MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 28 of 48  Not logged in MUST2
Fixed, e744, Fri May 25 21:37:45 2018, iulian nicolas valérie, RUN, General, N/A, run 1012 all triggers 14O beam in D4 Run1012_E1_TcatsHF.pngRun1012_E1_T1HF_D6.png
Fixed, e744, Fri May 25 22:03:12 2018, e744 Must2+LISE teams, RUN, General, CH2, RUNS 2000, 2001 6x
Beam 14O
Run 2000 start with all triggers, including LISE trigger, during 1 minute for tests.
start 22:00:58; stop

Run 2001 start 25-05-18_22h01m19s ; stop 22h15
Run 2002 start 25-05-18_22h16m01s ;stop 22h30 problem
Run 2003 start at 22:16 stop 22:30 DAQ blocked
No Lise trigger; All trigger MUST2, CatsDiv, Div =3.10**4
EXL div 300; PPT div 100
CATS from 440-500 pps
opening FH31 slits

Target n°6 CH2

signed by the LISE Jean-Charles, Luc, and MUST2 teams, Iulan, Valérian, Fairouz, Nicolas, Valérie, Valdir

NB the MMimpact plot showed that T4 was not counting. Ord 4 was not counting in the scalers.
>>>>>>>>>>>>>>>Telescope T4 Dssd has tripped during run 2002-2003 cf MMimpactRun2003.png
Thne HT on T4 was put on for next runs, see Run 2005,... in the next entries.
Fixed, e744, Fri May 25 22:46:26 2018, e744 Must2+LISE teams, edit Valérie, RUN, General, CH2, RUN 2004 6x

Run 2004 Date : 25/05/2018 22:45:58 25/05/2018 23:17:39
End of Run, error Narval see snapshot ProblemNarvalRCCEndRun2004.png

14O beam ; Target n°6 CH2
trig MUST2, CATS, EXL, PPT
T4 ON HT after trip>>>>>>>>>>cf PLOT HT ON
No Lise trigger; All trigger MUST2, CatsDiv, Div =3.10**4
EXL div 300; PPT div 100
CATS 2 10**5 pps

MUST2 thresholds at 1 MeV for all Telescopes
ConfigDASThresTel5at1MeV.png ConfigDASThresMUST2at1MeV.png
NB: problem on EXL ch17 and ch18 cf EXLCsIRawPROBLEMCh17and18Run2004.png

signed by the LISE Jean-Charles, Luc, and MUST2 teams, Iulan, Valérian, Fairouz, Nicolas, Valérie, Valdir

Fixed, e744, Fri May 25 23:26:23 2018, e744 Must2+LISE teams, edit Valérie, RUN, General, CH2, START NARVAL, new version ResolProblemNarvalEndofRun25may23h.png
the NARVAL version is now reinstalled by Fred Saillant.
see plot ResolProblemNarvalEndofRun25may23h.png
Fixed, e744, Fri May 25 23:33:27 2018, iulian, OTHER, Hardware, CH2, changes after run 2004 impact_matrix_run_2005.png
Target was changed to target number 5 (CH2 100 um GOODFELLOW)
The T_EXL1718 ok

NB: Tcats delay is 300ns (since this afternoon)
Fixed, e744, Sat May 26 00:24:50 2018, e744 valérie, DAQ, General, CH2, change of trigger and division TRIGGERgmtChangedForCATS.png
TRIGGER entry for CATS, presently IN8, seems to be not running. We put it on IN7(Gatconf =64).
divisions EXL 10**4
PPT 3000
CATS 3 10**4
Fixed, e744, Sat May 26 00:38:38 2018, e744 all night shift teams, (edit) Valérie, RUN, General, CH2, Run 2010 20x
RUN 2010
Date : 26/05/2018 00:37:44
Target n°5 CH2 100 µm
140 all triggers except LISE
TRIGGER entry for CATS IN7 (Gatconf =64).
divisions EXL 10**4
PPT 3000
CATS 3 10**4
--------------------------------------------------
thresholds on all MUST2 : 1 MeV
pedestals CsI (high thr, haut seuil) 8210 ; (low thr, bas seuil) 8160
check GMT chronogramme GMT Master Val 2.5 µs.
- - - - - - - - - -
cf MM impacts at 00h53:Run2010_impactMM_14O_26may.png
1h18 Run2010MMimpactStatat1h18.pngand at 1h53 Run2010MMimpactStatat1h53.png

