Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e755 |
Mon Jul 2 07:37:50 2018 |
Louis | OFFLINE | General | Cryo-LH2 | Background |
RUN: 86 to 89
Beam time: 2h30
Beam 40Ca with empty target
Background has been analyzed for 37Capd from run of 40Ca beam on empty target.
Figure shows excitation energy for all Z in 37Ca(p,d), background associated and background substraction
remarks:
As Ionization chamber was not fonctional during 40Ca beam time, it is not possible to apply Z cuts on background. The substraction is so not yet applied in analysis. Solution to reach this goal is under developement |
Fixed | e755 |
Tue Jul 3 10:47:01 2018 |
Louis | RUN | General | Cryo-LH2 | Run beam tuning |
RUN 236:
started 10h46, stop at 11h09
RUN 237:
started 11h18, stop at 11h20
Beam tunning |
Fixed | e755 |
Tue Jul 3 11:48:30 2018 |
Louis | RUN | General | Cryo-LH2 | Run 238 40Ca |
RUN 238:
START 11h23 STOP 12h50
Beam: 40Ca at 1.8*10⁵pps
Trigger: T1 to T8, CATS1div, CATS2div, Plastic
Target: LH2 |
Fixed | e755 |
Tue Jul 3 13:37:19 2018 |
Louis | RUN | General | Cryo-LH2 | RUN 239 |
Run 239
start at 13h30, stop at 15h18
beam: 40Ca at 2.3*10⁵pps
target: LH2
trigger: T1 to T8, CATS1div, CATS2div,PLASTICdiv |
Fixed | e755 |
Tue Jul 3 15:22:26 2018 |
Louis | RUN | General | Cryo-LH2 | RUN 240 |
Run 240
start at 15h17, stop at
beam: 40Ca at 2*105pps
target: LH2
trigger: T1 to T8, CATS1div, CATS2div,PLASTICdiv |
Fixed | e755 |
Tue Jul 3 17:54:44 2018 |
Louis | RUN | General | Cryo-LH2 | Run 241, 242 |
RUN 241
start at 17h12, stop at 17h35
beam: 40Ca at 1*105pps
target: LH2
trigger: T1 to T8, CATS1div, CATS2div,PLASTICdiv
RUN 242
start at 17h35, stop at
beam: 40Ca at 1*105pps
target: LH2
trigger: T1 to T8, CATS1div, CATS2div,PLASTICdiv |
Fixed | e738 |
Thu Jul 5 14:12:18 2018 |
Louis | MUST2 | General | 3-alpha | RUN 253 calib alpha |
|
Fixed | e748 |
Sun Jul 2 23:20:43 2017 |
LISE team JCT+ChrS | BEAM | General | N/A | Identification plot LISE Run 119 |
Run 119 2nd July started at 22h20 (around)
Lise trigger
PID ED4_TED4HF without wedge
Brho1=Brho2= 2.3869 T.m
FH31 +/-7 mm ; FH43 +/- 4.1mm
270nA ; REd 1/5 L1; 1/15 L2
channels in the plot
12Be TD4HF 3120 cx ; ED4 6140 cx
14B TD4HF 6000 cx ; ED4 9614 cx
16C TD4HF 7953 cx ; ED4 12860 cx |
Fixed | e755 |
Thu Jun 21 09:16:01 2018 |
Kitamura | TARGET | Hardware | N/A | Vapor pressure |
Vapor pressures of isobutane and CF4. The paramateres of the Antoine equation were taken from the following NIST
pages.
Isobutane: https://webbook.nist.gov/cgi/cbook.cgi?ID=C75285&Mask=4&Type=ANTOINE&Plot=on
CF4: https://webbook.nist.gov/cgi/cbook.cgi?ID=C75730&Mask=4&Type=ANTOINE&Plot=on
MODIFIED ATTACHMENT FILES: vertical axes were fixed |
Fixed | e748 |
Sun Jul 9 09:07:31 2017 |
Jean-Charles Valérie L. Daisuke Shumpei | RUN | General | CD2 | Run 376 LISE tuning (underway) |
RUN 376 short run to check beam profile during LISE tuning.
9h07 started
9h10 stopped |
Fixed | e748 |
Sun Jul 9 09:13:54 2017 |
Jean-Charles Valérie L. Daisuke Shumpei | RUN | General | CD2 | Run 377 LISE tuning (underway) |
RUN 376. LISE tuning to optimize the beam spot on target. During this run, the beam stop will be moved.
9h12 started
9h35 stopped.
