Fixed, e744, Fri May 25 21:37:45 2018, iulian nicolas valérie, RUN, General, N/A, run 1012 all triggers 14O beam in D4 Run1012_E1_TcatsHF.pngRun1012_E1_T1HF_D6.png
 
Fixed, e744, Fri May 25 22:03:12 2018, e744 Must2+LISE teams, RUN, General, CH2, RUNS 2000, 2001 6x
Beam 14O
Run 2000 start with all triggers, including LISE trigger, during 1 minute for tests.
 start 22:00:58; stop 
Fixed, e744, Fri May 25 22:46:26 2018, e744 Must2+LISE teams, edit Valérie, RUN, General, CH2, RUN 2004 6x

 Run 2004   Date : 25/05/2018 22:45:58  25/05/2018 23:17:39 
End of Run, error Narval see snapshot ProblemNarvalRCCEndRun2004.png
Fixed, e744, Fri May 25 23:26:23 2018, e744 Must2+LISE teams, edit Valérie, RUN, General, CH2, START NARVAL, new version ResolProblemNarvalEndofRun25may23h.png
the NARVAL version is now reinstalled by Fred Saillant.
see plot  ResolProblemNarvalEndofRun25may23h.png
 
Fixed, e744, Fri May 25 23:33:27 2018, iulian, OTHER, Hardware, CH2, changes after run 2004 impact_matrix_run_2005.png
Target was changed to target number 5 (CH2 100 um GOODFELLOW)
The T_EXL1718 ok
Fixed, e744, Sat May 26 00:24:50 2018, e744 valérie, DAQ, General, CH2, change of trigger and division TRIGGERgmtChangedForCATS.png
TRIGGER entry for CATS, presently IN8, seems to be not running. We put it on IN7(Gatconf =64).
divisions EXL 10**4
PPT 3000
Fixed, e744, Sat May 26 00:38:38 2018, e744 all night shift teams, (edit) Valérie, RUN, General, CH2, Run 2010 20x
RUN 2010
Date : 26/05/2018 00:37:44
 Target n°5  CH2 100 µm 
Fixed, e744, Sat May 26 01:41:19 2018, e744 night shift team, edit valérie, DAQ, General, CH2, summary GMT, DAS config since run2005 chronoGMTmasterRun14O.pngchronogramGMTslave_Run14O.pngConfigDASThresMUST2at1MeV.pngConfigTDCTestParamInpectch0.png
 Triggers: all except LISE

IN1 to IN5 : MM1 to MM5;
Fixed, e744, Sat May 26 02:39:18 2018, Mihai, Pedja, RUN, General, CH2, Run 2011, Target n°5 9x
RUN 2011
Date : 26/05/2018 
Beam used: 14O
Fixed, e744, Sat May 26 04:24:16 2018, Mihai, Pedja, RUN, General, CH2, Run 2012, Target n°5 Scalers_start_run2012.png
RUN 2012
Date : 26/05/2018 
Beam used: 14O
Fixed, e744, Sat May 26 05:16:12 2018, Iulian Valerian, pedja, mihai, TARGET, General, CH2, Target change 
Target No 4 is placed in-beam 5h15.
Fixed, e744, Sat May 26 05:23:12 2018, Mihai, Pedja, RUN, General, CH2, Run 2013, Target n°4 Scalers_start_run2013.pngRun2014MM_IMPACT5h53.png
RUN 2013
Date : 26/05/2018 
Beam used: 14O
Fixed, e744, Sat May 26 05:51:00 2018, Mihai, Pedja, RUN, General, CH2, Run 2014, Target n°4 9x
[U][B]RUN 2014[/B][/U]
Date : 26/05/2018 
Beam used: 14O
Fixed, e744, Sat May 26 06:05:13 2018, Iulian Valerian Pedjia, TARGET, General, CH2, Target issue No5 Target_Issue_2004_2010_corrected_withGeorgesTarget.png
In the attached figure it could be seen that with the target No5 (run 2010) lower energy resonances were visible (lower part of the figure), which is not
the case with the target No4 (upper part)from run 2013.
Fixed, e744, Sat May 26 09:33:48 2018, Giuseppe, Dieter, RUN, General, CH2, run 2015 MUST2_end_run2016.pngScalers_stop_run2015.pngMUST2_y_ongoing_run2018.png
Missing strips:
x
MM1 1
Fixed, e744, Sat May 26 10:03:37 2018, Giuseppe, Dieter, RUN, General, , run 2016& 2017 


Problems with the ACQ (merger), they were solved by making Breakup and Init
Fixed, e744, Sat May 26 11:19:37 2018, Giuseppe, Dieter, RUN, General, CH2, interruption due to to waterleak ibn CSS1 
10:50 h Water leak at CSS1
        cryo pumps have to be regenerated
        continuation until the expert intervention starts is possible
Fixed, e744, Sat May 26 11:42:03 2018, Giuseppe, Dieter, RUN, General, CH2, run 2019 scalers_start_run2019.pngscalers_stop_run2019.png
Run 2019

Fixed, e744, Sat May 26 14:03:27 2018, Giuseppe, Dieter, J. Eric, RUN, General, CH2, Run 2020 9x
run 2020

Fixed, e744, Sat May 26 16:31:53 2018, Jaromir, Giuseppe, EXL-PPT, Software, N/A, EXL calibration, light leak batchSelector.CEXL.pdfpairs0102_0910.pdfpairs1112_1718.pdf
Selector.C can be used to adjust energy bad reconstruction in the EXL detectors due to energy leak (see the PDF attached for more information about it)
once we already have the coefficients for the energy on EXL crystals. To operate with it, for first calibration coefficient must be deduced. Once it is
done the slopes and offset of the calibration have to be inserted in Selector.C file at lines 41 (a[19]) and at line 49 (b[19]). After thqt thresholds