Signed by shift team, Iulan, Valérian, Valérie
-----------------------------
Missing strips:
x
MM1 1
MM2 5
MM3 0
MM4 2
MM5 0
y:
MM1 3
MM2 1
MM3 0
MM4 6
MM5 3
Fixed, e744, Sat May 26 01:41:19 2018, e744 night shift team, edit valérie, DAQ, General, CH2, summary GMT, DAS config since run2005 chronoGMTmasterRun14O.pngchronogramGMTslave_Run14O.pngConfigDASThresMUST2at1MeV.pngConfigTDCTestParamInpectch0.png
Triggers: all except LISE

IN1 to IN5 : MM1 to MM5;
IN7: CATS
IN10: PPt; IN11: EXL
(IN13:LISE not in the trigger)
DIV CATS = 3. 10**4
DIV EXL = 10**4
DIV PPT= 3000
divisions EXL
PPT
CATS 3 10**4
--------------------------------------------------
thresholds on all MUST2 : 1 MeV
pedestals CsI (high thr, haut seuil) 8210 ; (low thr, bas seuil) 8160
Run 14O check GMT chronogramme GMT Master Val 2.5 µs. chronoGMTmasterRun14O.png
GMT slave chronogramGMTslave_Run14O.png
Fixed, e744, Sat May 26 02:39:18 2018, Mihai, Pedja, RUN, General, CH2, Run 2011, Target n°5 9x
RUN 2011
Date : 26/05/2018
Beam used: 14O
Start: 2h26
Stop: 4h21


-----------------------------
Missing strips:
x
MM1 1
MM2 6
MM3 0
MM4 2
MM5 0
y:
MM1 3
MM2 1
MM3 0
MM4 7
MM5 3.5
Fixed, e744, Sat May 26 04:24:16 2018, Mihai, Pedja, RUN, General, CH2, Run 2012, Target n°5 Scalers_start_run2012.png
RUN 2012
Date : 26/05/2018
Beam used: 14O
Start: 4h23
Stop: 4h57

suspect the target is too thick, low resonances seen... run stopped in order to check it.


-----------------------------
Missing strips:
x
MM1 1
MM2 6
MM3 0
MM4 2
MM5 0
y:
MM1 3
MM2 1
MM3 0
MM4 7
MM5 3
Fixed, e744, Sat May 26 05:16:12 2018, Iulian Valerian, pedja, mihai, TARGET, General, CH2, Target change 
Target No 4 is placed in-beam 5h15.
Fixed, e744, Sat May 26 05:23:12 2018, Mihai, Pedja, RUN, General, CH2, Run 2013, Target n°4 Scalers_start_run2013.pngRun2014MM_IMPACT5h53.png
RUN 2013
Date : 26/05/2018
Beam used: 14O
Start: 5h18
Stop: 5h48




-----------------------------
Missing strips:
x
MM1 1
MM2 6
MM3 0
MM4 2
MM5 0
y:
MM1 3
MM2 1
MM3 0
MM4 7
MM5 3
Fixed, e744, Sat May 26 05:51:00 2018, Mihai, Pedja, RUN, General, CH2, Run 2014, Target n°4 9x
RUN 2014
Date : 26/05/2018
Beam used: 14O
Start: 5h50
Stop: 7h19

Stopped, because no beam due to a vacuum problem on CSS1



-----------------------------
Missing strips:
x
MM1 1
MM2 6
MM3 0
MM4 2
MM5 0
y:
MM1 3
MM2 1
MM3 0
MM4 7
MM5 3
Fixed, e744, Sat May 26 06:05:13 2018, Iulian Valerian Pedjia, TARGET, General, CH2, Target issue No5 Target_Issue_2004_2010_corrected_withGeorgesTarget.png
In the attached figure it could be seen that with the target No5 (run 2010) lower energy resonances were visible (lower part of the figure), which is not the case with the target No4 (upper part)from run 2013.

