation were taken from the following NIST
pages.
|
Fixed, e748, Sun Jul 9 09:07:31 2017, Jean-Charles Valérie L. Daisuke Shumpei, RUN, General, CD2, Run 376 LISE tuning (underway) 
|
RUN 376 short run to check beam profile during LISE tuning.
9h07 started
|
Fixed, e748, Sun Jul 9 09:13:54 2017, Jean-Charles Valérie L. Daisuke Shumpei, RUN, General, CD2, Run 377 LISE tuning (underway)  
|
RUN 376. LISE tuning to optimize the beam spot on target. During this run, the beam stop will be moved.
9h12 started
|
Fixed, e744, Sat May 26 16:31:53 2018, Jaromir, Giuseppe, EXL-PPT, Software, N/A, EXL calibration, light leak    
|
Selector.C can be used to adjust energy bad reconstruction in the EXL detectors due to energy leak (see the PDF attached for more information about it)
once we already have the coefficients for the energy on EXL crystals. To operate with it, for first calibration coefficient must be deduced. Once it is
done the slopes and offset of the calibration have to be inserted in Selector.C file at lines 41 (a[19]) and at line 49 (b[19]). After thqt thresholds |
Fixed, e738, Wed Jul 11 18:31:23 2018, Jacques, Didier, Louis, RUN, General, Cryo-LH2, Run 349 6x
|
Run 349
Start 18h22 Stop 18h47
|
Fixed, e738, Fri Jul 13 21:15:53 2018, J-C, nori, shumpei, takeshi, hide, didier, serge, daisuke, RUN, General, Cryo-empty, RUN 375: 12C pilot run 8x
|
12C beam + empty target after measurement of 9C momentum distribution.
trigger t1-8 + cats 1 2 %30000 + plastic %10000
start 20h47 / stop 21h08
|
Fixed, e738, Fri Jul 13 18:07:04 2018, J-C, cristelle, nori, olivier, daisuke, RUN, General, Cryo-empty, RUN 373 
|
12C 5+ beam. CATS2 trigger.
17h29 start
17h41 stop |
Fixed, e738, Fri Jul 13 18:08:31 2018, J-C, cristelle, nori, olivier, daisuke, RUN, General, Cryo-empty, RUN 374 6x
|
12C5+ beam. Trigger T1-8 + CATS1%30000 + CATS2%30000 + Plastic%10000.
Target empty (under cooling).
beam intensity 350 enA
|
Fixed, e744, Sat May 26 05:16:12 2018, Iulian Valerian, pedja, mihai, TARGET, General, CH2, Target change
|
Target No 4 is placed in-beam 5h15. |
Fixed, e744, Sat May 26 06:05:13 2018, Iulian Valerian Pedjia, TARGET, General, CH2, Target issue No5
|
In the attached figure it could be seen that with the target No5 (run 2010) lower energy resonances were visible (lower part of the figure), which is not
the case with the target No4 (upper part)from run 2013.
|
Ongoing, e744, Tue May 15 21:32:46 2018, Iulian Valerian, EXL-PPT, General, 60Co, run #300 60 Co source EXL & PPT trigger
|
[U][B]Run #300[/B][/U]
PPT EXL trigger 60Co
|
Fixed, e744, Wed May 16 18:01:47 2018, Iulian Valerian, MUST2, Software, N/A, First successful Calimero run on T1 voie X run 316
|
First successful Calimero run on T1 voie X run 316 |
|