Images from final settings are attached. |
Fixed | e744 |
Sat May 26 16:31:53 2018 |
Jaromir, Giuseppe | EXL-PPT | Software | N/A | EXL calibration, light leak |
Selector.C can be used to adjust energy bad reconstruction in the EXL detectors due to energy leak (see the PDF attached for more information about it) once we already have the coefficients for the energy on EXL crystals. To operate with it, for first calibration coefficient must be deduced. Once it is done the slopes and offset of the calibration have to be inserted in Selector.C file at lines 41 (a[19]) and at line 49 (b[19]). After thqt thresholds must be fixed (line 58, tr[19]) and also gains on the pairs. We deduced gains as the ratio between x-axis and y-axis of each uncalibrated matrix: for each pair (1-2,3-4,5-6,...,17-18) we took the ratio between x=2000;4000;6000 and the respective y value, and y=2000;4000;6000 and the respective x values. taking the averages of those ratios; those were than used as the coefficients R1ex[9] and R2ex[9] in Selector.C (all information on those values and how are used are in EXL.pdf).
Once the variables are set, the program can be executed using the batch file in attachement by typing the line root rootdir/run_number.root -b batch -q from terminal. Here "run_number" is the name of the run to use. It will generate then a .root file (in attachement some output file for run 0430.root). Now the name is "whatever_output.root", and can be changed from "Selector.C"
The program also provides randomization of bins for the operation of sym between contiguous crystals
|
Fixed | e738 |
Wed Jul 11 18:31:23 2018 |
Jacques, Didier, Louis | RUN | General | Cryo-LH2 | Run 349 |
Run 349
Start 18h22 Stop 18h47
========================================
Beam: 9C
2.3*10**5pps in CATS1
1.9*10**5pps in CATS2
3.1*10**5pps in CAVIAR
2uA of intensity of the primary beam
CATS1 670V 0.14 ľA
CATS2 650V 0.10 ľA
========================================
Pressure in CAVIAR has been changed from 20mbar to 10mbar because we lost the position correlation with respect to the TOF |
Fixed | e738 |
Fri Jul 13 21:15:53 2018 |
J-C, nori, shumpei, takeshi, hide, didier, serge, daisuke | RUN | General | Cryo-empty | RUN 375: 12C pilot run |
12C beam + empty target after measurement of 9C momentum distribution.
trigger t1-8 + cats 1 2 %30000 + plastic %10000
start 20h47 / stop 21h08
During this run, wien filter was tuned to center the beam vertically. Final setting is 2.5 kV for negative and 2.5 kV for positive.
The run started with a primary beam intensity of 350 enA. We found that CAVIAR is counting too much and leakage current of CATS1 (0.18 micro A) and 2 (0.14 micro A) are higher than in the 9C measurement. We reduced the beam intensity to 220 enA. The leakage current of CATS1 and 2 are 0.10 and 0.08 micro A, respectively. The plastic rate is about 80 kpps. |
Fixed | e738 |
Fri Jul 13 18:07:04 2018 |
J-C, cristelle, nori, olivier, daisuke | RUN | General | Cryo-empty | RUN 373 |
12C 5+ beam. CATS2 trigger.
17h29 start
17h41 stop |
Fixed | e738 |
Fri Jul 13 18:08:31 2018 |
J-C, cristelle, nori, olivier, daisuke | RUN | General | Cryo-empty | RUN 374 |
12C5+ beam. Trigger T1-8 + CATS1%30000 + CATS2%30000 + Plastic%10000.
Target empty (under cooling).
beam intensity 350 enA
Fente 31 +/-5 mm
Fente 43 +/-10 mm (both H and V)
Beam energy 55.02 MeV/u |
Fixed | e744 |
Sat May 26 05:16:12 2018 |
Iulian Valerian, pedja, mihai | TARGET | General | CH2 | Target change |
Target No 4 is placed in-beam 5h15. |
Fixed | e744 |
Sat May 26 06:05:13 2018 |
Iulian Valerian Pedjia | TARGET | General | CH2 | Target issue No5 |
In the attached figure it could be seen that with the target No5 (run 2010) lower energy resonances were visible (lower part of the figure), which is not the case with the target No4 (upper part)from run 2013.
GOODFELLOW or mounting error? |
Ongoing | e744 |
Tue May 15 21:32:46 2018 |
Iulian Valerian | EXL-PPT | General | 60Co | run #300 60 Co source EXL & PPT trigger |
Run #300
PPT EXL trigger 60Co
start 21:32:06 15/05/2018 |
Fixed | e744 |
Wed May 16 18:01:47 2018 |
Iulian Valerian | MUST2 | Software | N/A | First successful Calimero run on T1 voie X run 316 |
First successful Calimero run on T1 voie X run 316 |