GOODFELLOW or mounting error?
Fixed, e744, Sat May 26 09:33:48 2018, Giuseppe, Dieter, RUN, General, CH2, run 2015 MUST2_end_run2016.pngScalers_stop_run2015.pngMUST2_y_ongoing_run2018.png
Missing strips:
x
MM1 1
MM2 6
MM3 0
MM4 2
MM5 0
y:
MM1 3
MM2 1
MM3 0
MM4 7
MM5 3

Fixed, e744, Sat May 26 10:03:37 2018, Giuseppe, Dieter, RUN, General, , run 2016& 2017 


Problems with the ACQ (merger), they were solved by making Breakup and Init
run2016 start@9:45 stop @9:47 (bad run)
run2017 start@9:48 stop @9:49 (bad run)
Fixed, e744, Sat May 26 11:19:37 2018, Giuseppe, Dieter, RUN, General, CH2, interruption due to to waterleak ibn CSS1 
10:50 h Water leak at CSS1
cryo pumps have to be regenerated
continuation until the expert intervention starts is possible
presently waiting for resubmission of the beam

11:40 h started new run (run2019 - see next entry)

11:43 h another leak occurred and it was decided to stop the beam, data taking continues
Fixed, e744, Sat May 26 11:42:03 2018, Giuseppe, Dieter, RUN, General, CH2, run 2019 scalers_start_run2019.pngscalers_stop_run2019.png
Run 2019


start@ 11:40 26/05/2018
stop @ 11:52

the beam intensity dropped to 22 pps so we stopped
Fixed, e744, Sat May 26 14:03:27 2018, Giuseppe, Dieter, J. Eric, RUN, General, CH2, Run 2020 9x
run 2020


start@ 14:02 26/05/2018
stop @ 15:20 26/05/2018
Missing strips:
x
MM1 1
MM2 6
MM3 0
MM4 2
MM5 0
y:
MM1 3
MM2 1
MM3 0
MM4 7
MM5 3
Fixed, e744, Sat May 26 16:31:53 2018, Jaromir, Giuseppe, EXL-PPT, Software, N/A, EXL calibration, light leak batchSelector.CEXL.pdfpairs0102_0910.pdfpairs1112_1718.pdf
Selector.C can be used to adjust energy bad reconstruction in the EXL detectors due to energy leak (see the PDF attached for more information about it) once we already have the coefficients for the energy on EXL crystals. To operate with it, for first calibration coefficient must be deduced. Once it is done the slopes and offset of the calibration have to be inserted in Selector.C file at lines 41 (a[19]) and at line 49 (b[19]). After thqt thresholds must be fixed (line 58, tr[19]) and also gains on the pairs. We deduced gains as the ratio between x-axis and y-axis of each uncalibrated matrix: for each pair (1-2,3-4,5-6,...,17-18) we took the ratio between x=2000;4000;6000 and the respective y value, and y=2000;4000;6000 and the respective x values. taking the averages of those ratios; those were than used as the coefficients R1ex[9] and R2ex[9] in Selector.C (all information on those values and how are used are in EXL.pdf).
Once the variables are set, the program can be executed using the batch file in attachement by typing the line root rootdir/run_number.root -b batch -q from terminal. Here "run_number" is the name of the run to use. It will generate then a .root file (in attachement some output file for run 0430.root). Now the name is "whatever_output.root", and can be changed from "Selector.C"
The program also provides randomization of bins for the operation of sym between contiguous crystals

ELOG Home Page